For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-105 — Permits

The Code of the City of Tempe, Arizona (Supp. No. 34, Update 1: codified through Ordinance No. O2026.34, enacted June 25, 2026) · Tempe City Code § 8-105

Corpus is an independent public-information project, not the official City of Tempe website. Stable reference: corpuslaw.us/code/6d88b097-b161-4793-8197-63494da7fafa

Sec. 8-105. - Permits.

105.1 Required. Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish, change the occupancy or change character/use within an occupancy group of a building or portion thereof or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code or the City of Tempe Construction Codes, or to cause such work to be performed, shall first make application to the building official and obtain the required permit prior to any work being done on the project. 105.1.1 Annual permits. Instead of an individual permit for each alteration to an already approved electrical, gas, mechanical or plumbing installation, the building official is authorized to issue an annual permit upon application therefor to any person, firm or corporation regularly employing one or more approved qualified tradespersons in the building, structure or on the premises owned or operated by the applicant for the permit. 105.1.2 Annual Permit Records. The person to whom an annual permit is issued shall keep a detailed record of all - alterations not generally regarded as maintenance. The building official shall have access to such records at all times or they shall be submitted monthly to the building official together with any plans or working drawings for each alteration. 105.1.2.1 Qualifications. In addition to meeting the general definitions above, a Registered Industrial Plant shall have a full-time or contract employee who is an architect or engineer registered in the State of Arizona who shall be responsible for complying with the provisions of this code and the City of Tempe Construction Codes. 105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or the City of Tempe Construction Codes or any other laws or ordinances of the City of Tempe. Permits shall not be required for the following: Building: a. Radio and television antennae towers not exceeding 35 feet in height. b. Flag poles not exceeding 35 feet in height. c. Works of art not over 7 feet (2133.6 mm) in height and their foundation and supporting structure, provided that no part of which is intended to be occupied or used as shelter. d. One-story detached accessory structures ancillary to R-3 and R-4 occupancies, Detached Single Family Dwellings, Two Family Dwellings or Townhouse used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 200 square feet (18.60 m2) and does not contain any mechanical, electrical or plumbing. e. Fences, other than swimming pool barriers, not more than 7 feet (1829 mm) high as measured to the highest point from the top of the footing. f. Oil derricks. g. Retaining walls which are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, provided the wall is not supporting a surcharge or impounding Class I, II or IIIA liquids. h. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons (18925 L) and the ratio of height to diameter or width does not exceed 2 to 1. i. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade and not over any basement or story below and not part of an accessible route. j. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. k. Temporary motion picture, television and theater stage sets and scenery. l. Prefabricated swimming pools accessory to R-3 and R-4 occupancies, Detached Single Family, Two Family Dwellings or Townhomes which are less than 18 inches (457 mm) deep, are not greater than 5,000 gallons (18925 L) and are installed entirely above ground. m. Shade membrane structures constructed for nursery or agricultural purposes not including service systems. n. Swings and other playground equipment accessory to detached one- and two-family dwellings. o. Window awnings, in R-3, Detached Single Family, Two Family Dwellings or Townhomes and Group U occupancies, supported by an exterior wall projecting not more than 54 inches (1372 mm) from the exterior wall, no closer than 5 feet from a property line, and not requiring additional support. p. Non-fixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height. q. Replacement roof covering, provided the replacement roof covering classification is equal to or greater than the existing roofing classification; the new roof covering does not increase the loads imposed upon the roof structural frame beyond the original design capacity. Exception: replacement of any roof assembly component other than the roof covering requires a permit. r. Decks on R-3, Detached Single Family, Two Family and Townhomes not exceeding 200 square feet (18.58 m2) in area, that are not more than 30 inches (762 mm) above grade at any point, are not attached to a dwelling or townhouse and do not serve the exit door required. s. Special cases as allowed by the building official. Electrical: 1. In R-3 and R-4 occupancies, Detached Single Family Dwellings, Two Family Dwellings or Townhouses, Cord and Plug temporary decorative lighting. 2. In R-3 and R-4 occupancies, Detached Single Family Dwellings, Two Family Dwellings or Townhouses, Repair or replacement of any listed over-current device of the same required capacity in the same location, does not include main over-current devices. 3. Repair or replacement of electrodes or transformers of the same size and capacity for signs or gas tube systems. 4. The installation of any temporary system required for the testing or servicing of electrical equipment or apparatus. 