For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.22.230 — Construction

Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Municipal Code § 13.22.230

Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/fa204ebd-a298-4c0e-ab61-942a4b8644a1

§ 13.22.230: Construction.

A. Construction of all new recycled water facilities will follow standards and specifications adopted or used by the city and the American Water Works Association Construction Guidelines for recycled water facilities. B. Where it is planned that an existing nonrecycled water system shall be converted to a recycled water facility, the facility to be converted to use recycled water shall be investigated in detail at the user's or owner's expense, to determine the measures required to bring its system into full compliance with this chapter. No existing potable water facilities shall be connected to or incorporated into the recycled water system without approval from the city and DPH. C. If, due to on-site failure of a recycled water system, the city determines that it is necessary to convert on-site facilities from recycled water system to potable water system it shall be the responsibility of the user or owner to pay all costs for such conversion. Conversion costs may include, but not be limited to, the following: 1. Isolation of the recycled water supply. Service shall be removed and plugged at the city's main or abandoned in a manner approved by the city. 2. Installation of approved backflow prevention devices, as determined by the city, on all potable, and/or other water meter connections. 3. Removal of any/all special recycled water quick couplers. The user shall be responsible for replacement with quick couplers approved for potable water systems. 4. Notification to all on-site personnel involved. 5. Removal of all warning labels/signs. 6. Installation of any/all potable water facilities and payment of any associated capacity fees, as established in Chapter 13.12 of the city's Municipal Code. 7. System flushing, disinfecting, decontamination, and water quality analyses, as required by the city and/or other regulatory agencies.

( Ord. 1839 § 1, 2009 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.