§ 815.3.050: Time period for compliance/priority designation.
a) Retrofit Phases. The Owner of any building subject to the provisions of this Chapter shall meet the requirements as specified in the following two Phases: Phase 1: Engineering Report and Major Deficiency Mitigation. The Owner shall submit an engineering report to the Building Official demonstrating whether the structure conforms to the design provisions contained in this Chapter and identify all structural deficiencies in accordance with ASCE 41. Minimum report requirements shall be as specified by the Building Official. Buildings identified to have any of the Major Deficiencies listed below shall be required to Retrofit the building in such a way to mitigate the identified Major Deficiency within the time limits allowed in Table A. Alternatively, the engineering report may show that the Major Deficiencies meet the requirements of ASCE 41 through advanced analysis. Major Deficiencies: 1. | Load Path 2. | Weak or Soft Story 3. | Vertical Irregularity 4. | Torsion 5. | Captive Column Alterations made to the structure to mitigate the Major Deficiencies listed above shall not impact existing lateral load elements by increasing any demand-to-capacity ratio by more than 10 percent unless the existing elements are shown to be capable of resisting the increased demand. In addition, the mitigation of the Major Deficiencies shall not create additional deficiencies or make the existing deficiencies more severe. Phase 2: Complete Retrofit. The Owner shall complete the Retrofit of the structure to meet the requirements specified in Section 815.3.090 and mitigate all remaining deficiencies within the time limits allowed in Table A. TABLE A TIME PERIOD FOR COMPLIANCE Phase 1: Engineering Report & Major Deficiency Mitigation1,2 | Phase 2: Complete Retrofit4 Phase | Submit Engineering Report & Determine All Structural Deficiencies | Submit Retrofit Plans for Major Deficiency Mitigation | Obtain Building Permit & Commence Construction | Complete Major Deficiency Mitigation Construction3 | Submit Retrofit Plans | Obtain Building Permit & Commence Construction | Complete Construction Milestone | 3 Years from notice to the Owner | 5 Years from notice to the Owner | 7 Years from notice to the Owner | 10 Years from notice to the Owner | 13 Years from notice to the Owner | 15 Years from notice to the Owner | 20 Years from notice to the Owner 1) All buildings within the scope of this Chapter are required to submit an engineering report and determine all structural deficiencies. Buildings that do not contain any of the Major Deficiencies as defined in this Chapter are not required to submit Retrofit plans for Major Deficiency mitigation, commence construction, and complete construction in Phase 1, but shall provide Retrofit plans and complete construction within the time limits provided in Phase 2. 2) Phase 1 Retrofit plans must indicate preliminary Phase 2 Retrofit extents. Minimum Phase 2 scoping requirements shall be as specified by the Building Official. 3) Completion of Phase 1 may be extended by 3 years if retrofit plans in accordance with the scope of Phase 2 are designed, approved, permitted, and constructed within Phase 1. 4) The Building Code version governing Phase 1 shall be permitted to be utilized in Phase 2. b) Priority Designations. The Department shall prioritize its enforcement of this Chapter as defined in Table B. TABLE B PRIORITY DESIGNATION Priority | Description Priority I. | Buildings with 8 or more stories Priority II. | Buildings with 3 to 7 stories Priority III. | Buildings with 2 or less Stories
Ask a question about Torrance law
Corpus searches the Torrance sections it holds and shows the ones that match, with their citations. Free, no sign-in.