For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.04.240 — Amendments to Appendix J – Grading and Excavation

Municipal Code, City of Palmdale, California (Code 2026-05-05) · Palmdale Municipal Code § 8.04.240

Corpus is an independent public-information project, not the official City of Palmdale website. Stable reference: corpuslaw.us/code/1b7d5a08-d6fd-445a-b997-c2a6dcd9a11b

§ 8.04.240: Amendments to Appendix J – Grading and Excavation.

Appendix J of the California Building Code 2025 (Volumes 1 and 2) is hereby adopted as the Grading and Excavation provisions of the Palmdale Building Code and amended to read as follows: Section J101 General J101.1 Scope This chapter sets forth regulations for the control of excavation, grading, and earthwork construction, including fills or embankments, and for the control of grading site runoff, including erosion, sediments and construction related pollutants. These regulations establish minimum standards and are not intended to prevent the use of alternate materials, methods or means of conforming to such standards, provided such alternate has been approved. The Building Official or City Engineer shall approve such an alternate provided he or she finds that the alternate, for the purpose intended, is at least the equivalent of that prescribed in this code in quality, strength, effectiveness, durability, and safety. The Building Official or City Engineer shall require that sufficient evidence or proof be submitted to substantiate any claims regarding the alternate. J101.2 Flood Hazard Areas Unless the applicant has submitted an engineering analysis, prepared in accordance with standard engineering practice by a registered design professional, that demonstrates the proposed work will not result in any increase in the level of the base flood, grading, excavation and earthwork construction, including fills and embankments, shall not be permitted in floodways that are in flood hazard areas established in Section 1612.3 or in flood hazard areas where design flood elevations are specified but floodways have not been designated. Section J102 Definitions J102.1 Definitions The following words and terms shall, for the purposes of this appendix, have the meanings shown herein. APPROVAL shall mean the proposed work or completed work conforms to this code in the opinion of the Building Official or City Engineer. AS-GRADED is the extent of surface conditions on completion of grading. BEDROCK is the relatively solid, undisturbed rock in place either at the ground surface or beneath superficial deposits of gravel and/or soil. BENCH. A relatively level step excavated into earth material on which fill is to be placed. BEST MANAGEMENT PRACTICE (BMP) is a storm water pollution mitigation measure that is required to be employed to implement practical means of preventing or reducing pollution to help achieve water quality goals and comply with the requirements of the NPDES permit issued to the City of Palmdale. BORROW is earth material acquired from an off-site location for use in grading. CIVIL ENGINEER shall mean a professional engineer in the branch of civil engineering holding a valid certificate of registration issued by the State of California. COMPACTION. The densification of a fill by mechanical means. CUT. See "Excavation." DESIGN ENGINEER shall mean the civil engineer responsible for the preparation of the plans for the grading work. DESILTING BASINS are physical structures constructed for the removal of sediments from surface water runoff. DOWN DRAIN. A device for collecting water from a swale or ditch located on or above a slope, and safely delivering it to an approved drainage facility. EARTH MATERIAL is any rock, natural soil or fill or any combination thereof. ENGINEERING GEOLOGIST. See "geologist." ENGINEERING GEOLOGY is the application of geologic knowledge and principles in the investigation and evaluation of naturally occurring rock and soil for use in the design of civil works. EROSION. The wearing away of the ground surface as a result of the movement of wind, water or ice. EXCAVATION. The removal of earth material by artificial means, also referred to as a cut. FIELD ENGINEER shall mean the civil engineer responsible for performing the functions as set forth in Section J105.4.2. FILL. Deposition of earth materials by artificial means. FUGITIVE DUST shall mean any solid particulate matter that becomes airborne directly or indirectly as a result of the activities of man. GEOLOGIST shall mean a person holding a valid certificate of registration as a geologist in the specialty of engineering geology issued by the State of California under provisions of the Geologist and Geophysicist Act of the Business and Professions Code. GEOTECHNICAL ENGINEER shall mean a professional engineer registered as a civil engineer by the state of California with experience and knowledgeable in the field of geotechnical and soil mechanics. GRADE. The vertical location of the ground surface. GRADE, EXISTING. The grade prior to grading. GRADE, FINISHED. The grade of the site that conforms to the approved plan at the conclusion of all grading efforts. GRADING. An excavation or fill or combination thereof. KEY. A compacted fill placed in a trench excavated in earth material beneath the toe of a slope. LANDSCAPE ARCHITECT shall mean a person who holds a certificate to practice landscape architecture in the State of California under the landscape architecture provisions of Division 3, Chapter 3.5, of the Business and Professions Code. LINE shall refer to horizontal location of the ground surface. NATURAL GRADE is the vertical location of the ground surface prior to any excavation or fill. ROUGH GRADE is the elevation of the ground surface established by grading that approximates the final elevation shown on the approved design. SITE is any lot or parcel of land or contiguous combination thereof, under the same ownership, where grading is proposed or performed. SLOPE. An inclined surface, the inclination of which is expressed as a ratio of horizontal distance to vertical distance. SOILS ENGINEER. See "Geotechnical Engineer." SURFACE DRAINAGE shall refer to flows over the ground surface. SOIL TESTING AGENCY is an agency regularly engaged in the testing of soils and rock under the direction of a civil engineer experienced in soil testing. STORM DRAIN SYSTEM is a conveyance or system of conveyances, including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches and man-made channels, designed or used for collecting or conveying storm water. STORM WATER MANAGEMENT PLAN is a site drawing with details, notes, and related documents that identify the measures taken by the permittee to (1) control erosion and prevent sediment and construction-related pollutants from being carried off-site by storm water and (2) prevent non storm water discharges from entering the storm drain system. TERRACE. A relatively level step constructed in the face of a graded slope for drainage and maintenance purposes. Section J103 Permits Required J103.1 Grading Permits Required Except as exempted in Section J103.2, grading shall not be performed without first having obtained a permit therefor from the City Engineer. A separate permit shall be obtained for each site. A grading permit does not include the construction of retaining walls or other structures. J103.2 Exemptions A grading permit shall not be required for the following: 1. When approved by Building & Safety, Grading in an isolated, self-contained area, provided that the public is not endangered and that such grading will not adversely affect adjoining properties. 2. Excavation for construction of a structure permitted under this code. 3. Cemetery graves. 4. Refuse disposal sites controlled by other regulations. 5. Excavations for wells, or trenches for utilities. 