For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.46.030 — Description of electric service

Municipal Code, City of Rancho Cucamonga, California (Code 2026-09-02) · Rancho Cucamonga Municipal Code § 3.46.030

Corpus is an independent public-information project, not the official City of Rancho Cucamonga website. Stable reference: corpuslaw.us/code/ff53681d-bc5f-45eb-9cf9-959e78941bc4

§ 3.46.030: Description of electric service.

A. General. 1. The character of service available at any particular location should be ascertained by inquiry at the utility's office. 2. The rate schedules included in this chapter are applicable to both electric service and utility services provided beyond the utility's point of delivery. 3. The rate schedules included in this chapter are applicable for service where the customer purchases its entire electrical requirements from the utility, except where such schedules specifically provide otherwise, and are not applicable where a part of the customer's electrical requirements are supplied from some other source. 4. The rate schedules included herein are only applicable for service provided from underground distribution facilities, except where schedules specifically provide otherwise. 5. Alternating current service of approximately 60-cycle frequency will be supplied. 6. Voltages referred to in the tariff schedules are nominal voltages. 7. Each service shall have a service main disconnecting device with an ampere rating equal to or less than the ampere rating of the underground pull section and the service conductors. The total ampere rating of the service main disconnecting devices, including taps to underground pull section, shall be equal or less than the ampere rating of the service conductors. B. Phase and voltage specifications. 1. Customer service voltages. a. Under all normal load conditions, distribution circuits will be operated so as to maintain secondary service voltage levels to customers within the voltage range specified below: Nominal Two-Wire and Multi-Wire Service Voltage | Minimum Voltage to All Services | Maximum Service Voltage on Residential and Commercial Distribution Circuits | Maximum Service Voltage on Agricultural and Industrial Distribution Circuits 120 | 114 | 120 | 126 208 | 197 | 208 | 218 240 | 228 | 240 | 252 277 | 263 | 277 | 291 480 | 456 | 480 | 504 b. Exceptions to voltage limits. Voltage may be outside the limits specified when the variations: (1) Arise from the temporary action of the elements; (2) Are infrequent momentary fluctuations of a short duration; (3) Arise from service interruptions; (4) Arise from temporary separation of parts of the system from the main system; (5) Are from causes beyond the control of the utility. 2. Customer utilization voltages. a. All customer-owned utilization equipment must be designed and rated in accordance with the following utilization voltages specified by the American National Standard C84.1 if customer equipment is to give fully satisfactory performance. Nominal Utilization Voltage | Minimum Utilization Voltage | Maximum Utilization Voltage 120 | 110 | 125 208 | 191 | 216 240 | 220 | 250 277 | 254 | 289 480 | 440 | 500 b. The difference between service and utilization voltage is allowances for voltage drop in customer wiring. The maximum allowance is four volts (120-volt base) for secondary service. c. Minimum utilization voltages from American National Standard C84.1 shown for customer information by the utility has no control over voltage drop in customer's wiring. d. The minimum utilization voltages shown subsection (B)(2)(a) of this section, apply for circuits supplying lighting loads. The minimum secondary utilization voltages specified by American National Standard C84.1 for circuits not supplying lighting loads by 90 percent of nominal voltages (180 volts on 120-volt base) for normal service. e. Motors used on 208-volt systems should be rated 200 volts or (for small single-phase motors) 115 volts. Motors rated 230 volts will not perform satisfactorily on these systems and should not be used. Motors rated 220 volts are no longer standard, but many of them were installed on existing 208-volt systems on the assumption that the utilization voltage would not be less than 187 volts (90 percent of 208 volts). 3. Single-phase service. a. General. Voltage | Minimum Load Required | Maximum Load Allowed 120 volts | None | 1-15 amp and 1-20 amp branch circuit 120/240 or 240 volts | None | 400 amp main switch 240/480 volts | 15kVA | 200 amp main switch 2,400 volts or over | Varies with location | 40 amp main switch b. The maximum size 120-volt single-phase motor allowed is one hp, and the maximum size 140-volt, or higher voltage, single-phase motor allowed is ten hp. c. Single-phase service may be supplied to installations having a proposed main service switch in excess of the switch capacities specified in this section, provided the approval of the utility has been first obtained as to the number and size of switches, circuits and related facilities. 