For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 31-18 — Administrative procedures

Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 31-18

Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/c3d19182-be44-4629-9e88-5e30ad2312da

Sec. 31-18. - Administrative procedures.

(a) Water system survey: (1) The city shall review all requests for new connections for water service to determine if backflow protection is needed. Plans and specification must be submitted to the city public services department upon request for review of possible cross connection hazards as a condition of service for new service connections. If it is determined that a backflow prevention assembly is necessary to protect the public water system, the required assembly must be installed before water services will commence. (2) The city may require an on-premise inspection to evaluate cross connection hazards. The city may transmit a written notice requesting an inspection appointment to each affected water user. Any water user who cannot or will not allow an on-premise inspection of his piping system shall be required to install the backflow prevention assembly the city considers necessary. (3) The city may, at it's discretion, require a re-inspection for cross connection hazards of any premise to which it serves water. The city will transmit a written notice requesting an inspection appointment to each affected water user. Any water user who cannot or will not allow an on-premise inspection of his piping system shall be required to install the backflow prevention assembly the city considers necessary. (b) Customer notification—Assembly installation: (1) The city may notify the water user of the survey findings, listing the corrective actions to be taken if any are required. A period of 60 days will be given to complete all corrective actions required, including installations of backflow prevention assemblies. (2) A second notice may be sent to each water user who does not take the required corrective actions prescribed in the first notice within the 60 day period allowed. The second notice will give the water user a two week period to take the required corrective action. If no action is taken within the two week period the city may terminate water service to the affected water user until the required corrective actions are taken. (c) Customer notification—Testing and maintenance: (1) The city may notify each affected water user when it is time for the backflow prevention assembly installed on their service connection to be tested. This written notice shall give the water user 30 days to have the assembly tested and supply the water user with the necessary form to be completed and resubmitted to the city. (2) A second notice may be sent to each water user which does not have his/her backflow assembly tested as prescribed in the first notice within the 30 day period allowed. The second notice will give the water user a two week period to have his/her backflow prevention assembly tested. If no action is taken within the two week period the city may terminate water service to the affected water user until the subject assembly is tested.

(Ord. No. 1195, § 1, 8-6-96)

Ask a question about Fontana law

Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.