§ 13.32.090: Administrative procedures.

A. Water Supply Survey. 1. The assistant general manager shall review all requests for new services to determine if backflow protection is needed. Plans and specifications must be submitted to the assistant general manager upon request for review of possible cross-connection hazards as a condition of service for new service connections. If it is determined that a backflow prevention assembly is necessary to protect the public water system, the required device must be installed before service will be granted. 2. The assistant general manager may require an on-premises inspection to evaluate cross-connection hazards. Any customer who cannot or will not allow an on-premises inspection of their piping system shall be required to install the backflow prevention assembly the assistant general manager considers necessary. 3. The assistant general manager may require a re-inspection for cross-connection hazards of any premises to which water is serviced by the department. Any customer who cannot or will not allow an on-premises reinspection of their piping system shall be required to install, at the meter, the backflow prevention assembly the assistant general manager considers necessary. B. Customer Notification—Device Installation. 1. The assistant general manager shall notify the water user of the survey findings, listing corrective action to be taken if required. A period of 30 days shall be given to complete all corrective action required including installation of backflow prevention assemblies. The notice shall be in writing and shall also state that service to the water use may be terminated should the water user fail to take the required corrective actions within the allotted time period. 2. If the required corrective action is not taken within the 30-day period as provided in subsection (B)(1) above, the assistant general manager may terminate water service to the affected water user until the subject device is installed and tested with passing results. C. Customer Notification—Testing and Maintenance. 1. The assistant general manager shall notify each affected water user when it is time for the backflow prevention assembly installed on their service connection to be tested and verified, by a certified assembly device tester, to be functioning correctly. Said notice shall be in writing and shall provide the water user 30 days to have the device tested. The notice shall include the necessary form(s) to be completed and resubmitted to the department by the water user. The written notice shall also state that service to the water user may be terminated should the water user fail to take the required corrective actions within the allotted time period. 2. If the required action is not taken within the 30-day period as provided in subsection (C)(1) above, the assistant general manager may terminate water service to the affected water user until the subject device is tested with passing results.

( Prior code § 9-138 ; Ord. 4980 § 9,1992 ; Ord. 5112 § 58,1996 ; Ord. 5678 § 10, 2009 )