For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-199 — Reports of potential problems

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 23-199

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/9d8827e0-bbda-4bd1-8bb5-3ebbf947dcaf

Sec. 23-199. - Reports of potential problems.

(a) If, for any reason, pollutants are discharged at a flow rate or concentration which might cause interference with the POTW or pass-through or which might result in a violation of NPDES permit requirements or requirements of this article or a hazard to city or control authority personnel or the public, the industrial user shall verbally notify the public works director and control authority's director immediately. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken or planned by the user. (b) The verbal report shall be followed by a detailed written report submitted to the public works director within five days. The written report shall describe the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which might be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed under this chapter. (c) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection (a), above. Employers shall ensure that all employees who could cause such a discharge to occur are advised of the emergency notification procedures. (d) Significant industrial users are required to notify the public works director and the applicable control authority's director immediately of any changes at its facility affecting the potential for a slug discharge. (e) A user shall notify the public works director at least ten days in advance of any planned production, operational change, maintenance activity that may cause a violation of the user's permit or this article. The notification shall describe the potential problem, actions the user is taking to prevent a discharge violation, and the contingency plans that will be used if a violation were to occur. (f) The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the city within 30 days after becoming aware of the violation.

(Ord. No. 1984, § 2(Exh. A), 3-10-26)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.