For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.37.070 — Fees

Code of Ordinances, City of Upland, California (eCode360 UP5026 version 2025-09-22: Includes legislation through Ord. No. 2002 adopted September 22, 2025) · Upland Zoning Code § 17.37.070

Corpus is an independent public-information project, not the official City of Upland website. Stable reference: corpuslaw.us/code/5f91bcb4-c4a0-4d11-9626-f601f093ac88

§ 17.37.070: Fees.

The following requirements apply to all ADUs that are approved under Section 17.37.040A (Building Permit Only) and 17.37.040B (ADU Permit) above. A. Impact Fees. 1. No impact fee is required for an ADU that is less than 750 square feet in size. 2. Any impact fee that is required for an ADU that is 750 square feet or larger in size must be charged proportionately in relation to the square footage of the primary dwelling unit (e.g., the floor area of the ADU, divided by the floor area of the primary dwelling, times the typical fee amount charged for a new dwelling). 3. For purposes of this subsection A, "impact fee" means a "fee" under the Mitigation Fee Act (Government Code Section 66000(b)) and a fee under the Quimby Act (Government Code Section 66477). "Impact fee" here does not include any connection fee or capacity charge for water or sewer service. B. Utility Fees. 1. If an ADU is constructed with a new single-family home, a separate utility connection directly between the ADU and the utility and payment of the normal connection fee and capacity charge for a new dwelling are required. 2. Except as described in subsection B.1 of this section, converted ADUs on a single-family lot that are created under Section 17.37.040A.1 are not required to have a new or separate utility connection directly between the ADU and the utility. Nor is a connection fee or capacity charge required. 3. Except as described in subsection B.1, all ADUs that are not covered by subsection B.2 shall require a new, separate utility connection directly between the ADU and the utility and for any utility that is provided by the City. All utilities that are not provided by the City are subject to the connection and fee requirements of the utility provider. a. The connection is subject to a connection fee or capacity charge that is proportionate to the burden created by the ADU, based on either the floor area or the number of drainage-fixture-units (DFU) values, as defined by the Uniform Plumbing Code, upon the water or sewer system. b. The portion of the fee or charge that is charged by the City may not exceed the reasonable cost of providing this service.

( Ord. 1948 § 4, 2021 ; Ord. 1975 § 3, 2023 ; Ord. 1979 § 4, 2023 ; Ord. 1993 , 4/14/2025 )

Ask a question about Upland law

Corpus searches the Upland sections it holds and shows the ones that match, with their citations. Free, no sign-in.