§ 15-03-110 — Inspections and testing
Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 15-03-110
Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/37b01468-0d76-4dde-89e0-6e6afe51f548
15-03-110 - Inspections and testing.
(A) General. Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspec-tion purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. (B) Preliminary inspection. Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed. (C) Required inspections. The building official, upon notification, shall make the inspections set forth in subsections (1) through (16) below. (1) Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. The foundation inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. (2) Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories, and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks, and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site. Special inspections shall be in accordance with IBC Section 1802.2.2.4, as amended, and IRC Section R401.4.4, as amended. (3) Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in IBC Section 1612.5 and IRC Section R322 shall be submitted to the building official. (4) Plumbing, mechanical, gas, and electrical systems inspection. Rough inspection of plumbing, mechanical, gas, and electrical systems shall be made after the roof, framing, fireblocking and bracing are in place and all ducting and other components to be sealed are complete, prior to covering or concealment, before fixtures or appliances are set or installed, and prior to framing inspection. For single-family dwellings, all rough inspections shall be done at the same time as the rough framing inspection. EXCEPTION: Ground-source heat pump loop systems tested in accordance with IMC Section 1208.1.1 and IRC Section M2105.1 shall be permitted to be backfilled prior to inspection. The requirements of this section shall not be considered to prohibit the operation of any heating equipment or appliances installed to replace existing heating equipment or appliances serving an occupied portion of a structure, provided that a request for inspection of such heating equipment or appliances has been filed with the department not more than forty-eight hours after such replacement work is completed, and before any portion of such equipment or appliances is concealed by any permanent portion of the structure. (5) Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking, and bracing are in place and pipes, chimneys, and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes, and ducts are approved. For single-family dwellings, all rough inspections shall be done at the same time as the rough framing inspection. (6) Lath and gypsum board inspection. Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished. EXCEPTION: Gypsum board in buildings regulated by the IRC that is not part of a fire-resistance-rated assembly, shear assembly, garage/house separation or located in areas where there will be direct exposure to water or subject to continuous high humidity. (7) Fire-resistance-rated construction inspection. Where fire-resistance-rated construction is required between dwelling units, required per Chapter 7 of the IBC, or required due to location on property, the building official shall require an inspection of such construction after all lathing or wallboard is in place, but before any plaster is applied, or before wallboard joints and fasteners are taped and finished. (8) Fire-resistant and smoke resistant penetrations. Protection of joints and penetrations in fire-resistance-rated assemblies, smoke barriers, and smoke partitions shall not be concealed from view until annular space is inspected and approved; and subsequent approved firestopping is installed, inspected and approved. (9) Energy efficiency inspections. Inspections shall be made to determine compliance with the LECC as applicable and shall include, but not be limited to, inspections for: envelope insulation R- and U- values, fenestration U- value, duct system R-value, duct tightness, and HVAC and water-heating equipment efficiency. At the request of the code official, a letter or proof of intent to contract with an approved agency describing the air barrier inspection sequencing shall be provided to the code official prior to permit issuance and shall be signed by the building owner or the building owner's representative. The code official is authorized to accept reports of third-party inspection agencies not affiliated with the building design or construction, provided that such agencies are approved as to qualifications and reliability relevant to the building components and systems that they are inspecting or testing. When the code official authorizes the use of a third-party inspection agency for all or some aspects of compliance, the agency shall be authorized as a third-party extension of the authority having jurisdiction to verify compliance. The code official shall determine and communicate which compliance verification measures the third party inspection agency shall incorporate within their inspection processes. Third party energy rating companies are required to verify installed components match the original design as submitted and accepted by the city. If there are discrepancies they are required to notify the City Building Division. The approved agency shall submit inspection reports to the code official and to the owner's representative in accordance with International Building Code Section 1704.2.4. (10) Floodplain inspections. For construction in areas prone to flooding as established by Table R301.2(1), upon placement of the lowest floor, including basement, and prior to further vertical construction, the building official shall require submission of documentation, prepared and sealed by a registered design professional, of the elevation of the lowest floor, including basement, required in Section R322. (11) Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the department of building safety. (12) Special inspections. For special inspections, see IBC Section 1704 and 1705. (13) Final inspection. The final inspection shall be made after all work required by the building permit is completed. (14) Evaluation and follow-up inspection services. Prior to the approval of a prefabricated construction assembly (closed, prefabricated plumbing system for purposes of the IPC) having concealed work and the issuance of a permit, the code official shall require the submittal of an evaluation report on each prefabricated construction assembly, indicating the complete details of the installation, including a description of the system and its components, the basis upon which the