§ 18.210.170 — Stormwater control plan
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.210.170
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/08da2146-0448-4234-8ae5-79f839f8ae97
18.210.170 Stormwater control plan.
Each application for a regulated project shall be accompanied by a stormwater control plan that meets the criteria in the NPDES permit and the design guidelines detailed in the most recent Clean Water Program C3 Technical Guidance Manual. Any guidelines, design standards, or requirements that are specific to the city of Fremont can be found in the stormwater control plan guidance manual. The stormwater control plan shall demonstrate how stormwater flows on the site will be controlled, managed and treated in accordance with the requirements of this chapter. The stormwater control plan must be approved by the authorized enforcement official or designee prior to final subdivision map approval, if applicable, or the issuance of any other permit or approval. (Ord. 01-2021 § 1, 2-2-21.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
