§ 17-54-060 — Use by special review application submittal materials
Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 17-54-060
Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/77eca610-9a49-4732-8b20-64d423e29859
17-54-060 - Use by special review application submittal materials.
Unless a submittal requirement is waived or modified by the city after the Applicant's request, the Applicant must submit the information and documents specified in this section with the use by special review application. The contents and relevant information in any required submittal must be based on the most current information available to the Applicant as of the date of the submittal of the application. If the contents or relevant information in any required submittal materially changes, Operator must update submittal materials within thirty days. All plans required to be submitted by this section must demonstrate compliance with the criteria in section 17-54-070, B.M.C. and any other applicable B.M.C. code provisions. Operator must update its use permitted by special review application if any rules or standards contained in any submittal required by this section become more stringent. All applications for use permitted by special review are subject to review and approval by the city and city council pursuant to chapter 17-54-050, B.M.C and, unless waived, must contain the following: (A) The operator's and surface owner's names and addresses, and designation of agent, if applicable. (B) Verification of legal rights, Property Rights, Permits and Other Approvals. Description, and supporting documentation upon request, of property rights, mineral rights, leases, easements, and rights-of-way agreements that are necessary for, or that will be affected by, the proposed Operation. (C) A list of all permits or approvals obtained or to be obtained from local, state, or federal agencies. (D) A detailed site plan for all facilities that includes a depiction of all visible improvements within 500 feet of the proposed location, to include buildings/residences, public roads and trails, major above-ground utilities, gathering lines and pipelines, railroads, mines, oil/gas/injection/water/plugged wells, etc. as required by the site plan requirements of 17-38, Section III, B.M.C., as amended. Information on gathering lines and pipelines shall include the age, size, pressure in the line, depth of bury, substance transported and location of any pig launchers. (E) A summary of planned operations, including identified access points and operational timeline for posting to a local community information webpage. (F) A plan for site preparation, mobilization and demobilization that covers all phases of operation. (G) A plan for interim reclamation and revegetation of the well pad and final reclamation of the well pad. (H) The vicinity maps for a facility submitted with an application for a use permitted by special review shall be submitted on one or more plats or maps showing the following information: (1) Location of all existing water bodies and watercourses, including direction of water flow. This information shall be submitted on USGS 7.5-minute series or assessor base maps which indicate topographic detail and show all existing water bodies and watercourses with a physically defined channel within a one-half mile radius of the proposed well or facility. (2) Location of existing oil and gas wells or injection wells as reflected in COGCC records. This information shall be submitted on a map and shall include any and all wells within a 1,000-foot radius of the proposed location for the well. (3) Location of drill site. The information to be submitted shall be on Commission Form 2 or include the information required to be submitted with a Form 2 and shall include the parcel tax identification number. (4) Location of gathering lines, off-location flowlines and crude oil transfer lines (I) Project schedules for all phases, including site construction, flowlines and pipeline construction, drilling, completions (broken down into activity-based components), commissioning, operations, abandonment and reclamation. (J) Administrative fees. (K) Information demonstrating that the operator is capable of fulfilling and is likely to fulfill the obligations imposed by this section and the Oil and Gas Conservation Act, including: (1) A certified list of all instances within the past ten years where the COGCC, other state or federal agency, city, or county found that the operator has not complied with applicable federal, state or local requirements with respect to drilling, operation, or decommissioning of a well or operation of oil and gas facility or pipeline. The list shall identify the date of the determination, the entity or agency making the determination, the nature of the non-compliance, and, if applicable, the final resolution of the issue and procedural or policy changes that were implemented to prevent future infractions and which adequately demonstrate effectiveness. If no such instances of non-compliance exist, the operator shall certify to that effect. (2) A list of all near-misses and incidents within the past ten years that occurred at facilities owned or operated by operator, an operator's legacy companies, or a subsidiary of operator, including events involving contractors. Operator