120/240 volt installations will be supplied by one of the following methods as determined by the utility: (1) From two or three separate 120/240 volt service connections at one location. Energy so supplied will be totalized for billing purposes. The connected load on any service connection shall not be greater than twice that on any other service connection; (2) From one 120/240 volt connection where the proposed main service switch does not exceed 600 amperes capacity. d. Where RCMU maintains four-wire wye-connected 120/208 volt secondary mains, single-phase service is supplied at 120/208 volts, three-wire, for which the maximum allowed is a 200 ampere main switch. Loads in excess of a 200 ampere main switch will be supplied at 120/208 volts, four-wire. 4. Three-phase service. a. General. Voltage | Minimum Connected Load Required | Maximum Demand Allowed | Maximum Main Switch Capacity Allowed 240 volts | 3 kVA | 1,000 kVA | 4,000 amperes 277/480 volts | 25 kVA | 3,000 kVA | 4,000 amperes 2,400 volts or 4,160 volts | Varies w/location | 12,000 kVA | 3,000 amperes 12,000 volts or 16,500 volts | Varies w/location | 30,000 kVA | Not specified b. Where three-phase service is supplied from a four-wire wye-connected 120/208 volt service, the maximum demand allowed is 1,000 kVA. c. Service to all loads of 1,000 kVA maximum demand, or over, must be approved by the utility as to adequacy of facilities for service. d. Loads on three-phase service must be balanced between phases in accordance with good engineering practice. e. Three-phase service may be supplied to installations having a proposed main service switch in excess of the switch capacities specified in this section, provided approval of the utility has first been obtained as to the number and size of switches, circuits and related facilities. Such service will be supplied from two or three separate service connections at one location. Energy supplied in this manner will be totalized for billing purposes. The loads will be balanced as closely as practicable between the services. 5. Combined single-phase service and three-phase service. a. Service may be supplied at 120/208 four-wire wye-connected where the utility does not maintain four-wire secondary poly-phase mains, provided: (1) Written application is made for such service by the customer; (2) The customer's load is of such a size as to require an individual transformer installation of not less than 15 kVA of transformer capacity; and (3) A customer provides space acceptable to the utility on this premises to accommodate the installation of the utility's facilities when, in the opinion of the utility, such space is considered necessary. b. In underground areas where the utility maintains 120/208 volt or 240-volt three-phase mains, service may be supplied at 277/480 volts, four-wire, provided: (1) Written application is made for such service by the customer; and (2) The customer provides space acceptable to the utility on his or her premises to accommodate the installation of the utility's facilities when, in the opinion of the utility, such space is considered necessary. c. The maximum demand allowances for combined single-phase and three-phase are as set forth in subsection (B)(3) of this section. 6. At the option of the utility, the above voltage and phase specifications may be modified because of the service conditions at the location involved. C. Motor protection and equipment. Customer's motor equipment must conform to the following requirements: 1. Motors that cannot be safely subjected to full-rated voltage on starting or that drive machinery of such a nature that the machinery, itself, or the product it handles will not permit the motor to resume normal speed upon restoration of normal supply voltage shall be equipped with devices that will disconnect them from the line upon failure of supply voltage and that will prevent the automatic reconnection of the motors upon restoration of normal supply voltage. 2. All motors of one hp or larger shall be equipped with thermal relays, fuses or other automatic overcurrent interrupting devices to disconnect completely such motors from the line as a protection against damage due to overheating. 3. Three-phase motors driving elevators, hoists, tramways, cranes, conveyers or other equipment, which would create hazard to life in the event of uncontrolled reversal of motor rotation, shall be provided with reverse-phase and open-phase protection to disconnect completely the motors from the line in the event of phase reversal or loss of one phase. 4. Wind machines thermostatically controlled with automatic reclosing switches must be equipped with suitable time-delay devices, as hereinafter specified, at the customer's expense, to permit the required adjustment of the time of re-closure after interruption of service. A suitable time-delay device, within the meaning of this section, is a relay or other type of equipment that can be preset to delay with various time intervals the re-closing of the automatic switches (and the consequent starting up of the electric motors on the wind machines) and to stagger the reconnection of the load on the utility's system, and such device must be constructed so as effectively to permit a variable overall time interval of not less than five minutes with adjustable time increments of not greater than ten seconds. The particular setting to be utilized for each separate installation is to be determined by the utility from time to time in accordance with its operating requirements, and the customer is to obtain from the utility the setting for each installation as thus determined. D. Allowable motor starting currents. 