§ 20.330.060 — Landscape Documentation Package Elements
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.330.060
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/a91f62c1-3ee1-4d32-af0b-7c26c8cca8e7
Section 20.330.060 - Landscape Documentation Package Elements
The Landscape Documentation Package shall include following elements: A. Project information. Project information regarding the landscape project shall contain all the following: 1. Date of submittal. 2. Project applicant's full name. 3. Project address and/or assessor parcel number(s). 4. Total existing and proposed landscape area in square feet. 5. Define project type (e.g., new, rehabilitated, public, cemetery, owner-installed). 6. Adjacent land uses and zoning designations. 7. Approximate location and quantity of all proposed and existing specimen trees. 8. Location of all existing and proposed storm, sanitary, and utility lines. Root barriers shall be required when trees are planted within five (5) feet (or as directed by the local water purveyor) of public water and sewer mains. 9. Location of all existing and proposed contours two (2)-foot minimum. 10. Location of proposed and existing buildings, structures and paved areas. 11. Landscape Plans must be drawn to scale, and in cases where a grading permit is required, both landscape and grading plans must be the same scale. 12. Provide a planting schedule with proposed plant material names (common and botanical), quantity, size, and spacing, and any special planting notes. Size of plants should be describing the actual size at the time the plant is installed. 13. Separate landscape plan(s) submittal will be required for: a. Community Facilities District (CFD) Areas. b. Privately Owned Landscape Areas. c. Homeowners' Association (HOAs). d. Master Development Associations. e. Master Retail Associations. 14. Landscape plans must address all BMPs, coincide with grading plans, address brush management Zones, and address biological constraints. 15. The landscape plan must also address any sight visibility triangle issue if applicable. 16. All hardscape, i.e., decorative paving, scored concrete, trellis design, location of monument sign and other special design items must be addressed on the landscape plans. 17. Water supply type (e.g., potable, recycle, or well, identify local retail water purveyor if the project is not served by a private well). 18. Completed checklist of all documents in the Landscape Documentation Package. 19. Project contacts to include contact information (name, address, and phone number) for the project applicant, landscape architect, contractor, and property owner. 20. Applicant/property owner signature and date with the following statement: "I agree to comply with the requirements of the Water Efficient Landscape Regulations and submit a complete Landscape Documentation Package." B. Water Efficient Landscape Worksheet. 1. A project applicant shall complete the Water Efficient Landscape Worksheet which is provided with the City's Landscape Application packet. The worksheet should contain information on the plant factor, irrigation method, irrigation efficiency, and area associated with each hydrozone. Calculations are then made to show that the evapotranspiration adjustment factor (ETAF) for the landscape project does not exceed a factor of 0.55 for residential areas and 0.45 for nonresidential areas, exclusive of Special Landscape Areas. The ETAF for a landscape project is based on the plant factors and irrigation methods selected. The Maximum Applied Water Allowance is calculated based on the maximum ETAF allowed (0.55 for residential areas and 0.45 for non-residential areas) and expressed as annual gallons required. The Estimated Total Water Use (ETWU) is calculated based on the plants used and irrigation method selected for the landscape design. ETWU must be below the MAWA. In calculating the Maximum Applied Water Allowance and Estimated Total Water Use, a project applicant shall use the ETo values from the Reference Evapotranspiration Table provided in the Landscape Application handout from the Planning Division. 2. Water budget calculations shall adhere to the following requirements: a. The plant factor used shall be from Water Use Classification of Landscape Species (WUCOLS) published by the California Department of Water Conservation or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). The plant factor ranges from 0 to 0.1 for very low water using plants, 0.1 to 0.3 for low water use, from 0.4 to 0.6 for moderate water use plants and from 0.7 to 1.0 for high water use plants. b. All water features shall be included in the high water use hydrozone and temporarily irrigated areas shall be included in the low water use hydrozone. c. All special landscape Area shall be identified and its water use calculation as described in "Water Efficient Landscape Worksheet". d. Evapotranspiration Adjustment Factor (ETAF) for new and existing (non-rehabilitated) Special Landscape Area Water Allowance shall not exceed 1.0 ETAF. C. Soil Management Report. In order to reduce runoff and encourage healthy plant growth, a soil management report shall be completed as follows: 1. The soil management plan shall be prepared by a licensed landscape architect, licensed civil engineer, or a licensed architect. 