§ 3.46.160: Line extensions.

This rule is applicable to extension of electric distribution lines of the utility's standard voltages (less than 15 kV) necessary to furnish permanent electric service to applicants and will be made in accordance with the following provisions: A. General. 1. Distribution line extension basis. a. Design. The utility will be responsible for planning, designing, and engineering distribution line extensions using the utility's standards for material, design, and construction. Applicant may elect to design that portion of the new distribution line extension normally designed by the utility in accordance with the applicant design provisions of this rule. b. Ownership. The distribution line extension facilities installed under the provisions of this rule, shall be owned, operated, and maintained by the utility, except for substructures and enclosures that are on, under, within or part of a building or structure. c. Private lines. The utility shall not be required to serve any applicant from distribution line ex-tension facilities that are not owned, operated, and maintained by the utility. 2. Distribution line extension locations. a. Utility maintenance of line extension facilities. The utility will own, operate and maintain distribution line extension facilities only: (1) Along public streets, alleys, roads, highways and other publicly dedicated ways and places which the utility has the legal right to occupy; and (2) On public lands and private property across which rights-of-way and permits satisfactory to the utility may be obtained without cost to or condemnation by the utility. b. Normal route of line. The length and normal route of a distribution line extension will be determined by the utility and considered as the distance along the shortest, most practical, available, and acceptable route which is clear of obstructions from the utility's nearest permanent and available distribution facility to the point from which the service facilities will be connected. 3. Underground distribution line extensions. a. Underground required. The utility, by authority of the city council, has declared itself an underground utility. Consistent with this declaration, underground distribution line extensions shall be installed where required to comply with applicable laws and ordinances of the city and where the utility maintains or desires to maintain underground distribution facilities. For example, underground distribution line extensions are required for all new: (1) Commercial developments; (2) Industrial developments; and (3) Locations that are in proximity to and visible from designated scenic areas. The requirements to underground lines set forth in this subsection shall not apply where it is impractical to build underground lines, as determined by the utility, and approved by the utilities administrative resources manager. b. Underground optional. When requested by applicant and agreed upon by the utility, underground distribution line extensions may be installed in areas where it is not required, as provided in subsection (A)(3)(a) of this section. 4. Overhead distribution line extensions. Overhead distribution line extensions may be installed only where underground extensions are not required as provided in subsection (A)(3)(a) of this section. 5. Special or added facilities. Any special or added facilities the utility agrees to install at the request of the applicant will be installed at the applicant's expense in accordance with section 3.46.030. 6. Temporary service. Facilities installed for temporary service or for operations of speculative character or questionable permanency shall be made in accordance with the fundamental installation and ownership provisions of this section and the provisions of section 3.46.140. 7. Services. Service facilities connected to the distribution lines to serve an applicant's premises will be installed, owned and maintained as provided in section 3.46.150. 8. Street lights. Street lights and appurtenant facilities shall be installed in accordance with the service provisions of the applicable street light schedule. 9. Contracts. Each applicant requesting a distribution line extension may be required to execute a written contract, prior to the utility performing its work on the distribution line extension. B. Installation responsibilities. 1. Underground distribution line extensions. a. Responsibility of applicant. In accordance with the utility's design, specifications, and requirements, applicant is responsible for: (1) Design. Designing and engineering of the applicant's electric distribution facilities to serve the development in accordance with city's design standards; (2) Excavation. All necessary trenching, backfilling, compacting and furnishing of imported or suitable natural backfill material as required and proper disposal of trench spoil as required and other digging as required; (3) Substructure and conduit. Furnishing, installing, and upon acceptance by the utility, conveying to the utility ownership of all necessary installed substructures, conduits and pull and service boxes, transformer pads, including feeder conduits and related substructures required to extend to and within subdivisions and developments; and (4) Protective structures. Furnishing, installing and, upon acceptance by the utility, conveying to the utility ownership of all necessary protective structures. b. Utility responsibility. The utility's responsibility is to provide inspection service to verify the applicant's performance and to furnish and install cables, switches, transformers, and other distribution facilities required to complete the distribution line extension. 2. Overhead distribution line extensions. The utility is responsible for furnishing and installing all facilities required for the distribution pole line extension. 3. Installation options. a. Utility-performed work. Where requested by applicant and mutually agreed upon, the utility may perform that portion of the new distribution line extension work normally installed by applicant according to subsection (B)(1)(a) of this section, provided applicant pays the utility its total estimated installed cost. b. Applicant-performed work. The applicant may elect to install that portion of the new distribution line extension normally installed by the utility in accordance with the utility's design and specifications, using qualified contractors (see subsection D of this section, applicant installation options). C. Contributions or payments by applicant. 1. General. Contributions or payments by an applicant to the utility for the installation of a distribution line extension to receive utility service consist of such things as cash payments, the value of facilities deeded to the utility, and the value of excavation performed by applicant. 