For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-54-090 — Conditions of approval applicable to use by special review applications

Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 17-54-090

Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/6a386be7-4223-439d-a900-ba36af5a8f56

17-54-090 - Conditions of approval applicable to use by special review applications.

The following oil and gas facility operational requirements and mitigation measures are likely necessary to meet the approval criteria in section 17-54-070. Accordingly, unless the city council deems a condition unnecessary to establish compliance with this section, all of the following shall apply to all oil and gas facilities in the form of conditions of approval applicable to each use by special review permit: (A) Color. Facilities shall be painted in a uniform, non-reflective color that blends with the surrounding landscape. (B) Anchoring. Anchoring is required within floodplains or geological hazard areas, as needed to resist flotation, collapse, lateral movement, sinking, or subsidence, and in compliance with Federal Emergency Management Agency (FEMA). All guy line anchors left buried for future use shall be identified by a marker of bright color not less than four feet in height and not greater than one foot east of the guy line anchor. (C) Burning. No open burning of trash, debris or other flammable materials. (D) Chains. Traction chains shall be removed from heavy equipment on city streets. (E) Discharge valves. Discharge valves shall be secured, inaccessible to the public and located within the secondary containment area. Open-ended discharge valves shall be placed within the interior secondary containment for storage tanks. (F) Dust suppression and fugitive dust. Dust associated with on-site activities and traffic on access roads shall be minimized throughout construction, drilling and operational activities such that there are no visible dust emissions from access roads or the site to the extent possible given wind conditions. No untreated produced water or other process fluids shall be used for dust suppression. The operator will avoid creating dust or dust suppression activities within 300 feet of the ordinary high-water mark of any water body, unless the dust suppressant is water. Sand, silica and similar materials must be properly stored to prevent fugitive particulates. Measures shall be used to control particulates, including proof of compliance with State-required dust control measures and imposition of an opacity requirement as tested using EPA Method 9. Safety Data Sheets (SDS) for any chemical-based dust suppressant shall be submitted to the city prior to use. (G) Emergency preparedness and response plan. The applicant shall implement the emergency preparedness and response plan approved by the city and county manager and city council. The plan shall be updated annually, or as conditions change, such as responsible field personnel and ownership or as a result of an incident. (H) Exhaust. All exhaust, including but not limited to, exhaust from all engines, motors, coolers and other equipment shall be vented up or in a direction away from the nearest occupied building. (I) Air quality. (1) Flares and combustion devices. Flaring shall be eliminated other than during emergencies or upset conditions. Operator must notify city in advance of any flaring. All flaring shall be reported to the city. To the extent used, all flares, thermal oxidizers, or combustion devices shall be designed and operated as follows: a. Any flaring that is done shall be done with a flare that has a manufacturer specification of 98% destruction removal efficiency or better; b. The flare and/or combustor shall be fired with natural gas; c. The flare and/or combustor shall be designed and operated in a manner that will ensure no visible emissions during normal operation. Visible emissions means observations of smoke for any period or periods of duration greater than or equal to one minute in any fifteen-minute period during normal operation, pursuant to EPA Method 22. Visible emissions do not include radiant energy or water vapor; d. The flare and or combustor shall be operated with a flame present at all times when emissions may be vented to it; e. All combustion devices shall be equipped with an operating auto-igniter; f. If using a pilot flame ignition system, the presence of a pilot flame shall be monitored using a thermocouple or other equivalent device to detect the presence of a flame. A pilot flame shall be maintained at all times in the flare's pilot light burner. A telemetry system shall be in place to monitor the pilot flame and shall activate a visible and audible alarm in the case that the pilot goes out; g. If using an electric arc ignition system, the arcing of the electric arc ignition system shall pulse continually and a device shall be installed and used to continuously monitor the electric arc ignition system; h. Any flare, auto ignition system, recorder, vapor recovery device or other equipment used to meet the hydrocarbon destruction or control efficiency requirement shall be installed, calibrated, operated, and maintained in accordance with the manufacturer's recommendations, instructions, and operating manuals. (2) Leak and detection