6. Mining, quarrying, excavating, processing or stockpiling rock, sand, gravel, aggregate or clay controlled by other regulations, provided that such operations do not affect the lateral support of, or significantly increase stresses in, soil on adjoining properties. 7. Exploratory excavations performed under the direction of a registered design professional. 8. Excavation for wells, or trenches for utilities. 9. An excavation or fill for road or slope purposes and shown on plans that are approved by the Department of Public Works as being necessary for the support, construction or maintenance of a public road. Exemption from the permit requirements of this appendix shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. J103.3 Unpermitted Grading A person shall not own, use, occupy or maintain any site containing unpermitted grading. For the purposes of this code, unpermitted grading shall be defined as any grading that was performed, at any point in time, without the required permit(s) having first been obtained from the City Engineer, pursuant to Subsection J103.1, supra. J103.4 Availability of Permit at Site. No person shall perform any grading for which a permit is required under this chapter unless a copy of the grading permit is in the possession of an appropriate licensed contractor and is available at the construction site. J103.5 Application to Existing Grading J103.5.1 Hazardous Conditions Whenever the Building Official or City Engineer determines that any existing excavation, embankment or fill has become a hazard to life and limb, or endangers structures, or adversely affects the safety, use or stability of a public way or drainage channel, the owner of the property upon which the excavation, embankment or fill is located, or other person or agent in control of said property, upon receipt of notice in writing from the Building Official or City Engineer shall, within the period specified therein, repair, reconstruct or remove such excavation, embankment or fill so as to eliminate the hazard. J103.5.2 Maintenance of Protective Devices and Rodent Control The owner of any property on which grading has been performed pursuant to a permit issued under the provisions of this code, or any other person or agent in control of such property, shall maintain in good condition and repair all drainage structures and other protective devices and burrowing rodent control, when they are shown on the grading plans filed with the application for grading permit and approved as a condition precedent to the issuance of such permit. J103.5.3 Correlation with Other Sections The provisions of this section are independent of this code relating to building and property rehabilitation. This section may be invoked even though the same facts have been used to determine that there is a substandard property that is subject to said code. Section J104 Permit Application and Submittals J104.1 Submittal Requirements To obtain a grading permit, the applicant shall first file an application in writing on a form furnished for that purpose. Every such application shall: 1. Describe the land on which the proposed work is to be performed by lot, block, tract, and by a street address or by similar description sufficient to readily identify and definitely locate the site. 2. State the name and address of the owner of said land, the person who is to perform the work, and the field engineer if such work is to be performed as engineered grading. 3. Be accompanied by plans, specifications and calculations as may be required by Section J104.2. 4. State the volume of the material to be handled. 5. Be signed by the applicant or authorized agent, who may be required to submit evidence of such authority. 6. Give such other information as reasonably may be required by the Building Official or City Engineer. J104.2 Plans and Specifications With each application for a grading permit and when required by the City Engineer for enforcement of any provisions of this code, three sets of plans and specifications shall be submitted. Except as waived by the City Engineer, the plans shall be prepared and signed by a civil engineer, stamped by a geotechnical engineer, and shall show the following: 1. A vicinity sketch or other means of adequately indicating the site location. 2. Boundary lines of the property on which the work is to be performed. 3. Each lot or parcel of land into which the site is proposed to be divided. 4. All of the proposed uses of the site and, if the site is to be divided, the proposed use of each lot or parcel of land. 5. Location of any existing buildings or structures on the property where the work is to be performed, and the location of any buildings or structures on adjacent land which are within 15 feet (4572 mm) of the property line. 6. Accurate contours showing the topography of the existing ground. 7. Elevations, location, extent and slope of all proposed grading shown by contours, cross sections or other means and location of any rock disposal area buttress fills or other special features, if such are proposed to be included in the work. 8. A statement of the quantities of material to be excavated and/or filled and the amount of such material to be imported to, or exported from, the site. 9. A statement of the estimated starting and completion dates for work covered by the permit. 10. A statement signed by the owner acknowledging that a field engineer, geotechnical engineer and engineering geologist, when appropriate, will be employed to perform the services required by this code, whenever approval of the plans and issuance of the permit are to be based on the condition that such professional persons be so employed. These acknowledgments shall be on a form furnished by the Building Official. 11. The recommendations in the soil engineering and engineering geology reports shall be incorporated in the grading plans. 12. Detailed plans of all drainage-devices, walls, cribbing or other protective devices to be constructed in connection with, or as a part of, the proposed work, together with a map showing the drainage area and estimated runoff of the area served by any drains. Suitable access shall be provided to permit proper cleaning and maintenance. 13. Storm water provisions are required to be shown on the plan in accordance with the requirement of Section 106.4.3 of the code. See Section J104.10 for specific requirements. 14. Any additional plans, drawings or calculations deemed necessary by the Building Official or City Engineer to show conformance of the proposed work with the requirements of this code or related ordinances. 15. A drainage plan for that portion of a lot or parcel to be utilized as a building site (building pad), including elevations of floors with respect to finish site grade and locations of proposed stoops, slabs and fences that may affect drainage. The dates of the soils engineering and/or engineering geology (geotechnical) reports together with the names, addresses and telephone numbers of the firms or individuals who are in responsible charge of preparing the reports. 16. Whenever a landscape permit is required as part of a grading project, the grading, irrigation and landscape plans shall be coordinated between the design engineer and landscape architect. The landscape plans shall be based on the most recent grading plan. Should there be any final elevation differences between the two plans, the elevations shown on the grading plans shall govern. Fees. Grading permit and plan checking fees shall be as specified in the City of Palmdale Fee Ordinance. J104.3 Geotechnical Report A geotechnical report prepared by a registered design professional shall be provided. The report shall contain not less than the following: 1. The nature and distribution of existing soils. 