§ 10-8.20 — APPLICATION FOR PERMIT
Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 10-8.20
Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/537559f5-85e3-47de-b63e-6104675fd25a
SEC. 10-8.20 - APPLICATION FOR PERMIT.
Application for a grading/clearing permit shall be in writing and shall be filed with the City Engineer on forms provided for that purpose. Applications shall be signed by the individual requesting the permit and by the owners of each of the properties involved and shall be accompanied by all of the following information or material that the City Engineer determines is applicable to the grading or clearing activities being proposed. (a) Description of Proposed Activities. A description of the proposed grading or clearing activities, including: 1. Purpose for the grading or clearing; 2. Approximate volumes of earth material to be moved within, onto, or off the site; 3. Routes of travel to be used for hauling earth material and the location where such material is to be disposed of; 4. Starting and completion dates of the proposed work; 5. The type and volume of any plant material to be removed. Identify any existing trees subject to the Tree Preservation Ordinance; 6. Plant materials to be planted on the site. A Landscape Plan to be reviewed and approved by the city Landscape Architect; 7. Days of the week and hours of the day when grading or clearing will be performed. No work shall be performed on Saturdays, Sundays, or holidays, or outside the hours of 7:30 a.m. to 6:00 p.m., without the specific authorization of the City Engineer; 8. Name(s), address(s), and telephone number(s) of contractor(s), subcontractor(s), or other person(s) the applicant intends to have actually do the work proposed and their respective tasks, to the extent such is known at the time the application is submitted; 9. Name(s), address(s), and telephone number(s) of the Civil Engineer and/or the Land Surveyor responsible for the preparation of the Site Map and Grading Plan; 10. Name, address, and telephone number of the Civil Engineer responsible for the preparation of the Interim Erosion and Sediment Control Plan and the Final Erosion and Sediment Control Plan; 11. Name(s), address(s), and telephone number(s) of the soils or geotechnical engineer(s) responsible for the preparation of the soils engineering and engineering geology reports; 12. A vicinity map showing the location of the site in relationship to any watercourses, water bodies, or other significant geographic features and all roads or other significant structures in the surrounding area; 13. An estimate of the cost of the proposed work submitted in a form that is acceptable to the City Engineer. In all cases in which a Site Map and Grading Plan, interim Erosion and Sediment Control Plan, or Final Erosion and Sediment Control Plan, and Post-Construction Structures, Best Management Practices (BMPs), in accordance with the Regional Water Quality Control Board staff recommendations, are required. The cost estimate shall segregate and separately identify the cost of work to be accomplished under each plan; 14. Two sets of address labels showing names, addresses, and Assessor's Parcel Numbers of all owners of property located within 300 feet of the boundary of the property to be graded or cleared, as such names and addresses are shown on the latest equalized assessment roll for Alameda County; 15. Listing of all permits and/or applications approved or pending and reference to any City of Hayward permits or entitlements granted which affect the development of such property. (b) A Site Map and Grading Plan. If the City Engineer determines that a Grading Plan is required, the applicant shall submit four copies of a Grading Plan which shall be prepared by a registered civil engineer and shall contain: 1. Existing and proposed topography of the site taken at a contour interval sufficiently detailed to define the topography over the entire site; 2. Contour intervals that extend a minimum of 100 feet off-site, or that further extent necessary to show on and off-site drainage; 3. Existing and proposed property lines of the site shown in true location with respect to the topographic information included in the plan; 4. Location and graphic representation of all existing on-site utility facilities; 5. Location and graphic representation of all existing natural and man-made drainage facilities, all proposed facilities, the construction methods and materials specifications for all proposed drainage facilities, and a hydrology map prepared by a Registered Civil Engineer with hydraulic calculations; 6. Detailed plans of all surface and subsurface drainage devices, including walls, cribbing, dams, and other protective devices to be constructed with or as a part of the proposed work and materials specifications for all proposed drainage devices; 7. Location and graphic representation of proposed excavations and fills, on-site storage of earth material, and on-site disposal of earth material; 8. Location of existing vegetation by type and identification of all vegetation to be left undisturbed; 9. Location and specifications for all proposed erosion and sediment control measures; 10. Proposed sequence and schedule of excavation, filling and other proposed activities, including earth material storage and disposal; 11. Location of any building or structure on the site and the location of any building or structure on adjacent land that is within 15 feet of the site or which may be affected by the proposed grading operations; 12. Sanitary sewer mains and facilities may be included if the grading and clearing permit is for work authorized by a tentative map approved by the City Council, and the City Engineer has determined that the sanitary sewers installation is reasonable and appropriate. The installation shall be in conformance with Chapter 11, Article 3, of this code and City of Hayward Standard Specifications and Details. (c) An Interim Erosion and Sediment Control Plan (Interim Plan). If the City Engineer determines that an Interim Plan is required, the applicant shall submit four copies of an Interim Plan that contains the following information concerning conditions on the site during clearing, land-disturbing or filling activities, and earth material storage: 1. Maximum surface runoff from the site and contributing adjacent properties calculated using a method approved by the City Engineer; 2. A delineation and brief description of the measures to be undertaken to retain sediment on the site, including but not limited to the designs and specifications for sediment detention basins and traps and a schedule for their maintenance and upkeep; 3. A delineation and brief description of the surface runoff and erosion control measures to be implemented, including