2. Project-specific cost estimates. The utility's total estimated installed cost will be based on a project-specific estimated cost. 3. Payment. The applicant shall contribute or pay, before the start of the utility's construction, the following: a. Estimated value of excavation, etc. The utility's estimated value of excavation, conduits, and protective structures required by the utility for the distribution line extension under subsection (B)(1)(a) of this section. b. Underground service. (1) Cabling. The estimated installed cost of any necessary cabling, including distribution transformers, installed by the utility to complete the underground distribution line ex-tension. This includes the cost of conversion of existing single-phase lines to three-phase lines, if required; plus (2) Substructures. The utility's estimated value of substructures installed by the applicant and deeded to the utility as required; and c. Overhead service. (1) Pole line. All necessary facilities required for an overhead distribution pole line exten-sion and, if required, the conversion of existing single-phase lines to three-phase lines; and d. Added facilities. (1) After final design of the distribution facilities, the utility will notify the applicant of the estimated cost of any extra facilities or special requirements to be done at the applicant's request. Extraordinary facilities or service provisions will be handled under section 3.46.030, description of electric service. 4. (Reserved) 5. Joint applicants. The total contribution or advance from a group of applicants will be apportioned among the members of the group in such manner as they may mutually agree. 6. Payment adjustments. a. Total refundable amount. If the loads provided by the applicant result in the utility having installed facilities which are in excess of those needed to serve the actual loads, and the utility elects to reduce such excess facilities, the applicant shall pay the utility its estimated total costs to remove, abandon, or replace the excess facilities, less the estimated salvage of any removed facilities. b. Reimbursement. If, within five years of the date on which the city begins delivering electricity to the applicant, the distribution line extension is used by the city to serve new customer loads, the city will charge to the new customer and refund to the applicant a portion of the distribution line extension costs previously paid by the applicant pursuant to a reimbursement agreement between the applicant and the city. This refund amount shall be determined by the city, in its sole discretion, and shall reflect the new customer's proportional cost responsibility for the distribution line extension, taking into consideration each customer's existing and/or forecast load, rate class, and location. In the event that any additional customer subsequently initiates service that is provided using the distribution line extension within the same five-year period, the city will similarly determine the additional customer's proportional cost responsibility for the distribution line extension and provide a refund to the customers that have previously contributed to cover the cost of the distribution line exten-sion. D. Applicant design option for new installations; competitive bidding. When the applicant selects competitive bidding, the distribution line extension may be designed by the applicant's qualified contractor or sub-contractor in accordance with the utility's design and construction standards. All applicant design work of electric facilities must be performed by or under the direction of a licensed professional engineer and all design work submitted to the utility must be certified by an appropriately licensed professional engineer, consistent with the applicable federal, state and local, including the city, codes and ordinances. The applicant design option is available to the applicant for new service and is not available for replacement, reinforcement, or relocation of existing systems, where there is no applicant for new line or service extension work. Under this option, the following applies: 1. Applicant shall notify the utility, in a manner acceptable to the utility. 2. Applicant designs shall conform to all applicable federal, state and local, including the city, codes and ordinances for utility installations design (such as, but not limited to the Business and Professions Code). 3. The utility may require applicant designers to meet the utility's prequalification requirements prior to participating in applicant design. 4. Applicant designers shall obtain utility design and construction standards and specifications prior to performing applicant design. The utility may charge for any of these services. 5. The utility will plan check the applicant design project at applicant's expense. 6. The utility shall perform all the utility's project accounting and cost estimating. E. Applicant installation options. 1. Competitive bidding. Under competitive bidding, the distribution line extension may be installed by applicant's qualified contractor or sub-contractor in accordance with the utility's design and specifications. Under this option, the following applies: a. Upon acceptance by the utility, ownership of all such facilities will transfer to the utility. b. Applicant shall pay to the utility any utility costs associated with the distribution line exten-sion, including the estimated costs of design, administration, and installation of any additional facilities and labor necessary to complete the distribution line extension. c. The applicant shall pay to the utility, as a nonrefundable amount, the cost of inspection. d. Only duly authorized employees of the utility are allowed to connect to, disconnect from, or perform any work upon the utility's facilities. 2. Minimum contractor qualifications. Applicant's contractor or subcontractor (QC/S) shall: a. Be licensed in the state for the appropriate type of work (electrical and general, etc.). b. Employ workmen properly qualified for specific skills required (qualified electrical worker, qualified person, etc.) as defined in California High Voltage Safety Orders (Title 8, Chapter 4, Subchapter 5, Group 2). c. Comply with applicable laws (Equal Opportunity Regulations, OSHA, EPA, etc.). 3. Other contractor qualifications. An applicant for service who intends to employ a QC/S also should consider whether the QC/S: a. Is technically competent. b. Has access to proper equipment. c. Demonstrates financial responsibility commensurate with the scope of the contract. d. Has adequate insurance coverage (worker's compensation, liability, property damage, etc.). e. Is able to furnish a surety bond for performance of the contract, if required. F. Special conditions. 