§ 15-03-120 — Certificate of occupancy
Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 15-03-120
Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/60de3c91-bb9b-44fc-8567-542fa135c299
15-03-120 - Certificate of occupancy.
(A) Use and occupancy. No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made, until the building official has issued a certificate of occupancy therefor, as provided herein. It shall be unlawful to operate any elevator, dumbwaiter, escalator, or moving walk without a current certificate of inspection issued by the State. Issuance of a certificate of occupancy or certificate of inspection shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. EXCEPTIONS: 1. Certificates of occupancy are not required for work exempt from permits under subsection 15-03-070(B) of this chapter. 2. Accessory buildings or structures. (B) Certificate issued. After the building official inspects the building or structure and finds no violations of the provisions of this code or other laws that are enforced by the department of building safety, the building official shall issue a certificate of occupancy that contains the following: (1) The building permit number. (2) The address of the structure. (3) The name and address of the owner. (4) A description of that portion of the structure for which the certificate is issued. (5) A statement that the described portion of the structure has been inspected for compliance with the requirements of this code for the occupancy and division of occupancy and the use for which the proposed occupancy is classified. (6) The name of the building official. (7) The edition of the code under which the permit was issued. (8) The use and occupancy, in accordance with the provisions of IBC Chapter 3, as applicable. (9) The type of construction as defined in Chapter 6 of the IBC, as applicable. (10) The design occupant load when applicable. (11) If an automatic sprinkler system is provided, whether the sprinkler system is required. (12) Any special stipulations and conditions of the building permit. (C) Temporary occupancy. The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The building official shall set a time period during which the temporary certificate of occupancy is valid. (D) Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of this code.
(Ord. 1858 §1, 2008; Ord. 1926 §9, 2011; Ord. 1994 §7, 2014; Ord. No. 2115, 2-25-20)
Ask a question about Broomfield law
Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