and repair (LDAR). Operator shall develop and maintain a leak detection and repair program using AQCC approved instrument monitoring methods or alternative approved instrument monitoring methods. Inspections must occur at least monthly. More frequent inspections may be required based on the design, size and location of the facility. If an infrared (IR) camera is used, operator shall retain an infrared image or video of all leaking components before and after repair. Such records shall be maintained for two years and shall be made available to the city upon request. Any leaks discovered by operator, including any verified leaks that are reported to the operator by a member of the public, shall be reported to the city immediately upon discovery. Operator shall repair leaks within forty-eight hours. If the city determines that the leak presents an imminent threat to persons or property, the operator may not operate the affected component, equipment or flowline segment until the operator has corrected the problem and the city agrees that the affected component, equipment or flowline segment no longer poses a hazard to persons or property. In the event of leaks that the city believes do not pose an imminent threat to persons or property, if more than forty-eight-hours repair time is needed after a leak is discovered, operator shall contact the city and county manager and provide an explanation of why more time is required. At least once per year the operator shall notify the city five business days prior to an LDAR inspection of its facilities to provide the city the opportunity to observe the inspection. (3) Continuous monitoring to detect leaks or measure hydrocarbon emissions and monitor meteorological data shall be required. City may require operator to install and operate its own continuous monitoring system or may require operator to reimburse the city for costs associated with conducting its own continuous monitoring. Any continuous monitoring system shall be able to alert the operator of increases in air contaminant concentrations. (4) Emission control regulations and air protection requirements. To the extent used, all equipment shall comply with the following: a. Electrification from the power grid or from renewable sources of all permanent operation equipment that can be electrified; b. Dry seals on centrifugal compressors; c. Routing of emissions from rod-packing and other components on reciprocating compressors to vapor collection systems; d. Emission controls of hydrocarbon emissions of 98% or better for centrifugal compressors and reciprocating compressors; e. Best management practices during liquids unloading activities including the installation of artificial lift, automated plunger lifts and flares capable of a 98% destruction removal efficiency for hydrocarbon emissions to control any venting. If manual unloading is permitted, operator shall remain onsite during any manual unloading; f. Reduction or elimination of venting during oil and gas maintenance activities such as blowdowns. If it is not feasible to capture or combust emissions during any maintenance activity, including from a well tank, compressor, or flowline the operator shall provide forty-eight hour advance written notice to the city of such proposed venting. Such notice shall identify the duration and nature of the venting event, a description as to why venting is necessary, a description of what vapors will likely be vented, what steps will be taken to limit the duration of venting, and what steps the operator proposes to undertake to minimize similar events in the future. If emergency venting is required, or if accidental venting occurs, the operator shall provide notice to the city of such event as soon as, but in no event longer than, twenty-four hours from the time of the event, with the information listed above and with an explanation as to the cause and how the event will be avoided in the future; g. 98% control of emissions from pigging operations; h. Telemetric control and monitoring systems, including surveillance monitors to detect when pilot lights on control devices are extinguished; i. Operator agrees to participate in Natural Gas STAR program or other voluntary programs to encourage innovation in pollution control at facilities; j. Proof of compliance with state-required dust control measures and imposition of an opacity requirement as tested using EPA Method 9; k. Monitoring as needed to respond to emergency events such as process upsets or accidental releases; l. Operator shall implement emission reduction measures to respond to air quality action day advisories posted by the Colorado Department of Public Health and Environment for the Front Range Area, including minimizing vehicle and engine idling; reducing truck traffic and worker traffic; delaying vehicle refueling; suspending or delaying use of fossil fuel powered ancillary equipment; postponing construction activities; postponing maintenance activities. Within thirty days following the conclusion of each air quality action day, operator shall submit a report to the city that details which measures it implemented during that air quality action day; m. Shutdown protocols, approved by the city, with notification and inspection provisions to ensure safe shut-down and