shall also list any root causes analysis conducted and corrective actions taken in response to the near-misses and incidents, including internal changes to corporate practices or procedures, such as modifications to safety management plans. (L) Protocol, subject to city approval, to conduct noise modeling for each facility for pre-construction and drilling, completion and production operations. Noise modeling shall be conducted by third-party consultant approved by the city. Operator shall pay for such modeling. (M) Noise impact mitigation plan that demonstrates compliance with the standards of chapter 9-36, B.M.C. (N) A plan for light and dust mitigation. (O) Protocol, subject to city approval, for air modeling plan to be conducted by third-party consultant approved by the city. Protocol must include facility emissions inventories for all GHG emissions, criteria pollutants and hazardous air pollutant standards and air quality impact studies for drilling, completions and production operations based upon proposed equipment use, and operation phases, and any emissions reductions associated with plugging and abandonment. In addition, a protocol must include emissions associated with truck traffic for drilling, completions, production and plugging and abandonment operations. Air modeling shall demonstrate that: (1) Emissions from the proposed facilities and associated truck traffic shall not cause or contribute to exceedances of the National Ambient Air Quality Standards; (2) Emissions from the proposed facilities comply with federal air quality and odor rules, including EPA's New Source Performance Standards and National Emission Standards for Hazardous Pollutants; (3) Emissions from the proposed facilities comply with COGCC and CDPHE air quality and odor rules; (4) Emissions from the proposed facilities comply with city emission control regulations; (5) Emissions will be below the most protective health-based guidelines, including those used by CDPHE, EPA, California, or others. (P) Protocol, subject to city approval, for air monitoring plan to be conducted by a qualified third-party consultant approved by the city. Air monitoring plan shall describe how the operator will conduct baseline monitoring within 500 feet and at select nearby receptors of a proposed facility prior to construction and during all phases of development, including drilling, completion and production. The plan shall include monitoring for all potential emissions, including but not limited to, VOCs, Hazardous Air Pollutants (HAPs), BTEX, Hydrogen Sulfide, Oxides of Nitrogen (NOx), Particulate Matter (PM), Fine Particulate Matter (PM 2.5), Carbon Monoxide (CO) and methane (CH4), carbon dioxide (CO2). Operator shall pay for the baseline and ongoing monitoring. (Q) An air quality mitigation plan. (R) An odor mitigation plan that demonstrates how operator will minimize odors, including chemical odors, from its operations and comply with Colorado Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emissions, 5 CCR 1001-4, Regulation No. 3, 5 CCR 1001-5, requirements of this chapter, and any other applicable regulations. The plan shall also provide a plan for timely responding to odor complaints, including chemical odors, from the community and for identifying and implementing additional odor control measures to control odors emanating from the oil and gas facility. (S) Electrification plan. A plan identifying all sources of electricity that will be brought to or used at the facility during all phases of development and operations. (T) Emergency preparedness and response. Oil and gas operations shall avoid risks of emergency situations such as explosions, fires, gas, oil or water pipeline leaks, ruptures, hydrogen sulfide or other toxic gas or fluid emissions, and hazardous material vehicle accidents or spills. Oil and gas operations shall ensure that, in the event of an emergency, adequate practices, procedures, and infrastructure are in place to protect public health and safety and repair damage caused by emergencies. Each applicant with a facility in the city is required to complete the Front Range Emergency Resource Co-op template. In addition, each operator shall submit an emergency preparedness and response plan that shall be approved and signed off of by the city and North Metro Fire Rescue District (NMFRD) in order to be deemed complete and this plan shall be updated on an annual basis, after an incident occurs, or when changes are made to facility operations, personnel, or other content covered in the plans. The plan shall demonstrate compliance with the following: (1) Adequate provisions to ensure operator will cover all costs associated with ongoing training of employees and first responders, response and remediation, including any additional on-site and regional specialized equipment and supplies necessary to respond to any emergency incident at its facilities. (2) Operator shall cooperate and train with Broomfield and NMFRD emergency responders as requested. (3) Operator shall participate in training, drills, and exercises and development of the after-action report. (4) Operator shall immediately notify Broomfield, surrounding communities, and any nearby schools, hospitals, and long-term care facilities of an emergency event and develop emergency protocols