2. Submit soil sample to a laboratory for analysis and recommendations a. Soil sampling shall be conducted in accordance with laboratory protocol, including protocols regarding adequate sampling depth for the intended plants; and b. The soils analysis shall include: i. Soil texture; ii. Infiltration rate determined by laboratory test or soil texture infiltration rate table; iii. pH level; iv. Total soluble slats; v. Sodium level; vi. Percentage of organic matter; vii. Recommendations about the soil amendments may be necessary to foster plant growth and plant survival in the landscape area using efficient irrigation techniques. c. In projects with multiple landscape installations (i.e., production home developments) a soil sampling rate of 1 in 7 lots or approximately 15% will satisfy this requirement. Large landscape projects shall sample at a rate equivalent to 1 in 7 lots. 3. The project applicant shall comply with one (1) of the following: a. If the project does not exceed the movement of greater than fifty (50) cubic yards of dirt, the soil analysis report shall be submitted to Development Services Department as part of the Landscape Documentation Package. b. If greater than fifty (50) cubic yards of dirt is moved, the soil analysis report shall be submitted accompanied by the Certificate of Completion. c. The soils analysis report shall be readily available to the professionals preparing the landscape and irrigation design plans. d. The project applicant shall submit documentation verifying implementation of the soil analysis report recommendations to Development Services Department with the Certificate of Completion. D. Landscape Design Plan. For efficient use of water, a landscape plan shall be carefully designed and planned for the intended function of the project. A landscape design plan meeting following design criteria shall be submitted as part of the Landscape Documentation Package. 1. Plant Material. a. Any plant may be selected for the landscape, providing the total landscape area does not exceed the Maximum Applied Water Allowance. Methods to achieve water efficiency shall include one or more of the following: i. Protection and preservation of native species and natural vegetation; ii. Selection of water conserving plant species, tree species and turf species, especially local native plants; iii. Selection of canopy shading; iv. Selection of plants based on local climate suitability, disease and pest resistance; and v. Selection of plants from Fuel Modification Plan Guidelines. b. Each hydrozone shall have plant materials with similar water use, with the exception of plants with mixed water use. For hydrozones with plants of mixed use, refer to Section 20.330.060.F (Hydrozone Design) for more information. Plants shall be selected and planted appropriately based upon their adaptability to climate, geologic, and topographical conditions of the project site. Methods to achieve water efficiency shall include one or more of the following: i. Use the Sunset Western Climate Zone that takes into account temperature, humidity, elevation, terrain, latitude, and varying degrees of continental and marine influence on local climate. ii. Recognize the horticulture attributes of plants (i.e., mature plant size, invasive surface roots) to minimize damage to property or infrastructure (e.g., building, sidewalks, power lines) allow for adequate soil volume for healthy root growth. iii. Consider the solar orientation for plant placement to maximize summer shade and winter solar gain. c. Turf is not allowed on slopes greater than twenty-five percent (25%) where the toe of the slope is adjacent to an impermeable hardscape and where twenty-five percent (25%) means one (1) foot of vertical elevation change for every four (4) feet of horizontal length (rise divided by run x 100 = slope percent). d. High water use plants, characterized by a plant factor of 0.7 to 1.0, are prohibited in street medians. e. A landscape design plan for projects in fire-prone areas shall address fire safety and prevention. A defensive space or Zone around a building or structure is required per Public Resources Code Sections 4291(a) and (b). Avoid fire-prone plant materials and highly flammable mulches. f. The use of invasive species such as those listed by the California Invasive Plant Council is prohibited. g. Invasive species of plants shall be avoided especially near parks, buffers, greenbelts, water bodies, and open spaces because of their potential to harm environmentally sensitive areas. h. The architectural guidelines of a common interest development, which include community apartment projects, condominiums, planned developments, and stock cooperatives, shall not prohibit or include conditions that have an effect of prohibiting the use of low-water use plants as a group (Civil Code Section 1358.8). 2. Water Features. Re-circulating water shall be used for water features. Water features must comply with San Diego County Department of Environmental Health standards. Surface area of a water feature shall be included in the high water use hydrozone area of the water budget calculations. 3. Soil Preparation, Mulch and Amendments: i. Prior to the planting of any materials, compacted soils shall be transformed to a friable condition. On engineered slopes, only amended planting holes need meet this requirement. ii. Soil amendments shall be incorporated according to recommendations of the soil report and what is appropriate for the plants selected. iii. For landscape installations, compost at a rate of a minimum of four cubic yards per 1,000 square feet of permeable area shall be incorporated to a depth of six inches into the soil. Soils with greater than 6% organic matter in the top six (6) inches of soil are exempt from adding compost and tilling. iv. A minimum four (4)-inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except in turf area, creeping or rooting ground covers or direct seeding applications where mulch is contraindicated. To provide habitat for beneficial insects and other wildlife, up to 5% of the landscape area may be left without mulch. Designated insect habitat must be included in the landscape design plan as such. v. Stabilizing mulching products shall be used on slopes that meet current engineering standards. vi. The mulching portion of the seed/mulch slurry in hydro-seeded applications shall meet the mulching requirements. vii. Organic mulch materials made from recycled or post-consumer shall take precedence over inorganic materials or virgin forest products unless the recycled post-consumer organic products are not locally available. Organic mulches are not required where prohibited by local Fuel Protection Plan Guidelines or other applicable City regulations. 