15-03-080 - Submittal documents.
(A) Submittal documents. Submittal documents consisting of construction documents, statement of special inspections, geotechnical reports and other data shall be submitted in two or more sets with each permit application. The construction documents shall be prepared by a registered design professional where required by the State of Colorado regulations. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. EXCEPTION: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional, if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code. (1) Information on construction documents. Construction documents shall be dimensioned and drawn upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official. Construction documents shall be of sufficient clarity to indicate the location, nature, and extent of the work proposed, and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official. Where required by the building official, all braced wall lines shall be identified on the construction documents and all pertinent information including, but not limited to, bracing methods, location and length of braced wall panels, foundation requirements of braced wall panels at top and bottom shall be provided. Construction documents for buildings more than two stories in height shall indicate where penetrations will be made for electrical, plumbing, mechanical, fuel gas-piping systems or similar systems and the materials and methods for maintaining required structural safety, fire-resistance rating and fire-blocking. Details shall include, but are not limited to, as applicable, insulation materials and their R-values; fenestration U-factors and SHGCs; area-weighted U-factor and SHGC calculations; mechanical system design criteria; mechanical and service water heating system and equipment types, sizes and efficiencies; economizer description; equipment and system controls; fan motor horsepower (hp) and controls; duct sealing, duct and pipe insulation and location; lighting fixture schedule with wattage and control narrative; and air sealing details. (2) Manufacturer's installation instructions. Manufacturer's installation instructions, as required by this code, shall be available on the job site at the time of inspection. (3) Information for construction in flood hazard areas. For buildings and structures regulated by the IBC and IRC and located in whole or in part in flood hazard areas as established by IRC Table R301.2(1), construction documents shall include: a. Delineation of flood hazard areas, floodway boundaries, and flood zones, and the design flood elevation, as appropriate; b. The elevation of the proposed lowest floor, including basement, in areas of shallow flooding (AO zones), the height of the proposed lowest floor, including basement, above the highest adjacent grade; and c. The elevation of the bottom of the lowest horizontal structural member in coastal high-hazard areas (V zone); and d. If design flood elevations are not included on the community's flood insurance rate map (FIRM), the building official and the applicant shall obtain and reasonably utilize any design flood elevation and floodway data available from other sources. (4) Means of egress. The construction documents shall show in sufficient detail the location, construction, size, and character of all portions of the means of egress in compliance with the provisions of this code. In other than Group R-3 occupancies or buildings constructed under the International Residential Code, the construction documents shall designate the number of occupants to be accommodated on every floor and in all rooms and spaces. (5) Exterior wall envelope. Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane, and details around openings. The construction documents shall include manufacturer's installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system which was tested, where applicable, as well as the test procedure used. (6) The building's thermal envelope shall be represented on the construction drawings. (7) Location and size of the solar-ready zone, structural design loads and roof dead and live loads, and pathways for routing of conduit from the solar-ready zone to the electrical service panel. (8) Number and location of EVSE installed spaces, EV ready spaces, EV capable spaces, and EV capable light spaces. (9) Locations of conduit and termination points serving EVSE installed spaces, EV ready spaces, EV capable spaces, and EV capable light spaces. (10) Locations for condensate drainage where combustion equipment for space heating and water heating is installed. (B) Site plan. The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades, and the proposed finished grades, and, as applicable, flood-hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official is authorized to waive or modify the requirement for a site plan when the application for permit is for alteration or repair or when otherwise warranted. Where design flood elevations are not specified, they shall be established in accordance with IBC Section 1612.3.1 (C) Examination of documents. The building official shall examine or cause to be examined the accompanying submittal documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances. (1) Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp, as "Reviewed for Code Compliance." One set of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of work, and shall be open to inspection by the building official or a duly authorized representative. (2) Previous approvals. This code shall not require changes in the construction documents, construction, or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned. (3) Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted. (4) Design professional in responsible charge. a. General. When it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The building official shall be notified in writing by the owner if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. Where structural observation is required by IBC Section 1709, the statement of special inspections shall name the individual or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur (see also duties specified in IBC Section 1704). When plans, computations, and specifications are required by this section to be prepared or designed by an engineer or architect, such documents must bear the original signature and seal of the architect or engineer. Acceptable seals and signatures are original embossed or rubber-stamped seals with handwritten ink signatures. b. Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been approved by the building official. (D) Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. (E) Retention of construction documents. One set of approved construction documents shall be retained by the building official for a period of not less than 180 days from date of completion of the permitted work, or as required by state or local laws. One set of approved construction documents shall be returned to the applicant, and said set shall be kept on the site of the building or work at all times during which the work authorized thereby is in progress.
(Ord. 1858 §1, 2008; Ord. 1926 §6, 2011; Ord. 2042 §6, 2017; Ord. No. 2115, 2-25-20) (Ord. No. 2295, § 1, 2-24-26)
Ask a question about Broomfield law
Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.