2. Conclusions and recommendations for grading procedures. 3. Soil design criteria for any structures or embankments required to accomplish the proposed grading. 4. Where necessary, slope stability studies, and recommendations and conclusions regarding site geology. 5. The soils report shall comply with City's Engineering Design Standards and City manual, titled "Guidelines For Preparation of Geotechnical Reports". Exception: A geotechnical report is not required where the Building Official or City Engineer determines that the nature of the work applied for is such that a report is not necessary. J104.3.1 Engineering Geological Reports The City Engineer or Building Official may require an engineering geological investigation and report, based on the most recent grading plan. The engineering geological report shall include an adequate description of the geology of the site and conclusions and recommendations regarding the effect of geologic conditions on the proposed development. J104.4 Liquefaction Study For sites with mapped maximum considered earthquake spectral response accelerations at short periods (Ss) greater than 0.5g as determined by Section 1613, a study of the liquefaction potential of the site shall be provided and the recommendations incorporated in the plans. Exception: A liquefaction study is not required where the Building Official determines from established local data that the liquefaction potential is low. J104.5 Permit Limitations and Conditions J104.5.1 General Conditions. The issuance of a grading permit shall constitute an authorization to do only that work which is described or illustrated on the application for the permit or on the grading plans and specifications approved by the City Engineer. J104.5.2 Jurisdictions of Other Agencies. Permits issued under the provisions of this code shall not relieve the owner of the responsibility for securing permits or licenses that may be required from other departments or divisions of the governing agencies. J104.5.3 Conditions of Approval In granting any permit under this code, the City Engineer or Building Official may attach such conditions as may be reasonably necessary to prevent creation of a nuisance or hazard to public or private property. Such conditions may include, but shall not be limited to: 1. Improvement of any existing grading to bring it up to the standards of this code. 2. Requirements for fencing of excavations or fills that would otherwise be hazardous. 3. Fugitive dust control measures. See Section J104.10.9 for specific requirements. Modification of Approved Plans. Any modifications of or changes in the approved grading plans must be approved by the City Engineer. Modifications which affect basic tract design or land use must have the approval of the appropriate control agency. Special Permit. Agricultural or Road Grading. Where the grading proposed is solely for the purpose of preparing land for agricultural purposes or for the construction of a roadway to be used as access for maintaining the use of the land at the time of the permit, the City Engineer or Building Official may issue a special permit therefor and modify the requirements of this chapter when he or she finds: 1. The site of the proposed work has an area of not less than 10 acres (4.05 ha). 2. The work will be reasonably safe for the intended use and will not result in a hazard to adjoining property or existing structures. 3. Adequate provision will be made for drainage and erosion control. J104.6 Denial of Permit J104.6.1 Hazards The City Engineer or Building Official shall not issue a grading permit in any case where he or she finds that the work, as proposed by the applicant, is likely to adversely affect the stability of adjoining property, result in the deposition of debris on any public way, interfere with any existing drainage course or be in an area determined to be subject to geological hazard. If it can be shown to the satisfaction of the City Engineer or Building Official that the hazard can be essentially eliminated by the construction of retaining structures, buttress fills, drainage devices or by other means, the City Engineer or Building Official may issue the permit with the condition that such work be performed. J104.6.2 Land Use The City Engineer or Building Official shall not issue a grading permit for work on a site unless the proposed uses shown on the grading plan for the site will comply with the City of Palmdale Zoning Ordinance. J104.7 Security J104.7.1 Security Required A permit shall not be issued for grading unless the owner shall first post with the City Engineer security in one of the following forms: 1. A bond furnished by a corporate surety authorized to do business in this state. 2. A cash bond. Security required by this section may include incidental off-site grading on property contiguous with the site to be developed, provided written consent of the owner of such contiguous property is filed with the City Engineer. The City Engineer may waive the requirements for a security for: 1. Grading being done by or for a governmental agency. 2. Grading necessary to remove a geological hazard, where such work is covered by an agreement and security. 3. Filling of holes or depressions, provided such grading will not affect the drainage from or to adjacent properties. J104.7.2 Amount of Security The amount of security shall be based on the number of cubic yards of material in either excavation or fill, whichever is greater, plus the cost of all drainage or other protective devices or work necessary to eliminate geological hazards. That portion of the security valuation based on the volume of material in either excavation or fill shall be computed as 110 percent of the estimated cost, regardless of the cubic yardage. When the rough grading has been completed in conformance with the requirements of this code, the City Engineer may at his or her discretion consent to a proportionate reduction of the security to an amount estimated to be adequate to ensure completion of the grading work, site development or planting remaining to be performed. The costs referred to in this section shall be as estimated by the City Engineer. J104.7.3 Conditions All security shall include the conditions that the principal shall: 1. Comply with all of the provisions of the code, applicable laws, and ordinances. 2. Comply with all of the terms and conditions of the grading permit. 3. Complete all of the work authorized by the permit. J104.7.4 Term of Security The term of each security shall begin upon the filing thereof with the City Engineer and the security shall remain in effect until the work authorized by the grading permit is completed and approved by the City Engineer. Default Procedures. In the event the owner or the owner's agent fails to complete the work or fails to comply with all terms and conditions of the grading permit, it shall be deemed that a default has occurred. The City Engineer shall give notice thereof to the principal and security or financial institution on the grading permit security, or to the owner in the case of a cash deposit or assignment and may order the work required to complete the grading in conformance with the requirements of this code. The surety or financial institution executing the security shall continue to be firmly bound under an obligation up to the full amount of the security for the payment of all necessary costs and expenses that may be incurred by the City Engineer in causing any and all such required work to be done. In the case of a cash deposit or assignment, the unused portion of such deposit or funds assigned shall be returned or reassigned to the person making said deposit or assignment. Right of Entry. The City Engineer or Building Official or the authorized representative of the Surety Company or financial