5. The wiring for temporary theater, motion picture or television stage sets where not accessible to the general public. 6. In R-3 and R-4 occupancies, Detached Single Family Dwellings, Two Family Dwellings or Townhouses, Electrical wiring, devices, appliances, apparatus or equipment, not installed in a hazardous location, as defined in Article 500, operating at less than 25 volts and not capable of supplying more than 50 watts of energy. 7. Class 2 and Class 3 control and signal circuits not essential to human life. 8. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installations of towers and antennas. Fuel gas: 1. Portable heating appliance. 2. In R-3 and R-4 occupancies, Detached Single Family Dwellings, Two Family Dwellings or Townhouses, portable cooking or clothes drying appliances 3. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. Mechanical: 1. Portable heating appliance. 2. Portable ventilation equipment. 3. Portable cooling unit. 4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by International Mechanical Code or the International Residential Code. 5. Replacement of any part that does not altering its approval or making it unsafe. 6. Portable evaporative cooler. 7. Self-contained refrigeration system containing 10 pounds (4.54 kg) or less of refrigerant and actuated by motors of 1 horsepower (746 W) or less. 8. Portable fuel cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid. 9. Replacement of an air conditioner unit, furnace, heat pump or evaporative cooler in the same location of equal or less BTU's, cfm and amperage rating and minor modification to electrical, plumbing, and mechanical connections necessary to serve the new appliance in R2, R3, and R4 occupancies, Detached Single Family, Two Family Dwellings or Townhomes where the appliance serves an individual dwelling unit. Plumbing: 1. Stopping of leaks in drains, water, soil, waste or vent pipe, when such work does not require the removal and replacement of pipe, fittings, valves or fixtures. 2. Clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets provided that such repairs do not involve or require the replacement or rearrangements of valves, pipes or fixtures. Replacement of water heating appliances of the same type, fuel source and in the same location of equal or less amperage rating, and minor modification to electrical, plumbing, and mechanical connections to serve the appliance in R3, and R4 occupancies, Detached Single Family, Two Family Dwellings or Townhomes where the appliance serves an individual dwelling unit. 3. Replacement installation of potable water conditioning or treating appliances in the same location, and minor modification to electrical, plumbing, and mechanical connections necessary to serve the appliance in R3 and R4 occupancies, Detached Single Family, Two Family Dwellings or Townhomes where the appliance serves an individual dwelling unit. 105.2.1 Emergency repairs. Where equipment replacements and repairs requiring a permit must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official. 105.2.2 Public service agencies. A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution or metering or other related equipment that is under the ownership and control of public service agencies by established right. Nothing in this section shall be construed to exempt any electrical installation used for lighting, power, heating, ventilation, elevators pumping or for other building or premise operations, nor exempt any service equipment for electrical service to a building or premise. 105.3 Application for permit. To obtain a permit, an applicant shall first file an application therefor in writing through the online permitting portal on a form furnished by the Community Development Department. Such application shall: 1. Identify and describe the work to be covered by the permit for which application is made. 2. Description of the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. 3. Indicate the use and occupancy for which the proposed work is intended. 4. Be accompanied by construction documents and other information as required in Section 107 of this code. 5. State the valuation of the proposed work. 6. Be electronically signed by the applicant or the applicant's authorized agent. 7. Give such other data and information as required by the building official. 8. The estimate of plan review fee shall be paid at the time of being deemed Administratively Complete and shall be per the applicable fee(s) as required in Appendix A, Tempe City Code. 105.3.1 Action on application. The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official shall reject such application in writing, stating the reasons therefore. If the building official is satisfied that the proposed work conforms to the requirements of this code, the City of Tempe Construction Codes and applicable laws and ordinances applicable thereto, the building official shall issue a permit as soon as practicable, subject only to the payment of appropriate fees. 105.3.2 Time limitation of permit application. An application for a permit for any proposed work shall be valid for a period of one year from the date of filing. The building official is not authorized to grant any extension of time. Exceptions: 1. Prior to the date of expiration of any application for which plans have not been approved, the applicant may submit a written request for one-time extension of one-hundred eighty (180) days. The request must explain the justifiable cause for the delay and include a proposed submittal schedule for the completion of the plan review process. If the request for extension