§ 6-8.828 — Shutdowns
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 6-8.828
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/82b31bbc-848e-4eae-a021-d29e759bb96a
Sec. 6-8.828. Shutdowns.
(a) Shutdown of the City’s in service potable lines shall be requested through an application. Said application shall be submitted to the City ten (10) working days before the first bacteriological test begins. (b) Shutdowns are generally performed during Monday through Thursday between 9:00 a.m. and 4:00 p.m., unless granted in writing by the Engineer. (c) The Inspector shall sign off the application when all bacteriological testing has passed, and results are accepted by the City. (d) After all bacteriological tests have passed, the contractor or developer shall have ten working days to perform the shutdown. If there is failure to perform the shutdown within the ten working day window, bacteriological testing shall be performed once to insure pipeline sterility has been maintained. (e) Water will be turned on when pipeline has passed all bacteriological testing. There are no exceptions. (f) For non-steel pipelines, sixteen (16)- inches or less, the maximum time allowed is six (6) hours unless granted in writing by the Engineer. (§ 4, Ord. 3297, eff. March 18, 2025)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.
