For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-186 — Pretreatment

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 23-186

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/3ac7f3a6-18b1-4781-865a-430eec4f93eb

Sec. 23-186. - Pretreatment.

(a) All users shall provide the necessary wastewater treatment required to comply with this article and shall achieve compliance with all applicable categorical standards within the time limitations specified therein, or within the time established by the state or by the public works director, whichever is more stringent. Any facilities required to pretreat wastewater to a level acceptable to the public works director shall be provided, operated and maintained at the user's expense. (b) Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the public works director for review and shall be acceptable to the public works director before construction of the facility. The city's review of such plans and operating procedures will not relieve the user from the responsibility of modifying the facility as necessary to produce an effluent which complies with all provisions of this article. (c) Whenever deemed necessary, the public works director may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage waste streams from industrial waste streams, and such other conditions as may be necessary to protect the POTW and determine the user's compliance with the requirements of this chapter. (d) The public works director may require any person discharging into the POTW to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization. (e) The user shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the user to achieve compliance with the conditions of the permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by an industrial user when the operation is necessary to achieve compliance with the conditions of the permit. (f) Users with the potential to discharge flammable substances may be required to install and maintain an approved combustible gas detection meter. (g) Waste solids and/or liquids containing pollutants removed in the course of the user's pretreatment processes shall be properly disposed of in a manner such as to prevent any pollutant from such materials from entering the sewerage system

(Ord. No. 1984, § 2(Exh. A), 3-10-26)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.