institution shall have access to the premises described in the permit for the purpose of inspecting the work. In the event of default in the performance of any term or condition of the permit, the surety or financial institution or the Building Official, or any person employed or engaged in the behalf of any of these parties, shall have the right to go upon the premises to perform the required work. The owner or any other person who interferes with or obstructs the ingress to or egress from any such premises of any authorized representative of the surety or financial institution or of the City of Palmdale engaged in the correction or completion of the work for which a grading permit has been issued, after a default has occurred in the performance of the terms or conditions thereof, is guilty of a misdemeanor. J104.8 Safety Precautions If at any stage of the work the City Engineer or Building Official determines by inspection that further grading as authorized is likely to endanger any public or private property, result in the deposition of debris on any public way or interfere with any existing drainage course, the City Engineer or Building Official may order the work stopped by notice in writing served on any persons engaged in doing or causing such work to be done, and any such person shall forthwith stop such work. The City Engineer or Building Official may authorize the work to proceed if the City Engineer or Building Official finds adequate safety precautions can be taken or corrective measures incorporated in the work to avoid likelihood of such danger, deposition or interference. If the grading work as done has created or resulted in a hazardous condition, the City Engineer or Building Official shall give written notice requiring correction thereof as specified in Section J103.5 of this code. If the City Engineer or Building Official finds any existing conditions not as stated in the grading permit or not as shown on the grading plan, the City Engineer or Building Official may order the work stopped until a revised grading plan which includes provisions for such existing conditions has been submitted and approved. J104.9 Storm Water Management Plan (Erosion Control) No grading permit shall be issued for work to be commenced between October 1 of any year and April 15 of the following calendar year, unless the plans for such work include a storm water management plan with details of protective measures, including desilting basins or other temporary drainage or control measures, or both, as may be necessary to protect adjoining public and private property from damage by erosion, flooding or the deposition of mud, debris or construction-related pollutants which may originate from the site or result from such grading operation. If grading has been started prior to November 1, all protective measures shall be installed prior to November 1. If grading is started on or after November 1, all protective measures shall be installed before grading begins. As grading progresses, all protective measures shall be maintained in good working order to the satisfaction of the City Engineer until April 15 of the following year, unless final grading approval has been granted by the City Engineer prior to that date and all permanent drainage and erosion-control systems, if required, are in place. J104.9.1 Storm Damage Precautions, Incomplete Work Where a grading permit is issued and the work is commenced after April 15 and before October 1 of any year and the plans for such work do not include details of the protective measures described in Section J104.9, and it appears that the grading and installation of the permanent drainage devices as authorized by the permit will not be completed prior to November 1, then on or before October 1 the owner of the site on which the grading is being performed shall file or cause to be filed with the City Engineer revised plans which include details of the protective measures described in and in all other respects follow the provisions of Section J104.9. The revised plans required by this section shall be accompanied by an application for plan check services and plan check fees in accordance with City Fee Schedule. J104.9.2 Storm Water Management Plan (Erosion Control), effect of noncompliance Should the owner fail to submit the plans or fail to provide the protective measures required by Section J104.9 or J104.9.1 by the dates specified therein, it shall be deemed that a default has occurred under the conditions of the grading permit security. Thereupon, the City Engineer may enter the property for the purpose of installing, by city forces or by other means, the drainage, erosion control and other devices shown on the approved plans, or if there are no approved plans, as the City Engineer may deem necessary to protect adjoining property from storm damage, or the City Engineer may cause the owner of the site to be prosecuted as a violator of this code or City Engineer may take both actions. The City Engineer shall have the authority to collect the penalties imposed by Section J104.9.2 upon determining that the site is not in compliance with the requirements of this section. Payment of penalty shall not relieve any persons from fully complying with the requirements of this code in the execution of the work. In addition to the above actions, the following penalties shall be imposed: 1. If a designed erosion-control plan is not submitted as prescribed in Section J104.9.1: Grading Permit Volume | Penalty 1 – 10,000 cubic yards (1 – 7,645.5 m3) | $50.00 per day 10,000 – 100,000 cubic yards (7,646.3 – 76,455 m3) | $250.00 per day 2. If protective devices for erosion control are not installed as prescribed in Section J104.9 and approved by the City Engineer: Grading Permit Volume | Penalty 1 – 10,000 cubic yards (1 – 7,645.5 m3) | $100.00 per day 10,000 – 100,000 cubic yards (7,646.3 – 76,455 m3) | $500.00 per day More than 100,000 cubic yards (76,455 m3) | $1,000.00 per day J104.9.2.1 Costs and Penalties. If not paid within 30 days from the date of the notice, the penalties imposed by Section J104.9.2 shall become a special assessment against the property. J104.9.2.1 Notice of Violation J104.9.2.1.a General The City Engineer may record a notice of violation with the county recorder's office when a property is in violation of Section J104.9 of this code. Recordation of such notice shall be subject to the provisions of Sections J104.9.2.1.b and J104.9.2.1.c. The remedy provided by this section is cumulative to any other enforcement action permitted by this code. J104.9.2.1.b Recordation If (1) the City Engineer determines that any property is in violation of Section J104.9 of this code; and if (2) the City Engineer gives written notice as specified below of said violation; and if (3) within 30 days of said notice, the property is not brought into compliance with this code, the City Engineer may, at his or her sole discretion, at any time thereafter, record with the county recorder's office a notice that the property is in violation of this code. Contents of Notice. The written notice given pursuant to this section shall indicate: 1. The nature of the violation(s); and 2. Notice that if the violation is not remedied to the satisfaction of the City Engineer within 30 days, the City Engineer may, at any time thereafter, record with the county recorder's office a notice that the property is in violation of this code. The notice shall be posted on the property and shall be mailed to the owner of the property as indicated on the last equalized county assessment roll. The mailed notice may be sent by registered, certified or first-class mail. J104.9.2.1.c Rescission Any person who desires to have recorded a notice rescinding the notice of violation may present evidence of compliance and payment