timely notification to local communities; n. Ongoing maintenance checks of all equipment to minimize the potential for gaseous or liquid leaks; o. Minimization of truck traffic to and from the site; p. No venting other than when necessary for safety. Operator must report any venting to the city within twenty-four hours; q. No venting or flaring of associated gas from hybrid gas-oil wells (i.e., gas that is co-produced from a well that primarily produces oil), unless during an emergency; r. Consolidation of product treatment and storage facilities within a facility; s. Centralization of compression facilities within a facility; t. EPA reduced emission completions for oil wells. Daily logs documenting reduced emission completions provided to the city; u. EPA reduced emission completions for gas wells. Daily logs documenting reduced emission completions provided to the city; v. Closed loop, pitless drilling, completions and production systems; w. Use of other best management practices as they become available; x. The use of no-bleed continuous and intermittent pneumatic devices. This requirement can be met by replacing natural gas with electricity or instrument air, or routing the discharge emissions to a closed loop-system or process; y. A root cause analysis for any Grade 1 gas leaks, as defined by COGCC; z. Automated tank monitoring and gauging as required by CDPHE; aa. Compliance with all CDPHE permits, if any, and compliance with all OSHA work practice requirements with respect to benzene. (5) The following may be required based on the size, nature and location of the facility: a. Implementation of tankless production techniques; b. The use of desiccant gas processing dehydrators or other zero emitting dehydrators; c. Use of a pressure-suitable separator and vapor recovery unit (VRU) where applicable; d. Pipeline infrastructure for fresh water shall be constructed and placed into service prior to spudding for delivery of all fresh water to be used during the drilling, completion, production and operations phases; e. Pipeline infrastructure for produced water, natural gas, crude oil and condensate will be constructed and placed into service prior to the start of any fluid flow from any wellbore; (6) Compliance. The operator shall submit annual reports to the city certifying (a) compliance with these air quality requirements and documenting any periods of material non-compliance, including the date and duration of each such deviation and a compliance plan and schedule to achieve compliance, and (b) that the equipment at the facility continues to operate within its design parameters, and if not, what steps will be taken to modify the equipment to enable the equipment to operate within its design parameters. The annual report shall contain a certification as to the truth, accuracy and completeness of the reports, signed by a responsible corporate official. The operator will also provide the city with a copy of any self-reporting submissions that operator provides to the CDPHE due to any incidence of non-compliance with any CDPHE air quality rules or regulations at the facility. (J) Lighting. During all phases of development and operation, operator shall adhere to best management practices to minimize light escaping the facility including making all lighting downward-facing and fully shielding bulbs to prevent light emissions above a horizontal plane drawn from the bottom of the fixture. In doing so, operator shall take topography and location of downhill structures into account in order to avoid shining light into downhill properties. If required by city, during the drilling and completion phases operator shall install a minimum thirty-two foot wall around well pads to reduce light escaping site. (K) Maintenance of machinery. Routine field maintenance of equipment involving hazardous materials within 300 feet of any water body is prohibited. All fueling shall occur over impervious material and shall not be done during storm events. Operator shall operate and maintain all equipment in accordance with manufacturer specifications. Regular maintenance checks are required for all equipment. (L) Noise. The Operator shall control noise levels as follows. (1) Operator must comply with chapter 9-36, B.M.C. or COGCC rules regulating noise, whichever are more stringent. (2) Beginning with construction and up to production, a third-party consultant approved by the city must conduct continuous noise monitoring in fifteen minute increments near well sites and maintain records for two years. All data shall be made available to the city on request. (3) For db(C) scale noise, Operator shall comply with the requirements of applicable COGCC rules or chapter 9-36, B.M.C. whichever is more stringent. (4) To ensure the Operator controls noise to the allowable levels set forth above, one or more of the following may be required based on the size, location and nature of the facility: a. Acoustically insulated housing or cover enclosing the motor or engine; b. Noise management plan identifying hours of maximum noise levels, type, frequency, and level of noise, and proposed mitigation measures; c. Obtain all power from utility line power or renewable sources; d. Utilize the most current equipment to minimize noise impact during drilling, completions, and