For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.29.180 — Coordination of excavations

Municipal Code, City of Roseville, California · Roseville Municipal Code § 13.29.180

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/b9041aa0-c127-4386-9418-a5d62ac6d9fe

§ 13.29.180: Coordination of excavations.

A. Any entity owning, operating or installing in city streets, alleys, sidewalks or any other public place, facilities providing water, sewer, gas, electric, communication, video or other utility services, is encouraged to prepare and submit to the director a conceptual utility master plan, in a format specified by the director, that shows the location of its planned major utility work in streets, alleys, sidewalks and other public places for the subsequent three years. The director shall confer with participating utilities and adopt procedures for implementing this subsection. B. Any city department operating or installing utility facilities in public rights of way shall prepare and submit to the director a utility master plan that shows the location of the department's existing facilities and all of the department's planned future major utility work. An initial utility master plan shall be submitted no later than 180 days after the effective date of the ordinance codified in this chapter. Thereafter, each such department shall annually submit, on the first regular business day of July, a revised and updated utility master plan. In order to facilitate coordination and to minimize the cost of excavation, the director shall make all such department utility master plans available to other entities engaged in excavation activities. C. The director shall make all utility master plans, submitted in accordance with subsections A and B of this section, available for public inspection, except as provided in subsection D of this section. D. The director shall disclose information contained in any entity's three-year plan only on a "need-to-know" basis in order to facilitate coordination among excavators and to avoid unnecessary excavations. To the maximum extent legally permissible, the city shall not otherwise disclose any information contained in a submitted five-year plan that is proprietary, or a trade secret or is otherwise protected from disclosure; provided, however, that the city shall have no duty to decline to disclose any information that has not been identified on its face as proprietary, a trade secret or otherwise protected from disclosure. The director shall notify a participating entity of any request for inspection of public records that calls for disclosure of any five-year plan on which any information has been identified as proprietary, a trade secret or otherwise protected from disclosure. The director shall consult with the city Attorney regarding any such request and shall inform the affected entity either that the director will refuse to disclose the protected information or, if there is no proper basis for such refusal, that the director intends to disclose the requested information unless ordered otherwise by a court. E. The director shall prepare a five-year resurfacing plan showing street resurfacing by the city for the next five years. The five-year resurfacing plan shall be revised and updated on a semi-annual basis. The director shall make the city's five-year resurfacing plan available for public inspection. In addition, after determining the street resurfacing work that is proposed for each year, the director and the utility public works Coordinator shall send a notice of the proposed work to all entities that have current utility master plans on file. The city shall not be liable for any entity's costs incurred as a result of changes in the city's resurfacing plan. F. Prior to applying for an excavation permit, any entity planning to excavate in the city's streets, alleys, sidewalks or other public places shall review the utility master plans and the city's five-year resurfacing plan on file with the director and shall coordinate, to the extent practicable, with the utility and street work shown on such plans to minimize damage to, and avoid undue disruption and interference with the public use of such streets, alleys, sidewalks or other public places. G. Excavations in city streets disrupt and interfere with their use and damage the pavement. The purpose of this section is to reduce this disruption, interference and damage by promoting better coordination among utilities making excavations and between these utilities and the city. Better coordination will assist in minimizing the number of excavations being made wherever feasible, and will ensure that excavations are, to the maximum extent possible, performed before, rather than after, the resurfacing of the streets by the city. Coordination also provides a means for utilities to avoid payment of a trench cut cost recovery fee either by eliminating the need for a new excavation, or, if an excavation is made, by allowing the excavation to qualify for an exemption from the trench cut cost recovery fee pursuant to Section 13.29.050(B) of this chapter. However, even utilities performing the best possible coordination will find it necessary to make excavations that do not qualify for an exemption from the trench cut cost recovery fee. For this reason, and in order to encourage maximum coordination, utilities coordinating and sharing common trenches shall pay a proportionately reduced trench cut cost recovery fee based upon each utility's proportional use of a joint trench. The director shall adopt procedures for implementing this subsection.

( Ord. 3524 § 1, 2000 ; Ord. 3602 § 1, 2000 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.