4. The landscape design shall at a minimum contain the following: i. Delineate and label hydrozone by number, letter, or other method. ii. Identify each hydrozone as low, moderate, high-water use, or mixed water-use. Temporarily irrigated areas of the landscape shall be included in the low water use hydrozone for the water budget calculation. iii. Identify recreation areas. iv. Identify areas permanently and solely dedicated to edible plants. v. Identify areas irrigated with recycled water. vi. Identify type of mulch and application depth. vii. Identify soil amendments, type, and quantity. viii. Identify type and surface area of water features. ix. Identify hardscapes (pervious and on-pervious). x. Identify location, installation details and 24-hour retention or infiltration capacity of any applicable storm water best management practices that encourage on-site retention and infiltration of storm water. Project applicants shall refer to the City or regional Water Quality Control Board for information on any applicable stormwater technical requirements. Storm water best management practices are encouraged in the landscape design plans and examples are provided in Section 20.330.140. xi. Identify any applicable rain harvesting or catchment technologies as discussed in Section 20.330.140 Storm Water Management and Rainwater Retention, and their 24-hour retention or infiltration capacity. xii. Identify any applicable graywater discharge piping, system components and area(s) of distribution. xiii. The landscape design shall have the following statement: "I have complied with the criteria of this chapter and applied them for the efficient use of water in the landscape design plan." xiv. The signatures of a licensed landscape architect, licensed landscape contractor, or any other applicable landscape professional, person, licensed or unlicensed, as listed in the Business and Professions Code, California Code of Regulations, or Food and Agricultural Code. E. Irrigation Design Plan. This section applies to landscaped areas requiring permanent irrigation, not areas that require temporary irrigation solely for the plant establishment period. For the efficient use of water, an irrigation system shall meet all the requirements listed in this section and the manufacturer recommendations. The irrigation system and its related components shall be planned and designed to allow for proper installation, management, and maintenance. An irrigation design plan meeting the following design criteria shall be submitted as part of the Landscape Documentation package: 1. Landscape water meters, defined as either a dedicated water service meter or private submeter shall be installed for all non-residential irrigated landscapes of 1,000 sq. ft. but not more than 5,000 sq. ft. (the level at which Water Code Section 535 applies) and residential irrigated landscapes of 5,000 sq. ft. or greater. A landscape water meter may be either: a. A customer service meter dedicated to landscape use provided by the local water purveyor; or b. A privately owned meter or submeter. 2. Automatic irrigation controllers utilizing either evapotranspiration or soil moisture sensor data utilizing non-volatile memory shall be required for irrigation scheduling in all irrigation systems. 3. If the water pressure is below or exceeds the recommended pressure of the specified irrigation devices, the installation of a pressure regulating device is required to ensure that the dynamic pressure at each emission device is within the manufactures recommended pressure range for optimal performance: a. If the static pressure is above or below the required dynamic pressure of the irrigation system, pressure-regulating devices such as inline pressure regulators, booster pumps or other devices shall be installed to meet the required dynamic pressure of the irrigation system. b. Static water pressure, dynamic or operating pressure and flow reading of the water supply shall be measured at the point of connection. These pressure and flow measurements shall be conducted at design stage. If the measurements are not available at the design stage, the measurement shall be conducted at installation. 4. Sensors (rain, freeze, wind, etc.) either integral or auxiliary, that suspend or alter irrigation operation during unfavorable weather conditions such as rain or a freeze shall be required on all irrigation systems, as appropriate for local climate conditions. Irrigation should be avoided during windy or freezing weather or during rain. 5. Manual shut-off valves (such as gate valves, ball valve, or butterfly valve) shall be required as close as possible to the point of connection of the water supply, to minimize water loss in case of an emergency (such as a main break) or routine repair. 6. If separate water meters are proposed, backflow prevention devices shall be required to protect the water supply from contamination by the irrigation system. A project applicant shall contact the San Diego County Department of Environmental Health for additional backflow prevention requirements. 