§ 10-8.10 — GRADING/CLEARING PERMIT REQUIRED
Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 10-8.10
Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/c41405ba-3412-4dd4-843e-8597cd3d0b1a
SEC. 10-8.10 - GRADING/CLEARING PERMIT REQUIRED.
It shall be unlawful for any person to commence or perform any of the following grading or clearing activities without first obtaining a permit authorizing same on each of the sites or portions of sites to be graded or cleared. (a) Grading Activities. 1. The grading of an area where the average slope of the area to be excavated or filled exceeds 5 to 1. 2. The excavation, fill, or rearrangement of 300 or more cubic yards of earth material on any site. This volume shall be the aggregate of all grading or clearing operations over a 12-month period. 3. The excavation or fill of any portion of a site that increases or decreases its elevation following the completion of grading by a height of five feet or more at any point. 4. The diversion of rainwater runoff from an area 15,000 square feet or larger. 5. The blockage or alteration of a waterway or drainageway that has a capacity of greater than two cubic feet per second. 6. The repair of earth material slides involving 300 or more cubic yards of earth material. 7. The excavation for the installation, removal, or repair of any underground storage tank. (b) Clearing Activities 1. The clearing of an area one acre in size or larger. 2. The clearing of an area greater than 7500 square feet with an average slope exceeding 5 to 1.
Ask a question about Hayward law
Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.