of penalty fees and costs to the City Engineer. The costs incurred by the City Engineer in the investigation of such violations and the processing of the notice and notification of concerned parties and inspection costs shall be as specified in currently adopted Palmdale Fee Ordinance. If the City Engineer determines that such fees have been paid and such costs have been recovered by the City, or that such fees and costs have been placed on the tax rolls as a special assessment pursuant to Section 25845 of the Government Code, the City Engineer shall record a notice rescinding the prior notice of violation. J104.10 Responsibility of Permittee J104.10.1 Compliance with Plans and Code The permittee or the permittee's agent shall carry out the proposed work in accordance with the approved plans and specifications and in compliance with all the requirements of this code. J104.10.2 Coordinator The permittee shall act as the coordinator between the consultants, contractor and City Engineer or Building Official. The permittee shall present to the City Engineer or Building Official the names of all consultants prior to obtaining a grading permit. In the event of changed conditions, the permittee shall be responsible for informing the City Engineer or Building Official of such change and shall provide revised plans and reports for approval. All slope planting shall also be subject to the requirements of City of Palmdale Landscape Ordinance No. 1475 and the City's Landscaping Design Standards. If a landscape permit is not required, the slope planting shall be a part of the grading permit. If the slope planting is within an area in which a landscape permit is required under City of Palmdale Landscape Ordinance No. 1475, all slope planting shall also meet the requirements of this chapter and shall be a part of the landscape permit. J104.10.3 Inspections It shall be the responsibility of the permittee to notify the City Engineer when the work is ready for the inspections required by Section J105. The notification shall be at least one working day in advance of the inspection. J104.10.4 Protection of Utilities The permittee shall be responsible for the prevention of damage to any public utilities or services. J104.10.5 Protection of Adjacent Property The permittee is responsible for the prevention of damage to adjacent property, and no person shall excavate on land sufficiently close to the property line to endanger any adjoining public street, sidewalk, alley, or other public or private property without supporting and protecting such property from settling, cracking or other damage which might result. Special precautions shall be made to prevent imported or exported materials from being deposited on the adjacent public way and/or drainage courses. J104.10.6 Storm Water Control Measures The permittee shall put into effect and maintain all mitigation measures required under the National Pollution Discharge Elimination System (NPDES) permit issued to the City of Palmdale. Such measures are precautionary measures necessary to protect adjacent watercourses and public or private property from damage by erosion flooding and deposition of mud debris, and construction-related pollutants. J104.10.7 Termination of Consultants The permittee shall notify the City Engineer or Building Official within 48 hours if any consultant resigns or is terminated. J104.10.8 Best Management Practices The permittee shall maintain the site in such a manner as to minimize the impacts of storm water and construction related pollutants due to the grading and related construction activities on adjacent public and private property and drainage courses. The required best management practices shall include, but not be limited to, those identified in this section. 1. All equipment used for grading and related activities shall be stored, serviced, and refueled in a designated area specifically designed to prevent waste oils, fuels, solvents and other pollutants from contaminating the soil or being conveyed by storm water. 2. All fuels, solvents, oil, and other foreign substances and their containers shall be stored in accordance with their listing and protected from the weather in such a manner as to prevent them from contaminating the soil or being conveyed by storm water. 3. A covered receptacle shall be available on-site for collection of trash and debris to be disposed of off-site. The site shall be maintained in such a manner as to prevent the deposition of trash and debris onto adjacent public and private property. 4. All vehicles or equipment shall be free of mud and debris before leaving the site so as not to track or deposit such material onto the public way. The roadway entrance must be stabilized in such a manner as to prevent the off-site tracking of soil or mud. Provisions shall be made for immediate cleaning of the public way when accidental depositions occur. J104.10.9 Fugitive Dust Control Measures The permittee shall put into effect and maintain control measures so as to not cause or allow emissions of fugitive dust from any active grading operation, open stockpile area, or disturbed area such that the presence of dust remains visible in the atmosphere beyond the property line of the emission source. Control measures may include, but are not limited to, the suspension of grading operations, the application of water, the application of chemical stabilizers, the installation of temporary coverings, the installation of silt fencing, or the establishment of vegetative ground cover. J104.11 Import and Export of Earth Materials In addition to other provisions of this code, the following requirements shall apply when earth materials in excess of 50 cubic yards are to be exported from or imported to a grading site by transporting such materials over a publicly maintained street. 1. The point or points of access to the public street or streets for export or import shall be shown on the haul route plan and shall be located as approved by the City Engineer. 2. Special safety precautions equivalent to the following standards shall be provided where the egress (outhaul) road connects with the public street. a. The last 50 feet (15240 mm) of the outhaul road immediately adjoining the street if downgrade to the street shall have a grade no steeper than 3 percent. b. An unobstructed sight distance of not less than 300 feet (91440 mm) in each direction up and down the public street shall be provided at the point of egress. Such sight distance shall be measured from a point 8 feet (2438 mm) above grade in the outhaul road; that point shall be 10 feet (3048 mm) outside the edge of the street pavement or, if no pavement, 10 feet (3048 mm) outside the edge of the normally traveled portion of the public street. 3. Traffic-control devices shall be provided and maintained at the connection of the ingress and egress roads with the public way as may be required by the city of Palmdale City Engineer. 