but not limited to the types and method of applying mulches, and designs and specifications for diverters, dikes and drains, and a schedule for their maintenance and upkeep; 4. A delineation and brief description of the vegetative measures to be used, including but not limited to the types of seeds and fertilizer and their application rates, the type, location and extent of pre-existing and undisturbed vegetation types, and a schedule for maintenance and upkeep; 5. The location of all the measures listed by the applicant under paragraphs (2), (3), and (4) of this subsection shall be depicted on the Grading Plan or on a separate plan at the direction of the City Engineer; 6. The applicant may propose the use of any erosion and sediment control techniques in the Interim Plan provided such techniques are proved to the satisfaction of the City Engineer to be as or more effective than the equivalent best management practices contained in the Manual of Standards. (d) A Final Erosion and Sediment Control Plan (Final Plan). If the City Engineer determines that a Final Plan is required, the applicant shall submit four copies of a Final Plan that contains the following information concerning conditions on the site after all final structures and improvements that have not been covered by an Interim Plan have been completed: 1. Maximum surface runoff from the site and contributing adjacent properties, calculated using a method approved by the City Engineer; 2. A description of and specifications for sediment retention devices; 3. A description of and specifications for surface runoff and erosion control devices; 4. A description of vegetative erosion control measures; 5. A graphic representation of the location of all items required in paragraphs (2), (3), and (4) of this subsection; 6. The applicant may propose the use of any erosion and sediment control techniques in the Final Plan provided such techniques are proven to the satisfaction of the City Engineer to be as or more effective than the equivalent best management practices contained in the Manual of Standards; 7. The Grading Plan, Interim Plan, and Final Plan may be combined if the required information for each plan can be clearly shown on the combined plan to the satisfaction of the City Engineer; 8. A Storm Water Quality Plan for the operations and maintenance of the project. This plan shall identify all site wash areas and include Structures and BMPs appropriate to the uses conducted on site to effectively prohibit the entry of pollutants into the storm water system. (e) A Work Schedule. A master work schedule showing the following information. 1. Proposed grading schedule; 2. Proposed conditions of the site on each January 15, April 15, July 15, and October 15 during which the permit is in effect; 3. Proposed schedule for installation of all interim erosion and sediment control measures including but not limited to the state of completion of erosion and sediment control devices and vegetative measures on each of the dates set forth in paragraph (2) of this subsection; 4. Schedule for construction of final improvements, if any; 5. Schedule for installation of permanent erosion and sediment control devices where required. (f) Additional Material. The applicant shall submit any additional place, drawings, calculations, or other materials required by the City Engineer, including but not limited to: 1. A preliminary engineering geological report that includes an adequate description of the geology of the site, the conclusions, recommendations, and professional opinions regarding the effect of the proposed work or development on the geological conditions of the site, noting particularly the adequacy of the natural ground to receive fills, cut, and fill slope stabilities, and exposed or subsurface drainage devices or slide repair, and the following further information: (i) A professional opinion of the geological hazards on the site; (ii) A map showing the location of property lines, proposed structures, fault lines as located by the soils engineer, all accurately plotted and referenced using conventional survey methods prepared by a person authorized to practice land surveying; (iii) Research of previous reports showing the relationship of the site and the proposed structures to the known or suspected geologic conditions; (iv) Pertinent geologic features identified by aerial stereo photographic or other acceptable method; (v) A site investigation which includes subsurface profiles, a search for and the locations of fault creep, previous landslides, expansive soils, liquefiable material, and other features critical to grading and foundation design; (vi) Statements that static and dynamic hazardous conditions do not exist or specifications for corrective site preparation and structural design criteria; and (vii) Where the site is within the Alquist-Priolo Special Study Zone, the report shall also be in conformance with the State of California Mining and Geology Board Policies, Criteria and Outline. 2. A preliminary terrain design soils report that includes: (i) Identification of the investigative method used to evaluate soil conditions on the site and description of the investigative procedure; (ii) A description of test data presenting a comprehensive cross-section of the area to be cut or filled and the material to be used as fill; (iii) A plot showing the location of all test borings and excavations; (iv) Laboratory soil analysis of the material proposed for the fill, including its expansive potential, and a statement as to its suitability; (v) A description of groundwater characteristics; (vi) A plot of critically expansive soils, contact zones, and other soil problems with recommended corrective action and design criteria to prevent structural damage; (vii) Bearing value and adequacy of soil to receive fills or structures; (viii) Estimated settlement of areas receiving fills; (ix) A statement concerning the safe load-bearing capacity of controlled fills; (x) A detailed description for clearing, grubbing excavation, surface preparation, filling. and slide repair, including subsurface drainage moisture content in relation to optimum moisture, depth, and compaction of fill layers, frequency of testing, and design of buttress fills; (xi) Maximum slope ratios for slope stability incorporating an engineering geologist's data and recommendations; (xii) A stability analysis of cut slopes steeper than 1-1/2:1, and fill slopes steeper than 2.1, based on an acceptable lateral force of .2g or greater; (xiii) A stability analysis of existing slopes that are potentially unstable; and (xiv) A professional opinion as to the physical suitability of the site for its intended use.
Ask a question about Hayward law
Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.