For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.70.260 — Expansive soils

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 8.70.260

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/a29f109b-62b2-48ff-900a-610fcd05085c

Sec. 8.70.260. - Expansive soils.

Expansive soil is any soil with an expansion index greater than 20, as determined by the Expansion Index Tests (Uniform Building Code Standard 29-2) and as listed in the Uniform Building Code Table 29-C. Whenever expansive soils are encountered within four (4) feet of the finish grade of an area intended or designed as a location for a building, then one (1) of the following shall apply. (1) The permittee shall remove such expansive soil to a minimum depth of four (4) feet below finish grade within the building footprint area. Non-expansive, properly compacted soil shall be installed in the area where the expansive soil was removed. (2) If sufficient non-expansive material is not readily available on site, the permittee may at his or her option import non-expansive material to be used as fill or the soil engineer may waive or reduce the requirement for removal and replacement of the expansive soils for the project. The soil engineer, however, shall make recommendations for the design of footings, foundations, slabs and other load bearing features or other special procedures to alleviate any potential problem created by the remaining expansive soils. (3) Based on recommendations of the soil engineer, expansive soil from cut areas may be placed in the lower extremities of embankments, and non-expansive materials shall be reserved and stockpiled for placement as a cap over the expansive soil. Whenever expansive soil is placed closer than four (4) feet of finish grade, the soil engineer shall so indicate and make corrective recommendations as noted above.

(Ord. No. 2019-17, § 2, 11-21-2019)

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.