with the NMFRD, Broomfield's Department of Public Health and Environment, and the Broomfield Police Department. (5) Operator shall provide to Broomfield safety and security protocols for the facility site. (6) Operator shall provide a copy of any spill prevention, control, and countermeasures (SPCC) plan to Broomfield if required by USEPA rules and a copy of a listing of hazardous chemicals used on site if required by USEPA CERCLA Community Right to Know rules. (7) A list of all hazardous chemicals used on site sorted by operational phase (construction, drilling, completion and production) and the SDS sheets if required by USEPA and CERCLA Community Right to Know rules. (8) Operator shall maintain onsite storage of aqueous film forming foam (which shall not contain PFAS), absorption boom and granulated materials for ready deployment in case of leaks or other emergencies. Operator shall notify first responders of the location of said materials. (9) Operator shall identify and provide twenty-four-hour contact information for contractors and subcontractors. (10) Operator shall coordinate with the NMFRD regarding evacuation routes. Evacuation routes will include any schools, hospitals, and long-term care facilities that are within proximity to the oil and gas facility, based on guidance from the NMFRD. (11) Fire hydrant exists within 1,000 feet from oil and gas facility. If no fire hydrant connected to the city's water system or alternative approved of by the city exists within 1,000 feet from facility, Operator shall install fire hydrant at its own cost, or reimburse the city for the cost of installing a fire hydrant. (U) A weed control plan that demonstrates compliance with Chapter 8-08 B.M.C., or as otherwise directed by the city. Weeds shall not be higher than twelve inches. (V) A traffic study and management plan. Operator shall submit a reasonable and adequate bond to cover any damage to public infrastructure during all operations, including construction, drilling, completions and production. Operator and subcontractors shall comply with Broomfield and other jurisdictions' requirements related to traffic restrictions. Operator shall conduct a baseline report of the conditions of the roads to be used by the operator and the remaining road life for the proposed truck routes. Haul and access roads must be designed per city and county standards. Prior to the start of construction, operator shall complete a traffic study and provide a detailed traffic plan to determine any operational changes and geometric modifications necessary for extraction activities. This will include, but is not limited to: (1) Detail of access locations for each facility including sight distance, turning radius of vehicles and a template indicating feasibility, turning volumes in and out of each site for an average day and what to expect during the peak hour. (2) Estimated weights of vehicles when loaded, a description of the vehicles, including the number of wheels and axles of such vehicles and trips per day. (3) Anticipated truck traffic volumes will be converted to equivalent single axle loads and compared with existing volumes. (4) Core drilling or boring samples of city roads will be used to determine the adequacy of the existing roadway structure and determine if the roadway section is adequate for extraction activities. (5) Truck routing map and truck turning radius templates will be used to determine if improvements are necessary at intersections along the route. (6) Identification of the need for any additional traffic lanes. (7) Restriction of Class 7 vehicles or higher from facilities to periods outside of peak am and pm traffic periods (generally 7-9 a.m. and 3-6 p.m. during weekdays or in other specific instances as determined by the traffic engineer.). (8) Require a traffic study to determine impacts to city streets. (9) Restriction of idling or parking on shoulders of roads. (10) Periodic training of employees and subcontractors on traffic safety and traffic requirements. (W) Landscaping and visual mitigation plan. A preliminary visual mitigation plan in compliance with applicable COGCC rules, including but not limited to a list of the proposed colors for the Facilities, regardless of construction date, which are observable from any public highway, providing for paint that is uniform, noncontrasting, nonreflective color tones (similar to the Munsell Soil Color Coding System), and with colors matched to but slightly darker than the surrounding landscape and a listing of the operations' equipment. Plan shall indicate the location of all outdoor lighting on the site and any structures and include cut sheets of all proposed fixtures. Operator shall provide photometric study approved by city prior to start of construction to indicate impact on surrounding properties and measure the lumens emitted from the facility outside of the walls. Plan shall also demonstrate that visual mitigation measures allow for adequate ventilation. (X) Fencing and screening mitigation plan. A plan detailing how the Operator will screen or fence the proposed facility in order to mitigate visual impacts, protect wildlife and prevent unauthorized persons from entering the facility. (Y) Water supply plan. Applicant shall submit estimated water supply requirements for all phases of