system is being evaluated, test results, and similar information, and other data as necessary for the code official to determine conformance to this code. a. Evaluation service. The code official shall designate the evaluation service of an approved agency as the evaluation agency, and review such agency's evaluation report for adequacy and conformance to this code. b. Follow-up inspection. Except where ready access is provided to installations, service equipment and accessories for complete inspection at the site without disassembly or dismantling, the code official shall conduct the in-plant inspections as frequently as necessary to ensure conformance to the approved evaluation report or shall designate an independent, approved inspection agency to conduct such inspections. The inspection agency shall furnish the code official with the follow-up inspection manual and a report of inspections upon request, and the installation shall have an identifying label permanently affixed to the system indicating that factory inspections have been performed. c. Test and inspection records. Required test and inspection records shall be available to the code official at all times during the fabrication of the installation and the erection of the building; or such records as the code official designates shall be filed. (15) The owner of any elevator, dumbwaiter, escalator, or moving walk shall cause periodic inspection, tests, and maintenance to be made on such conveyances as required in the ASME elevator codes as adopted by chapter 15-18, B.M.C. (16) Service water, service sewer, and underdrain piping inspections. Inspections shall be made to determine that service water and sewer lines in yards comply with the Building Code and city standards and to determine that underdrain piping has been connected to the perimeter drain piping at house and at underdrain piping stub at property line. (D) Testing. Installations shall be tested as required in this code and in accordance with paragraphs (1) through (3) below. Tests shall be made by the permit holder and observed by the code official. (1) New, altered, extended or repaired systems. New installations and parts of existing systems, which have been altered, extended, renovated or repaired, shall be tested as prescribed herein to disclose leaks and defects. (2) Apparatus, material and labor for tests. Apparatus, material and labor required for testing a mechanical system or part thereof shall be furnished by the permit holder. (3) Reinspection and testing. Where any work or installation does not pass an initial test or inspection, the necessary corrections shall be made so as to achieve compliance with this code. The work or installation shall then be resubmitted to the code official for inspection and testing. (E) Temporary connection. The code official shall have the authority to authorize the temporary connection of an installation to the sources of energy for the purpose of testing the installation or for use under a temporary certificate of occupancy. (F) Special inspections. Special inspections of alternative engineered design plumbing systems shall be conducted in accordance with paragraphs (1) and (2) below. (1) Periodic inspection. The registered design professional or designated inspector shall periodically inspect and observe the alternative engineered design to determine that the installation is in accordance with the approved construction documents. All discrepancies shall be brought to the immediate attention of the plumbing contractor for correction. Records shall be kept of all inspections. (2) Written report. The registered design professional shall submit a final report in writing to the code official upon completion of the installation, certifying that the alternative engineered design conforms to the approved construction documents. A notice of approval for the plumbing system shall not be issued until a written certification has been submitted. (G) Operation of electrical equipment. The requirements of this section shall not be construed to prohibit the operation of any electrical system or equipment installed to replace existing equipment. The request for inspection of such equipment must have been filed with the building official not more than forty-eight hours after such replacement work is completed and before any portion of such electrical system is concealed by any permanent portion of the building. (H) Inspection agencies. The building official is authorized to accept reports of approved inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability. (I) Inspection requests. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. The building official may require that every request for inspection be filed at least one working day before such inspection is desired. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. (J) Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official. (K) Inspection record card. Work requiring a permit shall not be commenced until the permit holder or his or her agent shall have posted an inspection record card in a conspicuous place on the premises and in such position as to allow the building official conveniently to make the required entries thereon in such position by the permit holder until final approval has been granted by the building official. (L) Reinspections. A reinspection fee may be assessed for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. This section is not to be interpreted as requiring reinspection fees the first time a job is rejected for failure to comply with the requirements of this code, but as controlling the practice of calling for inspections before the job is ready for such inspection or reinspection. Reinspection fees may be assessed when the inspection record card is not posted or otherwise available on the work site, the approved plans and engineered roof truss sheets are not readily available to the inspector, the building is not dried in which includes installation of all windows, doors, roof paper along with roof vents and roof jacks, failure to have required pressure tests on plumbing and mechanical work, same set of corrections as for previous buildings by the same builder, for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the building official. To obtain a reinspection, the applicant shall pay the reinspection fee in accordance with Table 1-A. In instances where reinspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
(Ord. 1858 §1, 2008; Ord. 1926 §8, 2011; Ord. 1994 §6, 2014; Ord. No. 2115, 2-25-20; Ord. No. 2205, 3-7-23; Ord. No. 2295, § 1, 2-24-26)
Ask a question about Broomfield law
Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.