§ 13.22.120: Recycled water service application.

Application for a recycled water connection must be made on form(s) provided by the city. The general steps for obtaining recycled water service are as follows: A. Applicant completes and submits a recycled water service application to the city, including existing facility as-built drawings or proposed facility plans as appropriate, description of where and how recycled water use is proposed, and any other information pertinent to the use of recycled water; B. Applicant shall submit an engineering report prepared by a licensed engineer, registered in California and experienced in the field of wastewater treatment, describing proposed/requested recycled water use(s), to DHS for approval. Applicant may request the city to request IEUA to prepare the engineering report, provided that the applicant pays all costs associated with its preparation. The engineering report shall contain: 1. Description of the design of the proposed reclamation system, 2. Means for compliance with regulations governing the use of recycled water and any other features required by regulatory agencies governing the use and/or distribution of recycled water, and 3. Contingency plan which will assure that no untreated or inadequately treated wastewater will be delivered to the intended use area; C. Applicant will address any concerns that the DPH may have regarding the engineering report and revise it accordingly; Applicant may request IEUA, through the city, for assistance in addressing DPH concerns; D. Upon DPH approves the engineering report, the applicant may elect to enter into a recycled water use agreement with the city and concurrently pay any applicable fees; E. The city schedule start-up tests of applicant's on-site recycled water system to verify and ensure that cross-connections do not exist; and F. Upon the successful completion of the cross-connection test, recycled water service is authorized.

( Ord. 1839 § 1, 2009 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.