all phases of operation including the use of "Quiet Fleet" noise mitigation measures for completions, electric drill rigs and tier 4 engines, or the most advanced technology available; e. Sound walls around well drilling and completion activities to mitigate noise impacts; f. Restrictions on the unloading of pipe or other tubular goods between 6:00 p.m. and 8:00 a.m.; g. Any abatement measures required by COGCC for high-density areas, if applicable. h. Use of quiet design mufflers (also referred to as hospital grade or dual dissipative) or equivalent. i. Industrial operations that cannot meet the standards of chapter 9-36 B.M.C., shall not operate from 10:00 p.m. to 7:00 a.m. (M) Reclamation. Operators will comply with the city's approved reclamation plan and the COGCC interim and final reclamation requirements. Seeding will take place when climate is conducive to seed germination. Final facility reclamation will ensure compatibility with neighboring land uses at the time of reclamation. (N) Removal of debris. All excess debris shall be removed during construction activities. Site shall remain free of debris and excess materials at all times during operations. No burning of debris permitted for any activity on facility, including, but not limited to, drilling, completion, recompletion, redrilling or plugging and abandoning. (O) Removal of equipment. No permanent storage of equipment. When no longer used, equipment shall be removed within thirty days unless surface owner agrees and city and county manager or his designee agrees to temporary equipment remaining on site for more than thirty days. (P) Pipelines and on-location flowlines. (1) Any newly constructed or substantially modified off-location oil and gas flow lines or crude oil transfer lines proposed as part of an applicant's oil and gas facility are subject to use by review under section 17-54-050. (2) Off-location flow lines and crude oil transfer lines shall be sited to avoid areas containing existing or proposed residential, commercial, and industrial buildings; places of public assembly; surface water bodies; and city open space. (3) Without compromising pipeline integrity and safety, applicant shall share existing pipeline rights-of-way and consolidate new corridors for pipeline rights-of-way to minimize adverse impact. (4) Operator shall comply with Broomfield's Public/Private Improvement Permit and easement processes for all crude oil transfer lines and off-location flowlines installed in Broomfield owned property or rights-of-way. (5) Off-location flow lines and crude oil transfer lines shall be located a minimum of 150 feet away from general residential, commercial, and industrial buildings, as well as the high-water mark of any surface water body unless technically infeasible, in which case such pipelines must be constructed in the next most protective location. This distance shall be measured from the nearest edge of the pipeline/flowline. Setbacks from sensitive environmental features will be determined on a case-by-case basis in consideration of the size and type of pipeline proposed and features of the proposed site. (6) Operator must conduct at least two forms of leak detection/integrity management inspections in order to identify leaks or integrity issues. (7) Operator must make available to Inspector upon request all records required to be kept by COGCC. (8) Buried pipelines shall have a minimum of four feet cover. (9) New pipelines shall be constructed no closer than five feet from property lines. (10) New pipelines shall be constructed in public rights-of-way, unless technically infeasible. (11) Operator shall notify city thirty days prior to any flowline and pipeline abandonment activities and must receive final approval from city prior to proceeding with any type of flowline or pipeline abandonment, whether in place or removal. (12) Operator's emergency response plan must address pipeline and on-location flowline spills and ruptures. (Q) Gathering Lines (1) Gathering lines shall be sited to avoid areas containing existing or proposed residential, commercial, and industrial buildings; places of public assembly; surface water bodies; and city open space and parks. (2) Without compromising pipeline integrity and safety, Operator shall share existing pipeline rights-of-way and consolidate new corridors for pipeline rights-of-way to minimize adverse impacts. (3) Setbacks from residential, commercial, or industrial buildings, places of public assembly, the high-water mark of any surface water body and sensitive environmental features will be determined on a case-by-case basis in consideration of the size and type of pipeline proposed and features of the proposed site. (4) Operator must make available to county upon request all records submitted to PHMSA or the PUC including those related to inspections, pressure testing, pipeline accidents and other safety events. (5) Operator's emergency response plan must address gathering line spills and ruptures. (6) Operator shall comply with Broomfield's Public/Private Improvement Permit and easement processes for all gathering lines installed in Broomfield owned property or rights-of-way. (R) Spills and releases. To minimize spills and releases from oil and gas facilities, the following measures