For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.29.020 — Definitions

Municipal Code, City of Roseville, California · Roseville Municipal Code § 13.29.020

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/e3d53534-6735-4bc3-a270-7eaeebbcddd7

§ 13.29.020: Definitions.

For the purposes of this chapter, the following words and phrases shall have the meanings respectively ascribed to them by this section: "Applicant" shall mean both the person applying for an excavation permit and the person owning the facility or installation for which the excavation will be made. "City" shall mean the City of Roseville. "City engineer" shall mean the city engineer for the city or an authorized representative. "Excavation" shall mean any cutting or trenching in or under the paved surface or subsurface of the public right of way for the installation, repair, replacement or removal of any pipe, conduit, duct, tunnel, utility pole, or any other facility or installation. "Hierarchy of streets" shall mean the segmentation of city streets into designations of major arterial streets, minor arterial streets, collectors, and residential streets. Such designations are based on the volume of traffic and a street's purpose and location. "Joint trenching" shall mean any cutting or trenching coordinated between two or more utilities and/or the city. "Moratorium streets" shall mean those streets that: (1) have a pavement quality index of 8.5 or greater; or (2) were surfaced or resurfaced within the previous five years. "Pavement Quality Index" or "PQI" shall mean the value given the quality of the pavement surface of a street where a newly constructed or recently re-surfaced street is generally rated at 10.0 and an older street with poor pavement quality is generally rated at 3.0 or less. "Permittee" shall mean both the person receiving an excavation permit and the person owning the facility or installation for which the excavation will be made. "Person" shall mean any person, company, partnership, agency or other public or private entity. "Planned major utility work" shall mean any and all future excavations planned by a utility that will affect a particular area of any city street, alley, sidewalk or other public right-of-way for more than five days. "Resurfacing" shall mean any re-paving, overlay, seal or reconstruction which constructs a new pavement surface of greater than one-inch thickness over the entire width of the street, excluding crack seals. Those terms excluded from the definition of resurfacing shall include micropaving, Class 1 to 3 slurry seals, cape seals, and chip seals.

( Ord. 3524 § 1, 2000 ; Ord. 3602 § 1, 2000 ; Ord. 5279 § 13, 2014 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.