§ 20.330.070 — Certificate of Completion
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.330.070
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/29faf7dd-2913-401a-8ea9-f8fc231df8e7
Section 20.330.070 - Certificate of Completion
A. The Certificate of Completion (sample provided in Landscape Application) shall include the following information and documentation: 1. Date; 2. Project name; 3. Project applicant name, telephone, and mailing address; 4. Project address and location; 5. Property owner name, telephone number, and mailing address; 6. Certification by either the signer of the landscape design plan, the signer of the irrigation design plan, or the licensed landscape contractor that the landscape project has been installed per the approved Landscape Document Package. Where there have been significant changes made in the field during construction, "as-built" or record drawings shall be included with the certification; 7. A diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes; 8. Irrigation audit report, see Section 20.330.100 (Irrigation Audit, Irrigation Survey and Irrigation Water Use Analysis); 9. Parameters used to set the controller; see Section 20.330.080 (Irrigation Scheduling); 10. Landscape and irrigation maintenance schedule; see Section 20.330.090 (Landscape and Irrigation Maintenance Schedule); and 11. Soils analysis report, if not submitted with Landscape Design package, and documentation verifying implementation of soil report recommendations; see Section 20.330.060.C (Soil Management Report). B. The project applicant shall do as follows: 1. Submit the signed Certificate of Completion to the Planning Division for review. 2. Ensure that copies of the approved Certificate of Completion are submitted to local retail water purveyor and property owner or his/her designee. C. The Planning Division shall do the following: 1. Receive the Certificate of Completion from the project applicant. 2. Approve or deny the Certificate. If the Certificate of Completion is denied, the Planning Division shall provide information to the project applicant regarding reapplication, appeal or other assistance.
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.