1. Facility relocation or rearrangement. Any relocation or rearrangement of the utility's existing facilities, at the request of, or to meet the convenience of an applicant or customer, and agreed upon by the utility, normally shall be performed by the utility. Where new facilities can be constructed in a separate location, before abandonment or removal of any existing facilities, and applicant requests to perform the new construction work, it can be performed under the applicable provisions of subsection E of this section, applicant installation options. In all instances, the utility shall abandon or remove its existing facilities at the option of the utility. The applicant or customer shall be responsible for the costs of all related relocation, rearrangement and removal work. 2. Exceptional cases. When the application of this rule appears impractical or unjust to either party or the ratepayers, the utility or applicant may refer the matter to the utilities administrative resources manager of the utility for a special ruling or for special conditions, which may be mutually agreed upon. G. Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: "Applicant" means a person or agency requesting the utility to deliver/supply electric service. "Betterment" means facilities installed by applicant at the request of the utility in addition to those required under subsection (B)(1)(a) of this section. "Cabling" means conductors, including cable-in-conduit, if used, connectors, switches, as required by the utility for primary, secondary, and service installations. "Commercial development" means two or more enterprises engaged in trade or the furnishing of services, (e.g., shopping centers, sales enterprises, business offices, professional offices, and educational or governmental complexes) located on a single parcel or on two or more contiguous parcels of land. "Conduit" means ducts, pipes or tubes of certain metals, plastics and other materials acceptable to the utility, including pull wires and concrete encasement where required, for the installation and protection of electric wires or cables. "Contribution" means in-kind services and the value of all property conveyed to the utility at any time during the utility's work on an extension which is part of the utility's total estimated installed cost of its facilities, or cash payments not covered by applicant's allowances. "Distribution line extension" means a new distribution facility of the utility that is a continuation of, or branches from, the nearest available existing permanent distribution line, including any facility rearrangements and relocations necessary to accommodate the distribution line extension, to the point of connection of the last service. The utility's distribution line extension includes converting an existing single-phase line to three-phase in order to furnish three-phase service to an applicant, but excludes service transformers, meters and services. "Distribution lines" mean overhead and underground facilities which are operated at distribution voltages, and which are designed to supply two or more services. "Distribution trench footage" means the total trench footage used for calculating cabling costs. It is determined by adding the total length of all new and existing trenching for the installation of underground primary and secondary distribution lines designed to supply two or more services, excluding service trench footage under section 3.46.170. "Excavation" means all necessary trenching, backfilling, and other digging to install distribution line extension facilities, including furnishing of any imported backfill material and disposal of spoil as required, surface repair and replacement, landscape repair and replacement. "Feeder conduit" means a conduit for such uses as part of a backbone system to provide for future-anticipated load growth outside the subdivision involved, to provide for future-anticipated load growth in the existing subdivision and the existing subdivisions in close proximity, to balance loads between substations, to interconnect the service to the subdivision with service to subsequent developments outside the subdivision, and to provide the flexibility and versatility of modifying or supplying emergency backup power to the area involved. "In proximity to" means within 1,000 feet from each edge of the right-of-way of designated scenic high-ways and from the boundaries of designated parks and scenic areas. "Industrial development" means two or more enterprises engaged in a process which creates a product or changes material into another form or product and located on a single parcel or on two or more contiguous parcels of land. "Insignificant loads" means small operating loads such as gate openers, valve controls, clocks, timing devices, fire protection equipment, alarm devices, etc. "Intermittent loads" means loads which, in the opinion of the utility, are subject to discontinuance for a time or at intervals. "Payment" means cash payment made to the utility prior to the initiation of any work done by the utility which is not covered by allowances. "Permanent service" means service which, in the opinion of the utility, is of a permanent and established character. This may be continuous, intermittent, or seasonal in nature. "Pole line" means poles, cross-arms, insulators, conductors, switches, guy-wires, and other related equipment used in the construction of an electric overhead line. "Protective structures" means fences, retaining walls (in lieu of grading), sound barriers, posts, or barricades and other structures as required by the utility to protect distribution equipment. "Scenic areas" means an area such as a scenic highway, a state or national park or other area determined by a governmental agency to be of unusual scenic interest to the general public. Scenic high-ways are officially designated under the California Scenic Highway Program established pursuant to Public Utilities Code § 320. State or national parks or other areas of unusual scenic interest to the general public are determined by the appropriate governmental agency. "Seasonal service" means electric service to establishments which are occupied seasonally or intermit-tently, such as seasonal resorts, cottages, or other part-time establishments. "Substructures" means the surface and subsurface structures which are necessary to contain or support the utility's electric facilities. This includes, but is not limited to, such things as splice boxes, pull boxes, equipment vaults and enclosures, foundations or pads for surface-mounted equipment. Trenching. See Excavation. "Visible from" means that overhead distribution facilities could be seen by motorists or pedestrians traveling along scenic highways or visiting parks or scenic areas.

( Code 1980, § 3.46.160 ; Ord. No. 736 § 2, 2004 ; Ord. No. 870 (Recodification), 2014 )