1. The starting current drawn from the utility's lines shall be considered the nameplate locked rotor current or that guaranteed by the manufacturer. At its option the utility may determine the starting current by test, using a stop ammeter with not more than 15 percent overswing or an oscillograph, disregarding the value shown for the first ten cycles subsequent to energizing the motor. 2. If the starting current for a single motor exceeds the value stated in the following tables, reduced voltage starting or other suitable means must be employed at the customer's expense, to limit the current to the value specified, except where specified exemptions are provided in subsection (D)(2), 3, and 4 of this section. TABLE 1Alternating Current — Single-Phase MotorsAllowable Locked Rotor CurrentsStandard Nominal Voltages of the Utility: Rated Size | 120 Volts | 240 Volts 1 hp and less | 50 amperes | 36 amperes 1½ hp | | 48 amperes 2 hp | | 60 amperes 3 hp | | 80 amperes 5 hp | | 120 amperes 7½ hp | | 170 amperes 10 hp | | 220 amperes TABLE 2Alternating Current — Three-Phase MotorsAllowable Locked Rotor Currents Rated Size | 240 Volts | 480 Volts | 2,400 Volts 3 hp 64 amperes | 32 amperes 5 hp 92 amperes | 46 amperes 7½ hp 127 amperes | 63 amperes 10 hp | 162 amperes | 81 amperes 15 hp | 232 amperes | 116 amperes 20 hp | 290 amperes | 145 amperes 25 hp | 365 amperes | 183 amperes 30 hp | 435 amperes | 218 amperes 40 hp | 580 amperes | 290 amperes 50 hp | 725 amperes | 363 amperes | 70 amperes 60 hp | | 435 amperes | 87 amperes 75 hp | | 535 amperes | 107 amperes 100 hp | | 725 amperes | 142 amperes a. Over 100 hp — The utility should be consulted for allowable locked rotor currents. b. Where service conditions permit, subject to the utility's approval, reduced-voltage starters may be omitted in the original installation until such time as the utility may order the installation of a reduced-voltage starter to be made, and, similarly, the utility may at any time require starting current values lower than set forth herein where conditions at any point on its system require such reduction to avoid interference with service. c. Reduced-voltage starters may be omitted on any motor of a group installation provided that its starting current does not exceed the allowable starting current of the largest motor of the group. d. A reduced-voltage starter may be omitted on any motor in a group installation provided that its starting current does not exceed three times the maximum demand in amperes of the entire installation. E. Interference with service. 1. Customers who operate equipment which causes detrimental voltage fluctuations (such as, but limited to, hoists, welders, radio transmitters, X-ray apparatus, elevator motors, compressors and furnaces) must reasonably limit such fluctuations upon request by the utility. The customer will be required to pay for whatever corrective measures are necessary. 2. Prior to the installation of any new arc furnace or design modification of an existing furnace, the customer shall provide basic design information for the installation to aid the utility in determining a method of service and the allowable level of load fluctuations. 3. Any customer who superimposes a current of any frequency upon any part of his or her electrical system, other than the current supplied by the utility shall, at his or her expense, prevent the transmission of such current beyond his electrical system. F. Power factor. The utility may require the customer to provide, at his or her own expense, equipment to increase the operating power factor of each complete unit of neon, fluorescent or other gaseous tube lighting equipment to not less than 90 percent, lagging or leading. G. Wave form. The utility may require that the wave form of current drawn by equipment of any kind be in conformity with good engineering practice. H. Added facilities. 1. Where an applicant requests and the utility agrees to install facilities which are in addition to, or in substitution for the standard facilities the utility would normally install, the costs thereof shall be borne by the applicant. Such costs shall include continuing ownership costs as may be applicable. Unless otherwise provided by the utility's filed tariff schedules, these added facilities (special facilities) will be installed, owned and maintained or allocated by the utility solely as an accommodation to the applicant. Added facilities are defined as: a. Facilities requested by an applicant which are in addition to or in substitution for standard facilities which the utility would normally provide for delivery of service at one point, through one meter at one voltage class under its tariff schedules; or b. A pro rata portion