For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.29.100 — Opening, backfilling and paving trenches

Municipal Code, City of Roseville, California · Roseville Municipal Code § 13.29.100

Corpus is an independent public-information project, not the official City of Roseville website. Stable reference: corpuslaw.us/code/1614988d-8b84-4f81-b9a0-d40ea3a7c9e9

§ 13.29.100: Opening, backfilling and paving trenches.

A. No trench shall be opened in any street for the purpose of laying pipes, conduits or ducts more than 300 feet in advance of the pipe, conduit or ducts being placed in the trench, except as specified in the special conditions of the permit, or with the consent of the director or his or her designee. B. All excavations shall comply with the city's construction standards and requirements established from time to time by the director for compacting, backfilling and pavement restoration. The standards and requirements may impose different requirements for different excavations, taking into consideration relevant factors, such as (i) the location, type and extent of excavation performed, (ii) the condition of the surface being excavated, (iii) the period of time elapsed since the construction or most recent resurfacing of the surface being excavated, and (iv) street classifications. The standards and requirements shall be reviewed at least once every five years to determine whether any changes can be made to prevent or substantially reduce the degradation and damage caused to the street surface by excavation. As part of such review, the director shall provide affected utilities with an opportunity to review and comment upon the standards and requirements and any changes proposed thereto. C. The excavated pavements and materials shall be removed within a reasonable period of time from the city right of way, provided that exceptions to this requirement may be approved by the director. After backfilling is completed, and prior to re-paving the cut, the contractor or applicant shall remove all loose paving material and trim the edges of the excavation at the street surface to the satisfaction of the director. D. Whenever any caving occurs in the side walls of any excavation, the pavements above such caving shall be cut away at the expense of the permittee. In no case shall any void under a pavement be filled by any side or lateral tamping.

( Ord. 3524 § 1, 2000 ; Ord. 3602 § 1, 2000 )

Ask a question about Roseville law

Corpus searches the Roseville sections it holds and shows the ones that match, with their citations. Free, no sign-in.