§ 20.330.050 — Landscape Documentation Package Submittal Milestones
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.330.050
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/246b70fb-20ae-45aa-ae02-ac0363cb06d6
Section 20.330.050 - Landscape Documentation Package Submittal Milestones
Prior to final approval of the Landscape Documentation Package, the Planning Division must obtain approval from the local water purveyor to verify that the water budget calculations specified in the Landscape Documentation Package meet the water allocation specified by the local water purveyor. A. Prior to Construction. Prior to construction, Planning Division shall do the following: 1. Provide the project applicant a copy of the Landscape Regulations and procedures for design review, plan checks, or permits. Copies of the reference Evapotranspiration Table, Water Efficient Landscape Worksheet, a Certification of Completion form and Prescriptive Compliance Option shall be provided in the landscape application form. 2. Review the Landscape Documentation Package submitted by the project applicant. 3. Approve or deny the Landscape Documentation Package. 4. Complete the design review, approve the plans, and issue a permit. 5. Upon approval of the Landscape Document Package, submit an electronic copy of the Water Efficient Landscape Worksheet to the local retail water purveyor. B. During Construction. During construction, the project applicant shall do the following: 1. Maintain an approved Landscape Documentation Package at the job site. 2. Maintain an approved copy of the Landscape Permit and a record the date of the approval of the landscape Permit. C. Post Completion. Upon completion of all landscape design, the project applicant shall do the following: 1. Obtain a Certificate of Completion signed by Planning Division. 2. Submit an electronic copy of the approved Landscape Documentation Package along with the record drawings, and an electronic copy of the Water Efficient Landscape Worksheet to the local retail water purveyor. D. On-Going Responsibility. The applicant's on-going responsibility after Planning Division signs off the Certificate of Completion is to contact the local retail water purveyor, or a certified landscape irrigation auditor, and secure a landscape audit that will include a recommended irrigation schedule. Landscape audits shall not be conducted by the person who designed or installed the landscape. E. Establishment Period. The first eighteen (18) months after the City approves planting shall be considered as the "establishment period" for the landscape plant materials. A bond or cash deposit will be submitted to the City, prior to issuing a Landscape Permit and held until a final inspection is conducted by the City to verify the landscape is thriving in a healthy manner. It will be the responsibility of the developer/owner to contact the City a minimum of thirty (30) days prior to end of the eighteen (18) months for the final inspection.
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.