is approved, the applicant must submit a new project submittal application along with a renewal fee equal to twenty-five percent (25%) of the original calculated plan review fee. The renewal fee must be paid no later than thirty (30) calendar days after the original expiration date or the original application shall expire. Additional plan review fee may apply as prescribed in Appendix A - Schedule of Fees and Charges, of the City Code. Additionally, all permits must be issued and permit fees paid prior to the end of the one-hundred eighty (180) day of the extension date. 2. Prior to the date of expiration of any application that has been approved for issuance of permit(s) but for which a permit has not been issued, the applicant may request a one-time extension of one-hundred eighty (180) days. The request must explain the justifiable cause for the delay. If the request for extension is approved, the applicant must submit a new project submittal application along with a renewal fee equal to ten percent (10%) of the original calculated plan review fee. The renewal fee must be paid no later than thirty (30) calendar days after the original expiration date or the original application shall expire. Additionally, the permits must be issued and permit fees paid prior to the end of the one-hundred eighty (180) day of the extension date. Exceptions: one (1) and two (2) above may not be combined. 105.4 Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code, the City of Tempe Construction Codes or of any other ordinance of the City of Tempe. Permits presuming to give authority to violate or cancel the provisions of this code, the City of Tempe Construction Codes or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of this code, the City of Tempe Construction Codes or of any other ordinances of this jurisdiction. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. 105.5 Expiration of Permit. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within one (1) year after its issuance, or if the work authorized on the site by such permit is suspended or declared abandoned by the owner for a period of one (1) year after the date the work is commenced, or if the building official declares the permit suspended or abandoned after the expiration of one (1) year from the date of permit issuance. 105.5.1 Work Not Commenced. Every permit issued under the provision of this code and the City of Tempe Construction Codes shall be valid for a period of one (1) year from the date of issuance and any permit shall expire if work authorized by such permit is not commenced and an approved inspection obtained within one (1) year from the date of issuance. An approved inspection shall be an inspection that is requested and approved pursuant to Section 110 of this code. Before work can commence on a structure for which the permit has expired, a reinstatement fee, based on the total valuation of the scope of work, shall be assessed. 105.5.2 Work commenced. Every permit issued under the provision of this code and the City of Tempe Construction Codes shall be valid for a period of one (1) year from the date of the last approved inspection. An approved inspection shall be an inspection that is requested and approved pursuant to Section 110 of this code. Before work can continue or resume on a structure for which the permit has expired, a reinstatement fee, based on the valuation of the uncompleted portion of the work from the last approved inspection, shall be assessed. 105.6 Suspension or revocation. The building official is authorized to suspend or revoke a permit issued under the provisions of this code or the City of Tempe Construction Codes wherever the permit is issued in error or based on incorrect, inaccurate or incomplete information, or in violation of any ordinance, regulation or any of the provisions of this code, the City of Tempe Construction Codes or of other ordinances of this jurisdiction. 105.7 Placement of permit. The building permit or copy thereof shall be kept on the site of the work and prominently displayed until the completion of the project. 105.8 Unfinished buildings or structures. Whenever work has commenced on a building or structure for which a permit has been issued, and said permit has expired pursuant to this code, the owner of the property upon which structure is located, or other person or agent in control of said property, upon receipt of notice in writing from the building official, shall within 30 days from the date of such written notice, obtain a new permit to complete the work and diligently pursue the work to completion, or within said 30 days, obtain a demolition permit and shall remove or demolish the building or structure within 120 days from the date of written notice. Notwithstanding the provisions of the Tempe Administrative Code and this section, whenever work on any building, structure, addition, alteration, appurtenances or repair has commenced, the exterior walls and roof shall be completed in accordance with the approved plans including but not limited to roofing, fenestration and finish materials including paint, within two years of commencing construction. In the absence of evidence to the contrary, the date of the first inspection request shall establish the date that construction commenced. This section shall apply to all permits issued or reinstated pursuant to Section 105.5 of this code.

(Ord. No. O2018.59, § 1, 8-30-18; Ord. No. O2019.24, §§ 3—6, 7-31-19; Ord. No. O2026.24, § 14(Exh. C), 6-4-26)

Ask a question about Tempe law

Corpus searches the Tempe sections it holds and shows the ones that match, with their citations. Free, no sign-in.