§ 18.210.220 — Construction phase requirements
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.210.220
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/72d68ae2-1dc6-4a2b-aa43-46e0013ae3eb
18.210.220 Construction phase requirements.
(a) Construction Phase Inspections. The city requires inspections of stormwater management facilities during the construction process to verify proper installation. The development project will not receive final permit or improvement plan approval without obtaining approval by the authorized enforcement official. (b) Certificate of Compliance. Development projects may be required to provide to the environmental services division a certificate of proper installation of stormwater management facilities. The certificate must be signed and stamped by a professional engineer or landscape architect and be received prior to the project receiving final permit or improvement plan approval. (c) As-Built Plans. All applicants are required to submit as-built plans for any permanent stormwater management facilities after final construction is completed, if construction deviated from the approved plans. The plan shall show the final design specifications for all stormwater management facilities and shall be stamped by a registered professional engineer. A final inspection by the city of Fremont environmental services division is required prior to the development project receiving final permit or improvement plan approval. (d) Inadequacy of the System. If a stormwater management facility is found to be inadequate by virtue of physical evidence of operational failure, even though it was built as called for in the approved stormwater management plan, it shall be corrected by the applicant before the development project receives final permit or improvement plan approval. If the applicant fails to act, the city may use the performance bond to complete the work. (Ord. 01-2021 § 1, 2-2-21.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.