will be required, as applicable based on the nature, size and location of the facility: (1) Berms or other secondary containment devices around crude oil, condensate, and produced water storage tanks enclosing an area sufficient to contain and provide secondary containment for 150% of the largest single tank. Berms or other secondary containment devices shall be sufficiently impervious to contain any spilled or released material. Inspection of all berms and containment devices at regular intervals, but not less than monthly. Maintenance of all berms and containment devices in good condition. A prohibition on the storage of ignition sources inside the secondary containment area unless the containment area encloses a fired vessel. (2) Construction of containment berms using steel rings, designed and installed to prevent leakage and resist degradation from erosion or routine operation. (3) Construction of secondary containment areas with a synthetic or engineered liner that contains all primary containment vessels and flowlines and is mechanically connected to the steel ring to prevent leakage. (4) For locations within 500 feet and upgradient of a surface water body, tertiary containment, such as an earthen berm, around oil and gas facilities. (5) A prohibition on more than two crude oil or condensate storage tanks within a single berm. (6) Notification to the city of all spills of a gallon or more that leaves the facility, all spills of any material on permeable ground at the facility that has a reportable spill quantity under any law and copies of any self-reporting submissions that operator provides to the COGCC. (7) Operator shall keep a daily incident log that is to be submitted to the city monthly. (8) Prohibition of onsite storage of waste in excess of thirty days. (9) No permanent storage of drilling and completions chemicals. Drilling and completion chemicals shall be removed at most sixty days after completion. (S) Temporary access roads. Operator will assure that temporary access roads are reclaimed and revegetated within sixty days of discontinued use. Erosion shall be controlled while they are in use. (T) Water quality. To minimize adverse impacts to surface and sub-surface water bodies from oil and gas facilities, the following measures will be required: (1) Prohibition of chemicals dangerous to human health. To prevent harm to human health and prevent odors, operators shall be prohibited from using any toxic, including orally toxic, chemical additives in hydraulic fracturing fluids including but not limited to, the following: a. All chemicals listed in COGCC Table 437-1; b. Polysorbate 80; and c. Perfluoroalkyl and polyfluoroalkyl substances or "PFAS chemicals," defined as a class of fluorinated organic chemicals containing at least one fully fluorinated carbon atom. (2) Decommissioned oil and gas well assessment. Prior to any hydraulic fracturing, and at periods following hydraulic fracturing, assessment and monitoring of plugged and decommissioned or removed from use, and dry and removed from use oil and gas wells (abandoned wells) within one-half mile of the projected track of the borehole of a proposed well. This includes: a. Based upon examination of COGCC and other publicly available records, identification of all abandoned wells located within one-half mile of the projected track of the borehole of a proposed well. b. Risk assessment of leaking gas or water to the ground surface or into subsurface water resources, taking into account plugging and cementing procedures described in any recompletion or plugged and abandoned (P&A) report filed with the COGCC. c. Notification of the city and county manager and COGCC of the results of the assessment of the plugging and cementing procedures. d. Permission from each surface owner who has an abandoned well on the surface owner's property to access the property in order to test the abandoned well. If a surface owner has not provided permission to access after thirty days from receiving written notice, the applicant shall not be required to test the abandoned well. e. Soil gas surveys from various depths and at various distances, depending on results of risk assessment, of the abandoned well prior to hydraulic fracturing. f. Soil gas surveys from various depths and at various distances, depending on results of risk assessment, of the abandoned well within one year and then every three years after production has commenced. g. Provide the results of the soil gas survey to the city and county manager and the COGCC within three weeks of conducting the survey or advising the city and county manager that access to the abandoned wells could not be obtained from the surface owner. h. If contamination is detected during any soils testing, no further operations may continue until the cause of the contamination is detected and resolved and the city has given its approval for additional operations to continue. i. All abandoned well assessments shall be conducted by the applicant or, if requested by a surface owner, by a qualified independent professional consultant approved by the city and county manager at the operator's expense. (3) Water source sampling and testing. Using records of the Colorado Division of Water Resources, the applicant will be required to identify