4. Haul Route Permit and plan shall be required showing the approved route and deposition site. The plan shall indicate all required permits and approvals for the deposition site. J104.11.1 Planning and Zoning Compliance. No grading permit shall be issued for the import or export of more than 50 cubic yards of earth material to or from a grading site unless the project is in conformance with "Planning and Zoning," of the City of Palmdale. Section J105 Grading Designation and Inspections J105.1 General Grading involving a fill intended to support structures of more than one lot or parcel of land, or in excess of 5,000 cubic yards (3822.8 m3) of material or grading where the City Engineer determines special conditions or unusual hazards exist shall conform with Section J105.4, entitled "Engineered Grading Requirements." Grading other than "engineered grading" shall be designated "regular grading." J105.2 Regular Grading Requirements. The grading shall be inspected by the City Engineer as set forth in Section J105.3, "Inspection of Excavation and Fills." The City Engineer may require inspection and testing by a soil testing agency. If required, the soil testing agency's responsibility shall include, but need not be limited to, approval concerning the inspection of cleared areas and benches to receive fill, and the compaction of fills. J105.3 Inspection of Excavation and Fills The City Engineer, upon notification from the permittee or the permittee's agent, shall inspect the grading at the following stages of the work and shall either approve the portion then completed or shall notify the permittee or the permittee's agent wherein it fails to comply with the requirements of this code. J105.3.1 Initial Inspection When the site has been cleared of vegetation and unapproved fill and it has been scarified, benched or otherwise prepared for fill. No fill shall have been placed prior to this inspection. J105.3.2 Rough Inspection When approximate final elevations have been established; drainage terraces, swales and other drainage devices graded and ready for paving; berms installed at the top of the slopes; and the statements required by Section J105.9 have been received. J105.3.3 Final Inspection When grading has been completed; all drainage devices installed; slope planting established, irrigation systems installed; and the as graded plans and required statements and reports have been submitted. In addition to the called inspections specified above, the City Engineer may make such other inspections as may be deemed necessary to determine that the work is being performed in conformance with the requirements of this code. Investigations and reports by an approved soil testing agency, soils engineer and/or engineering geologist may be required. J105.3.4 Non-Inspected Grading No person shall own, use, occupy or maintain any non-inspected grading. For the purposes of this code, non-inspected grading shall be defined as any grading for which a grading permit was first obtained, pursuant to Section J103.1, but which has progressed beyond any point requiring inspection and approval by city engineer without such inspection and approval having been obtained. J105.4 Engineered Grading Requirements For engineered grading, it shall be the responsibility of the persons listed below to perform the designated functions and provide reports as set forth in Section J105.9. These responsibilities and functions are in addition to those of the City Engineer as set forth in Section J105.3. J105.4.1 Design Engineer The design engineer shall prepare the grading plans and shall incorporate recommendations from the soil engineering geology reports on such plans. J105.4.2 Field Engineer The responsibilities of the field engineer shall include the establishment and approval of line, grade and surface drainage. The design engineer and field engineer need not be the same person. At the completion of the rough grading and final grading, the field engineer shall submit the statements and reports required by Section J105.9. J105.4.3 Soils Engineer The soils engineer shall provide professional inspection within such engineer's area of technical specialty, which shall include observation during grading and testing for required compaction. The soils engineer shall provide sufficient observation during the preparation of the natural ground and placement and compaction of the fill to verify that such work is being performed in accordance with the conditions of the approved plan and the appropriate requirements of this code. Revised recommendations relating to conditions noted during grading and differing from the approved soils engineering and engineering geology reports shall be coordinated with the engineering geologist and submitted to the permittee, the building official or City Engineer, the engineering geologist and the field engineer. J105.4.4 Engineering Geologist The engineering geologist shall provide professional inspection within such geologist's area of technical specialty, which shall include professional inspection of the bedrock excavation or excavation for subdrains, buttress fills and shear keys to determine if conditions encountered are in conformance with the approved report. Revised recommendations relating to conditions differing from the approved engineering geology reports shall be submitted to the soils engineer. J105.4.5 Grading Contractor The grading contractor shall submit the statement required by Section J105.9 at the completion of rough grading. Planting and irrigation. When planting and irrigation are required by Section J110, the statement required by Section J105.9 shall be submitted prior to the final approval of the grading by the City Engineer. Reports that reflect conditions which are not in agreement with the approved grading plans shall be submitted to the field engineer and the City Engineer or Building Official by the appropriate consultants. J105.5 Notification of Nonconformance If, in the course of fulfilling their responsibilities under this code, the field engineer, soils engineer or engineering geologist finds that the work is not being done in conformance with this code or the plans approved by the City Engineer, or in accordance with good accepted practices, the permittee and the City Engineer or Building Official shall be immediately notified in writing of the nonconformity and of the corrective measures to be taken. J105.6 Termination of Services The termination of the service of the field engineer, soils engineer or geologist prior to the completion of the work shown on the approved grading plans shall be reported to the City Engineer in writing within 48 hours. The report shall be by the person terminated and shall include the status of the work at the last inspection. The work shall be stopped until the replacement has agreed to accept the responsibility within the area of his or her technical competence for verification upon completion of the work. J105.7 Violation It is a violation of this code for any person to verify to the satisfactory completion of work as required by this chapter if such work is subsequently found by the City Engineer or Building Official to have been in substantial noncompliance with the approved design or code requirement at the time of verification. J105.8 Notification of Completion The permittee shall notify the City Engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage facilities and their protective devices, and all erosion-control measures have been completed in accordance with the final approved grading plan, and the required reports and certifications have been submitted. J105.9 Reports and Statements – Final Reports Upon completion of the rough grading work and at the final completion of the work, the following reports, drawings and supplements thereto are required for engineered grading or when professional inspection is performed for regular grading, as applicable. An as-graded grading plan prepared by the field engineer retained to provide such services in accordance with Section J105.4 shall show original ground surface elevations, as-graded ground surface elevations, lot drainage patterns, limits of over excavated areas, and the locations and elevations of surface drainage facilities and of the outlets of subsurface drains. As-constructed locations, elevations and details of subsurface drains shall be shown as reported by the soils engineer. Field engineers shall state that the work within their area of responsibility was done in accordance with the final approved grading plan. Reports prepared by the soils engineer retained to provide such services in accordance with Section J105.4, which include locations