operation of the oil and gas facility and usage for the proposed development including: (1) A demonstration that the available water supply is the least detrimental to the environment among the available sources and adequate to meet the needs of the development. Approval may be conditioned upon sufficient proof of adequate water supply. A list of all available physical sources of water for the project, and if multiple sources are available, analysis of which source is least detrimental to the environment; (2) A description of the physical source of water that the applicant proposes to use to serve the oil and gas facility; (3) Water conservation measures, if any, that may be implemented within the oil and gas facility, including any plans for recycling water or treating it to a standard suitable for non-potable uses; and (4) An estimate of the amount of water that will be used at the site, where and how the water will be consumed, the amount of wastewater produced, and disposal plans for wastewater. (5) Impacts of Water Use. An independent expert's assessment of the impacts of the proposed use of water described in subsections (1) through (4) above. Impacts to, at a minimum, downstream users, groundwater users, agricultural lands and users, terrestrial and aquatic wildlife, plant communities, and recreation must be considered. (6) Use of city water is prohibited. (Z) A water quality control plan that establishes that all facilities shall use most effective performance techniques and best management practices to minimize impacts to water quality, including plans for water quality testing, prevention of illicit or inadvertent discharges, and containment of pollutants as required by Broomfield code and state and federal laws and regulations. Plan shall include details such as operator's plans for water quality testing, prevention of illicit or inadvertent discharges, stormwater discharge management, containment of pollutants, and spill notification and response as required by federal and state agencies. The owner or operator shall provide the city with the information it provides to the COGCC ensuring compliance with the water quality protection standards contained in applicable COGCC rules governing water quality protection. The owner or operator shall provide its plans concerning downhole construction details and installation practices, including casing and cementing design, and shall inform the city how the plans establish that the facility does not create significant degradation to surface waters or drinking water aquifers. (AA) Grading, drainage, and erosion control plan. (BB) Stormwater management plan that identifies possible pollutant sources that may contribute pollutants to stormwater, best management practices (BMPs), sampling procedures (if required), and inspections that, when implemented, will reduce or eliminate any possible water quality impacts. (CC) Risk analysis and risk management plan that meets all requirements set forth in this chapter. (DD) Abandoned wells plan, if required, that provides a list of wells to be plugged and abandoned and the timeframe for doing so. (EE) Wetlands protection plan. (FF) Hazardous materials management plan that identifies hazardous materials that will be used or stored at the facility or site, (including those disclosed through the "Frac Focus" process), the physical hazards they present, the quantity on hand (daily and maximum), the storage method and location, and any other pertinent information that is of value to employees exposed to the materials and/or first responders in the event of an accident or incident. Operator shall provide copies of all Safety Data Sheets to the city prior to each phase of operation. (GG) Waste management plan that identifies waste types and associated hazards, the approximate quantities, storage method(s), transportation and management method(s), communication and training of employees, identification of individuals responsible for waste management by facility or site, spill and release prevention methods, emergency management strategies (including spill containment), and inspection types and frequencies. Operator shall recycle drilling, completion, flowback and produced fluids unless technically infeasible. Waste may be stored temporarily in tanks and shall be transported by pipelines and disposed of at licensed disposal or recycling sites. No disposal of wastewater within the city. (HH) Historical and cultural resources plan. Operator to assess historical and cultural resources in and around the proposed oil and gas facility and share such information and proposed mitigation measures with Broomfield for advance approval prior to start of site construction. If a significant surface or sub-surface archeological site is discovered during construction, the operator shall be responsible for immediately contacting the city to report the discovery. If any disturbance of a site deemed by the State Historic Preservation Office to be a historical or cultural resource occurs, the operator shall be responsible for mitigating the disturbance to the cultural or historical property through a data recovery plan in consultation with the city's historic landmark board and the State Historic Preservation Office. (II) Financial assurance. Operator shall provide any financial assurance