18.210.140 LID requirements for regulated projects.
(a) On-Site Low Impact Development Measures. All regulated projects shall implement low impact development on-site source control measures and low impact development site design strategies as set forth in the NPDES stormwater permit. All regulated projects shall design stormwater treatment measures to meet the hydraulic sizing criteria as set forth in the NPDES stormwater permit, C3 Technical Guidance Manual, and SCP guidance manual. All regulated projects requiring planning approval must use the four percent sizing methodology for the design of all stormwater treatment measures. If a project’s site design precludes it from using the four percent sizing, it can opt to use the flow-volume combination sizing (with a three percent minimum of the effective impervious area) if it provides construction level drawings that show the constructability of the stormwater treatment measures. Use of infiltration devices in stormwater treatment systems is limited as set forth in the C3 Technical Guidance Manual and the SCP guidance manual. (b) Bubble Up Systems. Bubble up systems or pop-up emitters are discouraged to the maximum extent practicable and are only allowed when a project has met the sizing requirements set forth in the SCP guidance manual. (c) Permeable Pavement Design Guidelines. The design of any permeable pavement areas as part of a regulated project must meet the guidelines of the C3 Technical Guidance Manual and the SCP guidance manual. (d) Alternate Compliance Off-Site Low Impact Development Treatment. Notwithstanding the provisions of subsection (a) of this section, the authorized enforcement official may, in accordance with the NPDES stormwater permit, authorize a regulated project to provide alternate compliance by treating a portion of the project’s stormwater runoff with LID treatment measures at an off-site project in the same watershed. The applicant must request approval for use of an alternate compliance off-site project location prior to approval of a tentative subdivision map, or, if there is no subdivision map, prior to approval of a building permit for the regulated project. In order to request approval for alternate compliance, the applicant must identify the proposed off-site project location, demonstrate to the satisfaction of the authorized enforcement official that the site is appropriate for use as a LID treatment site, and provide evidence that it has obtained the rights to use the off-site project location and that the off-site project will be constructed within the time frames specified in the NPDES stormwater permit. (Ord. 01-2021 § 1, 2-2-21.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.