For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.37.050 — General ADU and JADU Requirements

Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Zoning Code § 17.37.050

Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/10ac31a8-16ec-4f60-b3ff-78e488b7ea48

§ 17.37.050: General ADU and JADU Requirements.

The following requirements apply to all ADUs and JADUs that are approved under Section 17.37.040A or B above: A. Zoning. 1. An ADU subject only to a building permit under Section 17.37.040A above may be created on a lot in a residential or mixed-use zone. 2. An ADU subject to an ADU permit under Section 17.37.040B above may be created on a lot that is zoned to allow single-family dwelling residential use or multifamily dwelling residential use. 3. In accordance with Government Code Section 66333(a), a JADU may only be created on a lot zoned for single-family residences. B. Height. 1. Except as otherwise provided by subsections B.2 and B.3 below, a detached ADU created on a lot with an existing or proposed single-family or multifamily dwelling unit may not exceed 16 feet in height. 2. A detached ADU may be up to 18 feet in height if it is created on a lot with an existing or proposed single-family or multifamily dwelling unit that is located within one-half mile walking distance of a major transit stop or a high quality transit corridor, as those terms are defined in Section 21155 of the Public Resources Code, and the ADU may be up to two additional feet in height (for a maximum of 20 feet) if necessary to accommodate a roof pitch on the ADU that is aligned with the roof pitch of the primary dwelling unit. 3. A detached ADU created on a lot with an existing or proposed multifamily dwelling that has more than one story above grade may not exceed 18 feet in height. 4. An ADU that is attached to the primary dwelling may not exceed 25 feet in height or the height limitation imposed by the underlying zone that applies to the primary dwelling, whichever is lower. Notwithstanding the foregoing, ADUs subject to this subsection B.4 may not exceed two stories. 5. For purposes of this subsection B, height is measured above existing legal grade to the peak of the structure. C. Fire Sprinklers. 1. Fire sprinklers are required in an ADU if sprinklers are required in the primary residence. 2. The construction of an ADU does not trigger a requirement for fire sprinklers to be installed in the primary dwelling. D. Rental Term. No ADU or JADU may be rented for a term that is shorter than 30 days. This prohibition applies regardless of when the ADU or JADU was created. E. No Separate Conveyance. An ADU or JADU may be rented, but, except as otherwise provided in Government Code Section 66341, no ADU or JADU may be sold or otherwise conveyed separately from the primary dwelling (in the case of a single-family lot) or from the lot and all of the dwellings (in the case of a multifamily lot). F. Septic System. If the ADU or JADU will connect to an on-site wastewater-treatment system, the owner must include with the application a percolation test completed within the last five years or, if the percolation test has been recertified, within the last 10 years. G. Owner Occupancy. 1. ADUs created under this section on or after January 1, 2020 are not subject to any owner-occupancy requirement. 2. As required by State law, all JADUs are subject to an owner-occupancy requirement. A natural person with legal or equitable title to the property must reside on the property, in either the primary dwelling or JADU, as the person's legal domicile and permanent residence. However, the owner-occupancy requirement in this subsection (G)(3) does not apply if the property is entirely owned by another government agency, land trust, or housing organization. H. Deed Restriction. Prior to issuance of a certificate of occupancy for an ADU or JADU, a deed restriction must be recorded against the title of the property in the County Recorder's office and a copy filed with the Development Services Department. The deed restriction must run with the land and bind all future owners. The form of the deed restriction will be provided by the City and must provide that: 1. Except as otherwise provided in Government Code Section 65852.26, the ADU or JADU may not be sold separately from the primary dwelling. 2. The ADU or JADU is restricted to the approved size and to other attributes allowed by this section. 3. The deed restriction runs with the land and may be enforced against future property owners. 4. The deed restriction may be removed if the owner eliminates the ADU or JADU, as evidenced by, for example, removal of the kitchen facilities. To remove the deed restriction, an owner may make a written request to the Director, providing evidence that the ADU or JADU has in fact been eliminated. The Director may then determine whether the evidence supports the claim that the ADU or JADU has been eliminated. Appeal may be taken from the Director's determination consistent with other provisions of this Code. If the ADU or JADU is not entirely physically removed, but is only eliminated by virtue of having a necessary component of an ADU or JADU removed, the remaining structure and improvements must otherwise comply with applicable provisions of this Code. 5. The deed restriction is enforceable by the Director or their designee for the benefit of the City. Failure of the property owner to comply with the deed restriction may result in legal action against the property owner, and the City is authorized to obtain any remedy available to it at law or equity, including, but not limited to, obtaining an injunction enjoining the use of the ADU or JADU in violation of the recorded restrictions or abatement of the illegal unit. I. Rent Reporting. In order to facilitate the City's obligation to identify adequate sites for housing in accordance with Government Code Sections 65583.1 and 66330, the following requirements shall be satisfied: 1. With the building permit application, the applicant shall provide the City with an estimate of the projected annualized rent that will be charged for the ADU or JADU. 2. Within 90 days after January 1st of each year following issuance of the building permit, the owner must report the actual rent charged for the ADU or JADU during the prior year. If the City does not receive the report within the 90-day period, the owner is in violation of this Code, and the City may send the owner a notice of violation and allow the owner another 30 days to submit the report. If the owner fails to submit the report within the 30-day period, the City may enforce this provision in accordance with applicable law. J. Building and Safety. 1. Must Comply with Building Code. Subject to subsection J.2 below, all ADUs and JADUs must comply with all local building code requirements. 2. No Change of Occupancy. Construction of an ADU does not constitute a Group R occupancy change under the local building code, as described in Section 310 of the California Building Code, unless the Building Official or Code Enforcement Division officer makes a written finding based on substantial evidence in the record that the construction of the ADU could have a specific, adverse impact on public health and safety. Nothing in this subsection J.2 prevents the City from changing the occupancy code of a space that was uninhabitable space or that was only permitted for nonresidential use and was subsequently converted for residential use in accordance with this section.

( Ord. 1948 § 4, 2021 ; Ord. 1975 § 3, 2023 ; Ord. 1979 § 4, 2023 ; Ord. 1993 , 4/14/2025 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.