§ 25-241 — FOG wastewater discharge permit—Procedures
Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 25-241
Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/c15d26d9-c6e5-4c4e-83c4-754a4cd01847
Sec. 25-241. - FOG wastewater discharge permit—Procedures.
(a) Existing connections. All FOG generators operating from facilities currently connected to the WCTS shall, within 90 days of the effective date of the ordinance from which this division is derived, apply to the control authority for a FOG wastewater discharge permit and shall not cause or allow discharges to the WCTS after 180 days of the effective date except in accordance with a permit issued by the control authority. Prior to issuance of a permit, all FOG generators shall repair or replace any noncompliant plumbing including any existing FOG control device within 90 days of written notification by the control authority if any one or more of the following conditions exist or occur: (1) The user's facility does not have a FOG control device; (2) The user's facility has a defective FOG control device; or (3) Remodeling of the user's food preparation or kitchen waste plumbing system is performed which requires a plumbing permit to be issued by the city. (b) New connections. Any FOG generator which begins operation subsequent to the effective date, whether from an existing or subsequently remodeled or constructed facility, shall apply for and obtain issuance of a permit prior to beginning or recommencing discharge into the WCTS. (c) FOG wastewater discharge permit application. (1) The control authority may require FOG generators to submit all or some of the following information as part of a permit application: a. Identifying information. i. The name and address of the discharging facility, and the names of all principals and owners of the FOG generator. ii. If the FOG generator is the lessee of the discharging property, the name and address of the property owner and the property manager for the property where the FOG generator is located. iii. Contact information for day-to-day contact, description of activities, facilities, and processes of the FOG generator. b. Description of operations. i. A comprehensive description of the FOG generator; its operation, cuisine and service activities. ii. Comprehensive site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, chemical storage areas, and FOG control devices by size, location, and elevation, and all points of discharge. A qualified professional must certify to the accuracy of these submittals for new construction. For existing facilities, the FOG generator may provide a schematic drawing and permit access for inspection by the control authority. iii. NAICS codes defined by section 25-206(d) of all processes being conducted at the facility, if applicable. iv. Number of employees, hours of operation, and proposed or actual hours of operation. v. Seating capacity and table turnover rates, if applicable. vi. Type and amount of raw materials processed (average and maximum per day). c. The location for monitoring all FOG control devices covered by the permit. d. Pollution prevention activities such as source reduction, waste minimization, environmental management systems, best management practices, and water and energy conservation. e. Any other information as requested by the control authority to evaluate the permit application. (2) Incomplete or inaccurate applications may not be processed and may be returned to the FOG generator for revision. (d) Application signatories and certification. (1) All permit applications must be signed by an authorized signatory of the FOG generator and contain the following certification statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitted false information, including the possibility of fine and imprisonment for knowing violations." (e) FOG wastewater discharge permit decisions. The control authority will evaluate the data furnished by the FOG generator and may require submission of additional information. Within 90 days of receipt of a complete permit application, the control authority will determine whether to issue or deny issuance of the permit.
(Code 1992, § 25-241; Ord. No. 89-16, 12-20-2016)
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.