of the facilities requested by an applicant, allocated for the sole use of such applicant, which would not normally be allocated for such sole use. Added facilities may include, but are not limited to, all types of equipment normally installed by the utility in the development of its electrical distribution systems and facilities or equipment related to the utility's provision of service to a customer or a customer's receipt or utilization of the utility's electrical energy. Added facilities also include the differential costs for equipment for electrical distribution systems designed by the utility which, in the utility's sole opinion, is in excess of equipment required by the utility's standard serving system. Added facilities may include poles, lines, structures, fixtures, transformers, service connections, load control devices and meters. However, the installation of meters capable of recording and providing interval data that are in addition to or in substitution for standard meters shall be provided under the provisions of subsection J of this section. 2. Added facilities will be installed under the terms and conditions of a contract in the form on file with the utility. Such contract will include, but is not limited to, the following terms and conditions: a. Where new facilities are to be installed for applicant's use as added facilities, the applicant shall advance to the utility the additional installed costs of the added facilities over the cost of standard facilities. b. The following monthly ownership charges include a replacement component into perpetuity and are applicable to added facilities contracts: (1) Applicants being served by the utility-financed added facilities shall pay a monthly charge of 1.46 percent of the cost associated with the added facilities; (2) Applicants being served by the customer-financed added facilities shall pay a monthly charge of 0.47 percent of the cost associated with the added facilities; (3) Where existing facilities are allocated for applicant's use as added facilities, the applicant shall pay a monthly charge for the added facilities of 1.46 percent of the utility's reconstruction cost new less depreciation value of that portion of the existing facilities which are allocated to the customer as added facilities. c. Where the utility agrees to provide replacement options, the applicant shall pay the following monthly ownership charges: RCMU-Financed Without replacement perpetuity | With replacement 20-year term Monthly Rate | 1.33% | 1.34% Customer Financed Without replacement perpetuity | With replacement 20-year term Monthly Rate | 0.33% | 0.35% Under these options, where existing facilities are allocated for applicant's use as added facilities, the applicant shall pay a monthly ownership charge equal to the applicable RCMU-financed monthly rate. The RCMU-financed monthly rate will be applied to RCMU's reconstruction cost new less the depreciation value of that portion of the existing facilities which are allocated to the customer as added facilities. d. Where the utility determines the collection of continuing monthly ownership charges is not practicable, the applicant will be required to make an equivalent one-time payment in lieu of the monthly ownership charge. The applicable payment options, if any, will be selected solely by the utility. e. All monthly ownership charges shall be reviewed and re-filed with the city council when changes occur in the utility's costs for providing such service. However, the utility will not refile if the utility's cost change is less than ten basis points. 3. The utility shall not be liable for any loss, damage, or injury arising from the utility's installation, operation, maintenance, or control of the added facilities, unless such loss, damage or injury results from the utility's sole negligence, and, in no event, shall the utility be liable for loss of profits, revenues or other consequential damages. No adjustment shall be made to reduce the billings if damage to, or malfunction of, the added facilities result from any cause other than the negligence or willful acts of the utility. I. Welder service. 1. Rating of welders. Electric welders will be rated for billing purposes as follows: a. Generator arc welders. The horsepower rating of the motor driving a motor generator type arc welder will be taken as the horsepower rating of the welder. b. Transformer arc welders. Nameplate maximum kVA input (at rated output amperes) will be taken as the rating of transformer type arc welders. c. Resistance welders. Resistance welder ratings will be determined by multiplying the welder transformer nameplate rating (at 50 percent duty cycle) by the appropriate factor listed below: Factor Type of Welder | Transformer Nameplate +Rating @ 50% Duty Cycle | Utility-Owned Distribution Transformer | Customer-Owned Distribution Transformer Rocker Arm, Press or Projection Spot | 20 kVA or less | 0.60 | 0.50 Rocker Arm or Press Spot | Over 20 kVA, incl. Projection Spot | 21 to 75 kVA, incl. | 0.80 | 0.60 Flash or Butt | 100 kVA or over Seam or Portable Gun | All sizes Flash or Butt | 67 to 100 kVA, incl. | * Project