and elevations of field density tests, summaries of field and laboratory tests, other substantiating data, and comments on any changes made during tests and their effect on the recommendations made in the approved soils engineering investigation report. Soils engineers shall submit a statement that, to the best of their knowledge, the work within their area of responsibility is in accordance with the approved soils engineering report and applicable provisions of this code. Reports prepared by the engineering geologist retained to provide such services in accordance with Section J105.4, which include a final description of the geology of the site and any new information disclosed during the grading and the effect of this information on recommendations incorporated in the approved grading plan. Engineering geologists shall submit a statement that, to the best of their knowledge, the work within their area of responsibility is in accordance with the approved engineering geology report and applicable provisions of this code. Where necessary, such report shall include a final geologic map and cross sections and recommendations noting geologic hazards and sewage disposal areas when the site inspection was required under Section J105.1. The grading contractor shall submit in a form prescribed by the City Engineer a statement of conformance to the as-graded plan and the specifications. J105.10 Special Inspections The special inspection requirements of Section 1705.6 shall apply to work performed under a grading permit where required by the Building Official. Section J106 Excavations J106.1 Maximum Slope The slope of cut surfaces shall be not steeper than is safe for the intended use, and shall be not more than one unit vertical in two units horizontal (50-percent slope) unless the owner furnishes a geotechnical engineering or an engineering geology report, or both, stating that the site has been investigated and giving an opinion that a cut at a steeper slope will be stable and not create a hazard to public or private property. Substantiating calculations and supporting data may be required where the City Engineer or Building Official determines that such information is necessary to verify the stability and safety of the proposed slope. The City Engineer or Building Official may require the excavation to be made with a cut face flatter in slope than one and one-half horizontal to one vertical if the City Engineer or Building Official finds it necessary for stability and safety. Exceptions: 1. A cut surface shall be permitted to be at a slope of 1.5 units horizontal to 1 unit vertical (67-percent slope) provided that all of the following are met: 2. It is not intended to support structures or surcharges. 3. It is adequately protected against erosion. 4. It is not more than 8 feet (2438 mm) in height. 5. It is approved by the Building Code Official. 6. Ground water is not encountered. 7. A cut surface in bedrock shall be permitted to be at a slope of 1 unit horizontal to 1 unit vertical (100-percent slope) if approved by City Engineer or Building Official. J106.2 Slope Surface Protection. All slopes must be stabilized against surface erosion. Stabilization may be accomplished through the application of erosion-control blankets, soil stabilizers or other means as approved by the City Engineer or Building Official. J106.3 Drainage. Drainage terraces and interceptor drain shall be provided as required by Section J109. Section J107 Fills J107.1 General Unless otherwise recommended in the geotechnical report, fills shall comply with the provisions of this section. J107.2 Surface Preparation The ground surface shall be prepared to receive fill by removing vegetation, topsoil, and other unsuitable materials, and scarifying the ground to provide a bond with the fill material. J107.3 Benching Where existing grade is at a slope steeper than one unit vertical in five units horizontal (20-percent slope) and the depth of the fill exceeds 5 feet (1524 mm) benching shall be provided in accordance with Figure J107.3. A key shall be provided that is not less than 10 feet (3048 mm) in width and 2 feet (610 mm) in depth. [image] For SI: 1 foot = 304.8 mm. FIGURE J107.3Benching Details J107.4 Fill Material Fill material shall not include organic, frozen, or other deleterious materials. Rock or similar irreducible material greater than 12 inches (305 mm) in any dimension shall not be included in fills. J107.5 Compaction All fill material shall be compacted to 90 percent of maximum density as determined by ASTM D1557, Modified Proctor, in lifts not exceeding 12 inches (305 mm) in depth. J107.6 Maximum Slope The slope of fill surfaces shall be not steeper than is safe for the intended use. Fill slopes steeper than one unit vertical in two units horizontal (50-percent slope) shall be justified by a geotechnical report or engineering data. J107.7 Drainage Drainage terraces and interceptor drain shall be provided as required by Section J109. J107.8 Inspection of Fill For engineered grading, the soils engineer shall provide sufficient inspections during the preparation of the natural ground and the placement and compaction of the fill to be satisfied that the work is being performed in accordance with the conditions of plan approval and the appropriate requirements of this chapter. In addition to the above, the soils engineer shall be present during the entire fill placement and compaction of fills that will exceed a vertical height or depth of 30 feet (8849 mm) or result in a slope surface steeper than two units horizontal to one unit vertical (50-percent slope). J107.9 Testing of Fill Sufficient tests of the fill soil shall be made to determine the density thereof and to verify compliance of the soil properties with the design requirements, including soil types and shear strengths in accordance with the standards established by the City Engineer or Building Official. The results of such testing shall be included in the reports required by this chapter. Section J108 Setbacks J108.1 General Cut and fill slopes shall be set back from the property lines in accordance with this section. Setback dimensions shall be measured perpendicular to the property line and shall be described in Section J108.2, unless substantiating data is submitted justifying reduced setbacks. The grading design must be such that the property line between adjacent lots will be at the apex of the berm at the top of the slope. J108.2 Slope Setbacks J108.2.1 Top of Slope The setback at the top of a slope to property line shall not be less than one fifth the height of the slope with a minimum of 2 feet (610 mm) and a maximum of 10 feet (3048 mm), or than is required to accommodate any required interceptor drains, whichever is greater. J108.2.2 Toe of Slope The setback at the toe of a slope to property line shall not be less than one fifth the height of the slope with a minimum of 2 feet (610 mm) and a maximum of 20 feet (6096 mm). J108.3 Slope Protection Where required to protect adjacent properties at the toe of a slope from adverse effects of the grading, additional protection, approved by the Building Official, shall be included. Examples of such protection include but are not be limited to: 1. Setbacks greater than those required by Figure J108.1. 2. Provisions for retaining walls or similar construction. 3. Erosion protection of the fill slopes. 