documents required by the city. (JJ) Environmental assessment. Operator shall provide an environmental impact assessment of the proposed oil and gas facility completed by a qualified third-party, prior to any construction on the site that includes but is not limited to the following: (1) At least one on-site evaluation within one month of the submittal to the city. (2) A map and photographs of the site. (3) Identification and assessment of potential impacts to the environment and wildlife including wetlands; floodplain; ponds; creeks, streams and drainageways; migratory birds and raptors; ground nesting birds; prairie dogs; burrowing owls; state and federal threatened and endangered species for both flora and fauna; any other applicable wildlife issues including den sites for mammals, like coyotes and foxes; fish and other aquatic life; wildlife corridors; significant habitat; natural landmarks and prominent natural features such as distinctive rocks and land forms; vegetation including grasses, shrubs and trees; and visual or scenic resources. (4) Confirmation that the proposed project shall comply with the city's policies for prairie dog conservation and management. (5) Identification of proposed project design measures or other relevant mitigation measures to avoid unacceptable impacts or to reduce impacts to levels of insignificance. (6) Prior to construction, operator shall submit a 20-Day Environmental Clearance Letter confirming that any environmental and wildlife conditions identified in the environmental assessment have been mitigated and addressed. (KK) Cumulative impacts analysis that contains all information required to be submitted to the COGCC in Form 2B and provides quantitative and qualitative data to evaluate incremental adverse and beneficial contributions to cumulative impacts associated with the proposed facility including any measures the Operator will take to avoid, minimize, or mitigate any adverse impacts. Operator must analyze all impacts required to be analyzed. (LL) Flowline Management Plan that includes: (1) Description of how the Operator intends to adhere to the integrity management procedures listed in COGCC Rule 1104.c-f. (2) A copy of the leak protection and monitoring plan required by COGCC Rule 1104.g, as applicable. (3) A map at a scale of one inch equals 250 feet (1" = 250') or such scale as required by COGCC showing the location of all existing and proposed flowlines associated with the Oil and Gas Operation. For each existing and proposed flowline, the map shall denote its size and the maximum pressure at which it is or will be operated; its depth from the surface; and, if existing, whether it was constructed or installed before October 31, 2017 and whether it is in use, abandoned, or shut-in. (4) Description of the measures planned to minimize land disturbance and impacts to vegetation. (MM) Operator shall provide copies of all site-specific plans COGCC requires Operator submit with a Form 2A once the Operator submits the Form 2A to COGCC. (NN) For shut-in wells: (1) Description of how the Operator intends to adhere to the integrity management procedures listed in COGCC Rule 1104.c-f. (2) A copy of the leak protection and monitoring plan required by COGCC Rule 1104.g, as applicable. (3) A map at a scale of one inch equals 250 feet (1" = 250') or such scale as required by COGCC showing the location of all existing and proposed flowlines associated with the Oil and Gas Operation. For each existing and proposed flowline, the map shall denote its size and the maximum pressure at which it is or will be operated; its depth from the surface; and, if existing, whether it was constructed or installed before October 31, 2017 and whether it is in use, abandoned, or shut-in. (4) Description of the measures planned to minimize land disturbance and impacts to vegetation. (OO) For abandoned and temporarily abandoned wells: (1) A map at a scale designated by the city showing the location, including GPS location, of abandoned and temporarily abandoned wells. (2) Copy of the most recent mechanical integrity test report submitted to COGCC for each temporarily abandoned well. (3) Copy of Form 6 Notice of Intent to Abandon submitted to COGCC. (4) Quarterly inspections of temporarily abandoned and shut-in wells for surface impacts. (PP) Wellbore Risk analysis. A copy of the anti-collision evaluation [Well integrity report] for all proposed wells conducted for or under the same terms as required in COGCC Rules. (QQ) Worker training and records. All workers at oil and gas facilities and involved with oil and gas operations shall have any applicable nationally recognized certifications and training for the work they are performing. This includes, but is not limited to, Hazard Communications Training, Hazardous Waste Operations Certifications, heavy equipment operator training, occupational safety and health training, etc. (RR) Additional information. If the city and county manager determines that the city needs additional information, including underlying data, analysis, modeling, or reports or other documentation to determine whether the proposed oil and gas facility meets the criteria in chapter 17-54-070 B.M.C., the city and county manager may require the applicant to submit such information.
(Ord. No. 2144, § 1, 5-11-21)