Spot | Over 75kVA Flash or Butt | 66 kVA or less | 1.20 | 0.90 * | Each flash or butt welder in this group will be rated at 80 kVA where the distribution transformer is owned by the utility or 60 kVA where the distribution transformer is owned by the customer. d. Ratings prescribed by subsection (I)(1)(a), (b) and (c) of this section normally will be determined from nameplate data or from data supplied by the manufacturer. If such data are not available or are believed by either the utility or customer to be unreliable, the rating will be determined by test. e. If established by seals approved by the utility, the welder rating may be limited by the sealing of taps which provide capacity greater than the selected tap and/or by the interlocking lockout of one or more welders with other welders. f. When conversion of units is required for tariff application, one welder kVA will be taken as one horsepower for tariffs stated on a horsepower basis and one welder kVA will be taken as one kilowatt for tariffs stated on a kilowatt basis. 2. Billing of welders. Welders will be billed at the regular rates and conditions of the tariffs on which they are served subject to the following provisions: a. Connected load type of schedule. Welder load will be included as part of the connected load with ratings as determined under subsection (I)(1) of this section based on maximum load that can be connected at any one time and no allowance will be made for diversity between welders. b. Demand metered type of schedule. Where resistance welders are served on these schedules, the computation of diversified resistance welder load shall be made as follows: Multiply the individual resistance welder ratings, as prescribed in subsections I.1.c through I.1.f of this section, by the following factors and add the results thus obtained: 1.0 times the rating of the largest welder 0.8 times the rating of the next largest welder 0.6 times the rating of the next largest welder 0.4 times the rating of the next largest welder 0.2 times the rating of all additional welders If this computed diversified resistance welder load is greater than the metered demand, the diversified resistance welder load will be used in lieu of the metered demand for rate computation purposes. J. Interval metering and other metering facilities as added facilities. 1. This subsection is applicable to the installation of interval metering and/or metering facilities that are not part of other transmission and distribution facilities installed as added facilities under subsection H of this section. 2. Interval metering and/or metering facilities may include, but are not limited to, the components as defined in section 3.46.020 under "interval metering" or "metering facilities." 3. Where a customer elects, and the utility agrees, the utility will install, own, and maintain interval metering and/or metering facilities which are in addition to, or in substitution for, standard equipment for the customer's use. The costs of such equipment shall be borne by the customer. 4. The costs of interval metering shall be at the customer's cost. 5. Interval metering and/or metering facilities charges. a. Interval metering and/or metering facilities will be installed, owned, and maintained under the terms of and conditions of a contract. Where a customer requests, the utility may agree to finance the interval metering and/or metering facilities. b. Other charges. For utility-owned interval metering and/or metering facilities, the customer shall pay the maintenance and testing charges in accordance with the rates and charges listed in the schedule of electric fees and charges adopted by resolution by the city council. This charge shall include repair and/or replacement of the interval metering and/or metering facilities, as necessary to provide for continued operation. The customer shall remain liable for repair or replacement due to damage from misuse, or hazards such as fire, theft or vandalism. The customer shall pay the maintenance and testing charges for the interval metering and/or metering facilities during the useful life of such equipment, under the terms and conditions set out in the IMMFA. c. The utility will update the installation, purchasing, maintenance and testing costs, and the monthly capital-related charges when changes occur in the utility's costs for providing such services and will file these updates with the city council. K. Change of connected load. If a customer plans to make any significant change either in the amount or character of the electrical load connected to their service, the customer shall give the utility written notice in sufficient time for the utility to modify its service facilities, if necessary, before the customer makes the changes. The cost of modifying the utility's facilities will be charged to the customer in accordance with section 3.46.170.

( Code 1980, § 3.46.030 ; Ord. No. 736 § 2, 2004 ; Ord. No. 870 (Recodification), 2014 )

Ask a question about Rancho Cucamonga law

Corpus searches the Rancho Cucamonga sections it holds and shows the ones that match, with their citations. Free, no sign-in.