4. Provision for the control of surface waters. Section J109 Drainage and Terracing J109.1 General Unless otherwise recommended by a registered design professional, drainage facilities and terracing shall be provided in accordance with the requirements of this section. Exception: Drainage facilities and terracing need not be provided where the ground slope is not steeper than one unit vertical in three units horizontal (33-percent slope). J109.1.1 Site Grading and Drainage The site or lot grading shall meet the requirements as specified in CBC Section 1804.4 – "Site Grading." J109.1.2 Disposal. Drainage facilities shall be designed to carry surface waters to the nearest practical street, storm drain, or natural watercourse approved by the City Engineer or other appropriate governmental agency as a safe place to deposit such waters. Desilting basins, filter barriers or other methods, as approved by the City Engineer, shall be utilized to remove sediments from surface waters before such waters are allowed to enter streets, storm drains or natural watercourses. If the drainage device discharges onto natural ground, riprap or a similar energy dissipater may be required. J109.2 Terraces Terraces not less than 6 feet (1829 mm) in width shall be established at not more than 30-foot (9144 mm) vertical intervals on all cut or fill slopes to control surface drainage and debris. Suitable access shall be provided to allow for cleaning and maintenance. Where more than two terraces are required, one terrace, located at approximately mid-height, shall be not less than 12 feet (3658 mm) in width. When the total slope height exceeds 100 feet (30480 mm), one terrace near mid height shall not be less than 20 feet (6096 mm) in width (measured horizontally from the outside edge). In lieu of the above, for cut and fill slopes greater than 120 feet (36576 mm) in height, the applicant may submit a drainage and terrace design by a civil engineer for approval by the city engineer. Swales or ditches shall be provided on terraces. They shall have a minimum gradient of one unit vertical in 20 units horizontal (5-percent slope) and shall be paved with concrete not less than 3 inches (76 mm) in thickness, or with other materials suitable to the application. They shall have a depth not less than 12 inches (305 mm) and a width not less than 5 feet (1524 mm). A single run of swale or ditch shall not collect runoff from a tributary area exceeding 13,500 square feet (1256 m) (projected) without discharging into a down drain. J109.3 Interceptor Drains Interceptor drains shall be installed along the top of cut slopes receiving drainage from a tributary width greater than 40 feet (12 192 mm), measured horizontally. They shall have a minimum depth of 1 foot (305 mm) and a minimum width of 3 feet (915 mm). The slope shall be approved by the building official but shall be not less than one unit vertical in 50 units horizontal (2-percent slope). The drain shall be paved with concrete not less than 3 inches (76 mm) in thickness, or by other materials suitable to the application. Discharge from the drain shall be accomplished in a manner to prevent erosion and shall be approved by the Building Official or City Engineer. J109.4 Drainage Across Property Lines Drainage across property lines shall not exceed that which existed prior to grading. Excess or concentrated drainage shall be contained on site or directed to an approved drainage facility. Erosion of the ground in the area of discharge shall be prevented by installation of nonerosive down drains or other devices. J109.5 Subsurface Drainage. Cut and fill slopes shall be provided with subsurface drainage as necessary for stability. Section J110 Erosion Control J110.1 General The faces of cut and fill slopes shall be prepared and maintained to control erosion. This control shall be permitted to consist of effective planting or other devices satisfactory to the City Engineer. All slope planting shall also be subject to the requirements of City of Palmdale Landscape Ordinance No. 1475 and the City's Landscaping Design Standards. If a landscape permit is not required, the slope planting shall be a part of the grading permit. If the slope planting is within an area in which a landscape permit is required under City of Palmdale Landscape Ordinance No. 1475, all slope planting shall also meet the requirements in this chapter and shall be a part of the landscape permit. Exception: Erosion control measures may not be required on cut slopes not subject to erosion due to the erosion-resistant character of the materials. J110.2 Planting The surface of all cut slopes more than 5 feet (1524 mm) in height and fill slopes more than 3 feet (914 mm) in height shall be protected against damage by erosion by planting with ground cover plants. Slopes exceeding 15 feet (4572 mm) in vertical height shall also be planted with shrubs, spaced not to exceed 10 feet (3048 mm) on centers; trees, spaced not to exceed 20 feet (6096 mm) on centers; or a combination of shrubs and trees at equivalent spacing, in addition to the ground cover plants. The plants selected and planting methods used shall be suitable for the soil and climatic conditions of the site and shall be in accordance with standard specifications on file in the office of the City Engineer. Planting need not be provided for cut slopes rocky in character and not subject to damage by erosion and any slopes protected against erosion damage by other methods when such methods have been specifically recommended by a soils engineer, engineering geologist, or equivalent authority and found to offer erosion protection equal to that provided by the planting specified in this section. Plant material shall be selected which will produce a coverage of permanent planting effectively controlling erosion. Consideration shall be given to deep-rooted plant material needing limited watering, to low maintenance during the lifetime of the project, to high root-to-shoot ratio (weight of above-ground parts versus root system), to wind susceptibility and to fire-retardant characteristics. J110.3 Irrigation Slopes required to be planted by Section J110.2 shall be provided with an approved system of irrigation that is designed to cover all portions of the slope. Irrigation system plans shall be submitted and approved prior to installation. A functional test of the system shall be required. The requirements for permanent irrigation systems may be modified upon specific recommendation of a landscape architect or equivalent authority that, because of the type of plants selected, the planting methods used and the soil and climatic conditions at the site, irrigation will not be necessary for the maintenance of the slope planting. J110.4 Plans and Specifications Planting and irrigation plans shall be submitted for slopes required to be planted and irrigated by Sections J110.2 and J110.3. Except as waived by the City Engineer for minor grading, the plans for slopes 20 feet (6096 mm) or more in vertical height shall be prepared and signed by a civil engineer or landscape architect. J110.5 Release of Security The planting and irrigation systems required by this section shall be installed as soon as practical after rough grading. Prior to final approval of grading and before the release of the grading security, the planting shall be well established and growing on the slopes. J110.6 Other Devices Where necessary, check dams, cribbing, riprap or other devices or methods shall be employed to control erosion and provide safety. Section J111 Referenced Standards J111.1 General See Table J111.1 for standards that are referenced in various sections of this appendix. Standards are listed by the standard identification with the effective date, standard title, and the section or sections of this appendix that reference the standard. TABLE J111.1REFERENCED STANDARDS STANDARD ACRONYM | STANDARD NAME | SECTIONS HEREIN REFERENCED ASTM D1557—12E1 | Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort [56,000 ft-lb/ft3 (2,700kN-m/m3)]. | J107.5

( Ord. 1595 § 1 (Exh. A), 2022 ; Ord. 1661 , 10/21/2025 )

Ask a question about Palmdale law

Corpus searches the Palmdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.