For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.37.040 — Approvals

Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Zoning Code § 17.37.040

Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/7fc2ce0c-0a49-4f7e-9013-8984c5e592ff

§ 17.37.040: Approvals.

The following approvals apply to ADUs and JADUs under this chapter: A. Building Permit Only. If an ADU or JADU complies with each of the general requirements in Section 17.37.050 below, it is allowed with only a building permit in the following scenarios: 1. Converted on Single-Family Lot. Only one ADU as described in subsection A.1 and one JADU on a lot with a proposed or existing single-family dwelling on it, where the ADU or JADU: a. Is either: within the space of a proposed single-family dwelling; within the existing space of an existing single-family dwelling; or (in the case of an ADU only) within the existing space of an accessory structure, plus up to 150 additional square feet if the expansion is limited to accommodating ingress and egress; and b. Has exterior access that is independent of that for the single-family dwelling; and c. Has side and rear setbacks sufficient for fire and safety, as dictated by applicable building and fire codes; and d. The JADU complies with the requirements of Government Code Sections 66333 through 66339. 2. Limited Detached on Single-Family Lot. One detached, new-construction ADU on a lot with a proposed or existing single-family dwelling (in addition to any JADU that might otherwise be established on the lot under subsection A.1 above), if the detached ADU satisfies the following limitations: a. The side-and rear-yard setbacks are at least four feet. b. The total floor area is 800 square feet or smaller. c. The peak height above grade does not exceed the applicable height limit in Section 17.37.050B below. 3. Converted on Multifamily Lot. One or more ADUs within portions of existing multifamily dwelling structures that are not used as livable space, including, but not limited to, storage rooms, boiler rooms, passageways, attics, basements, or garages, if each converted ADU complies with State building standards for a dwelling. Under this subsection A.3 at least one converted ADU is allowed within an existing multifamily dwelling, up to a quantity equal to 25% of the existing multifamily dwelling units. 4. Limited Detached on Multifamily Lot. No more than two detached ADUs on a lot with a proposed multifamily dwelling, or up to eight detached ADUs on a lot with an existing multifamily dwelling, if each detached ADU satisfies the following: a. The side- and rear-yard setbacks are at least four feet. If the existing multifamily dwelling has a rear or side setback of less than four feet, the city will not require any modification to the multifamily dwelling as a condition of approving the ADU. b. The peak height above grade does not exceed the applicable height limit provided in Section 17.37.050B below. c. If the lot has an existing multifamily dwelling, the quantity of detached ADUs shall not exceed the number of multifamily dwelling units on the lot. B. ADU Permit. 1. Except as allowed under subsection A above, no ADU may be created without a building permit and an ADU permit in compliance with the standards set forth in Sections 17.37.050 and 17.37.060 below. 2. The City may charge a fee to reimburse it for costs incurred in processing ADU permits, including the costs of adopting or amending the City's ADU ordinance. The ADU permit processing fee is determined by the Development Services Department and approved by the City Council by resolution. C. Process and Timing. 1. An ADU permit is considered and approved ministerially, without discretionary review or a hearing. 2. The City must approve or deny an application to create an ADU or JADU within 60 days from the date that the City receives a completed application. If the City has not approved or denied the completed application within 60 days, the application is deemed approved unless either: a. The applicant requests a delay, in which case the 60-day time period is tolled for the period of the requested delay; or b. When an application to create an ADU or JADU is submitted with a permit application to create a new single-family or multifamily dwelling on the lot, the City may delay acting on the permit application for the ADU or JADU until the City acts on the permit application to create the new single-family or multifamily dwelling, but the application to create the ADU or JADU will still be considered ministerial without discretionary review or a hearing. 3. If the City denies an application to create an ADU or JADU, the City must provide the applicant with comments that include, among other things, a list of all the defective or deficient items and a description of how the application may be remedied by the applicant. Notice of the denial and corresponding comments must be provided to the applicant within the 60-day time period established by subsection C.2 above. 4. A demolition permit for a detached garage that is to be replaced with an ADU is reviewed with the application for the ADU and issued at the same time.

( Ord. 1948 § 4, 2021 ; Ord. 1975 § 3, 2023 ; Ord. 1979 § 4, 2023 ; Ord. 1993 , 4/14/2025 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.