§ 9-32 — Annual tests of system performance

The Code of the City of Tempe, Arizona (Supp. No. 34, Update 1: codified through Ordinance No. O2026.34, enacted June 25, 2026) · Tempe City Code § 9-32

Corpus is an independent public-information project, not the official City of Tempe website. Stable reference: corpuslaw.us/code/0eaca21f-1911-4f4e-8b94-93e836c687b2

Sec. 9-32. - Annual tests of system performance.

(a) Annual tests will be conducted by a city-approved RF engineer. The City will provide a list of qualified RF engineers to the building owners. If communications appear to have degraded or if the tests fail to demonstrate adequate system performance, the owner of the building or structure is required to remedy the problem and restore the system in a manner consistent with the original approval criteria. Failure to remedy any problems shall render the building and/or any appendages unsafe under Sections 8-108.1 and 108.1.2. Testing shall consist of the following: (1) In-building coverage test as described in Section 9-31.1; (2) Signal boosters shall be tested to ensure that the gain is the same as it was upon initial installation and acceptance; (3) Backup batteries and power supplies shall be tested under load of a period of one hour to verify that they will properly operate during an actual power outage. If the battery exhibits symptoms of failure within the one-hour test period, the test shall be extended for additional one-hour periods until the integrity of the battery can be determined; (4) All other active components shall be checked to verify operation within the manufacturer's specifications; and (5) At the conclusion of the testing, a report, which shall verify compliance with this article, shall be submitted to the Fire Code Official. (b) Test results, as set forth in Section 9-31.1, shall be provided to city telecommunications staff annually, on or before, the anniversary date of initial acceptance. The re-testing will be performed at no expense to the City or the appropriate emergency services departments as required in the original testing procedures.

(Ord. No. 2001.25, 9-13-01; Ord. No. 2007.54, 8-16-07; Ord. No. O2014.09, 2-27-14)