7. Flow sensors that detect high flow conditions created by system damage or malfunction are required for all on non-residential landscapes and residential landscapes of 5,000 sq. ft. or larger. 8. Master shut-off valves are required on all projects except landscapes that make use of technologies that allow for the individual control of sprinklers that are individually pressurized in a system equipped with low pressure shut down features. 9. The irrigation system shall be designed to prevent runoff, low head drainage, overspray, or other similar conditions where irrigation water flows onto non-targeted areas, such as adjacent property, non-irrigated areas, hardscapes, roadways, or structures. 10. Relevant information from the soil management plan, such as soil type and infiltration rate, shall be used when designing irrigations systems. 11. The design of the irrigation system shall conform to the hydrozones of the landscape design plan. 12. The irrigation system must be designed and installed to meet, at a minimum, the irrigation efficiency criteria as described in Section 20.330.060.B regarding the Maximum Applied Water Allowance. 13. All irrigation emission devices must meet the requirements set in the American National Standards Institute (ANSI) standard, American Society of Agricultural and Biological Engineers'/International Code Council's (ASABE/ICC) 802-2014 "Landscape Irrigation Sprinkler and Emitter Standard, All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ICC 802-2014. 14. The project applicant shall inquire with the retail water purveyor about peak hour water operating demands (on the water supply system) or water restrictions that may impact water availability or water pressure and could compromise the effectiveness of the irrigation system. 15. In mulched planting areas, the use of low volume water irrigation is required to maximize water infiltration into the roots. 16. Sprinkler heads and other emission devices shall have matched precipitation rates, unless otherwise directed by the manufactures specifications. 17. Head to head coverage is recommended. However, sprinkler spacing shall be set to achieve distribution uniformity using the manufactures specifications. 18. Swing joints or other riser-protection components are required on all risers subject to damage that are adjacent to hardscaped or in high traffic areas of turf grass. 19. Check valves or anti-drain valves are required on all sprinkler heads where low point drainage could occur. 20. Areas less than ten (10) feet in width in any direction shall be irrigated with subsurface irrigation or other means that produces no runoff or overspray. 21. Overhead irrigation shall not be permitted within twenty-four (24) inches of any non-permeable surface. Allowable irrigation within the setback from a non-permeable surface may include drip, drip line, or other low flow non-spray technology. The setback area may be planted or unplanted. The surfacing of the setback may be mulch, gravel, or other porous material. These restrictions may be modified if: a. The landscape area is adjacent to permeable surfacing and no runoff occurs; or b. The adjacent non-permeable surfaces are designed and constructed to drain entirely to landscaping; or c. The irrigation designer specifies an alternative design or technology, as part of the Landscape Documentation package, and clearly demonstrates strict adherence to irrigation system design criteria in Section 20.330.060.E (Irrigation Design Plan). Prevention of overspray and runoff must be confirmed during irrigation audit. 22. Slopes greater than twenty-five percent (25%) shall not be irrigated with an irrigation system with a application rate exceeding three-quarter (0.75) inch per hour. This restriction may be modified if the landscape designer specifies alternative design or technology, as part of the Landscape Documentation Package, and clearly demonstrates no runoff or erosion will occur. Prevention of runoff and erosion must be confirmed during the irrigation audit. 23. The irrigation design plan shall contain the following statement: "I have complied with the criteria of this chapter and applied them accordingly for the efficient use of water in the irrigation design plan." 24. Provide the signature of a licensed landscape architect, certified irrigation designer, licensed landscape contractor, or any other applicable landscape professional person, authorized to design an irrigation system as listed in the Business and professional Code, California Code of Regulation, or Food and Agriculture Code. F. Hydrozone Design. 1. Each valve shall irrigate a hydrozone with a similar site, slope, sun exposure, soil conditions, and plant materials with similar water use. 2. Sprinkler heads and other emission devices shall be selected based on what is appropriate for the plant type within that hydrozone. 3. Where feasible, trees shall be placed on separate valves from shrubs, ground covers, and turf to facilitate the appropriate irrigation of trees. The mature size and extent of the root zone shall be considered when designing irrigation for the tree. 4. Individual hydrozones that mix plants of moderate and low water use or moderate and high water use, may be allowed if: a. Plant factor calculation is based on the proportions of the respective plant water uses and their plant factor or b. The plant factor of the higher water using plant is used for calculations. 5. Individual hydrozones that mix high and low water use plants shall not be permitted. 6. On the landscape design plan and irrigation design plan, hydrozone areas shall be designated by number, letter or other designation. On the irrigation design plan, designate the areas irrigated by each valve, and assign a number to each valve. Use this valve number in the Hydrozone Information table. This table can also assist with pre- and final inspections of the irrigation system and programming the controller. 7. The irrigation design plan shall show location and size of separate water meters for landscape. 8. Show location, type and size of all components of the irrigation system, including controllers, main and lateral lines, valves, sprinkler heads, moisture sensing devices, rain switches, quick couplers, pressure regulators, and backflow devices. 9. Show the static water pressure at the point of connection to the public water supply. 10. Describe the flow rate (gallons per minute), application rate (inches per hour) and design operating pressure (pressure per square inch) for each station. 11. Indicate if there is recycle water being used for the irrigation system and if so, as specified in Section 20.330.120 (Recycled Water). 12. For the efficient use of water, an irrigation system shall meet all the requirements listed in this section and the manufactures specifications. The irrigation system and its related components shall be planned and designed to allow for proper installation, management and maintenance. An irrigation design plan meeting the following design criteria shall be submitted as part of the Landscape Documentation Package. 13. Weather-based irrigation controllers or soil moister-based controllers or other self-adjusting irrigation controllers shall be required for irrigation scheduling in all irrigation systems. G. Grading Design Plan. For efficient use of water, grading of a project site shall be designed to minimize soil erosion, runoff, and water waste. A grading design plan shall be submitted as part of the Landscape Documentation Package. A comprehensive grading plan shall be prepared by a civil engineer, that satisfies this requirement. 1. The project applicant shall submit a landscape grading plan that indicates finish configurations and elevations of the landscaping area, including the following: a. Height of graded slopes; b. Drainage patterns; c. Pad elevations; d. Finished grade; and e. Storm water retention improvements, if applicable. 2. To prevent excessive erosion and runoff, it is highly recommended that the applicant: a. Grade so that all irrigation and normal rainfall remains within property lines and does not drain on to non-permeable hardscapes; b. Avoid disruption of natural drainage patterns and undisturbed soil; and c. Avoid soil compaction in landscape areas. 3. The grading design plan shall contain the following statement: "I have complied with the criteria of this chapter and applied them accordingly for the efficient use of water in the grading design plan" and the signature of a licensed professional as authorized by law. H. Fuel Protection Plan. Establish a meeting with the Fire Marshal early in the design process to determine if a Fuel Protection Plan (FPP) is required. The fuel management area shall be designed with the appropriate plant species recognized under the FPP. I. Biological Constraints Plan. If it is determined that the project site is located in a biologically sensitive area, the following shall apply: 1. The landscape plans shall be reviewed and approved by a certified biologist for: a. Compatible plants that are not considered invasive. b. Confirm the boundary of the biological constraint area. c. Arrange for the biologist to be present for the preconstruction meeting to discuss any constraints with developer. d. Have the biologist assist the civil engineer in stacking the construction buffer area. e. Submit a copy of all Agency Permits, a copy of an approved Property Assessment Records (PAR) and maintenance plan prior to any grading activity. J. Screening of Utilities/Equipment. A utility plan must be submitted with the site plan prior to recording easements in an effort to coordinate placement of all utilities. 1. Mechanical equipment, such as cooling towers, air compressors, pool pumps, transformers, sprinkler pumps, satellite dish antennae, etc., must be adequately screened. 2. Screening shall exceed the vertical height of the equipment being screened by at least six (6) inches. A three (3)-foot open area shall be maintained around such equipment to facilitate repairs. K. Landscape Maintenance/Terms. All plants shall be maintained in a healthy and thriving condition. Initially, it shall be the responsibility of the developer to maintain (water and weed) all slopes where required by the provisions of this chapter until such time as the property is occupied by reason of lease or purchase, at which time the responsibility for such maintenance shall be transferred to a mandatory Community Association. Covenants, Conditions, and Restrictions of the subject tract shall provide for acceptance of the responsibility for maintenance by the Community Association. 1. Maintenance shall include restoration of any portion of a slope area affected by installation of walls, fences, pools and the like. 2. A special brochure or maintenance plan shall be prepared by the responsible landscape architect for the purpose of instructing the lessee or purchasers of the property and any landscape maintenance company working on the property on the proper maintenance and watering of landscape slopes, and these landscape brochures or maintenance plan must be submitted and approved by the Planning Division prior to the issuance of a building permit or as directed by the Director.
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.