and offer to sample all available water sources located within one-half mile of the projected track of the borehole of a proposed well and within one-half mile of the radius of the proposed well or facility. All sampling must be conducted by a third-party consultant approved of by the city. The owner or operator shall provide all water source test results to the city and maintain records of such results. Sampling requirements include: a. Initial baseline samples and subsequent monitoring samples shall be collected from all available water sources within one-half mile of the projected track of the borehole of a proposed well and one-half mile radius of the facility or multi-facility; b. Initial collection and testing of baseline samples from available water sources shall occur within twelve months prior to the commencement of drilling a well, or within twelve months prior to the re-stimulation of an existing well for which no samples were collected and tested during the previous twelve months; c. Post-stimulation samples of available water sources shall be collected and tested pursuant to the following time frame: i. One sample within six months after completion; ii. One sample between twelve and eighteen months after completion; and iii. One sample between sixty and seventy-two months after completion; d. For multi-well pads, collection shall occur annually during active drilling and completion; e. Operator shall collect a sample from at least one up-gradient and two down-gradient water sources within a one-half mile radius of the facility. If no such water sources are available, operator shall collect samples from additional water sources within a radius of up to one mile from the facility until samples from a total of at least one up-gradient and two down-gradient water sources are collected. Operators should give priority to the selection of water sources closest to the facility; f. An operator may rely on existing groundwater sampling data collected from any water source within the radii described above, provided the data was collected within the twelve months preceding the commencement of drilling the well, the data includes measurement of all of the constituents measured in Table 1, and there has been no significant oil and gas activity within a one-mile radius in the time period between the original sampling and the commencement of drilling the well; g. The operator shall make reasonable efforts to obtain the consent of the owner of the water source. If the operator is unable to locate and obtain permission from the surface owner of the Water Source, the operator shall advise the city and county manager that the applicant could not obtain access to the water source from the surface owner; h. Testing for the analytes listed in Table 1, and subsequent testing as necessary or appropriate; i. Operator shall follow standard industry procedures in collecting samples, consistent with the COGCC model Sampling and Analysis Plan; j. Reporting the location of the water source using a GPS with sub-meter resolution; k. Field observations. Reporting on damaged or unsanitary well conditions, adjacent potential pollution sources, odor, water color, sediment, bubbles, and effervescence; l. Test results. Provide copies of all test results described above to the city and county manager, the COGCC, and the water source owners within three months after collecting the samples; m. Subsequent sampling. If sampling shows water contamination, additional measures may be required including the following: i. If free gas or a dissolved methane concentration level greater than one milligram per liter (mg/l) is detected in a water source, determination of the gas type using gas compositional analysis and stable isotope analysis of the methane (carbon and hydrogen); ii. If the test results indicate thermogenic or a mixture of thermogenic and biogenic gas, an action plan to determine the source of the gas; iii. Immediate notification to the city and county manager, the COGCC, and the owner of the water source if the methane concentration increases by more than five mg/l between sampling periods, or increases to more than ten mg/l; iv. Immediate notification to the city and county manager, the COGCC and the owner of the water source if BTEX and/or TPH are detected as a result of testing. Such detections may result in required subsequent sampling for additional analytes; v. Further water source sampling in response to complaints from water source owners; vi. Timely production and distribution of test results, well location, and analytical data in electronic deliverable format to the city and county manager, the COGCC and the water source owners. n. Qualified independent professional consultant. All water source testing shall be conducted by the applicant or, if requested by a surface owner, by a qualified independent professional consultant approved by the city and county manager at the operator's expense. Table 1. Water Quality Analytes GENERAL WATER QUALITY | Alkalinity Conductivity & TDS Ph Dissolved Organic Carbon (or Total Organic Carbon)Bacteria Hydrogen Sulphide MAJOR IONS | Bromide Chloride Fluoride Magnesium Potassium Sodium Sulfate Nitrate + Nitrite as N (total) METALS | Arsenic Barium Boron Chromium Copper Iron Lead Manganese Selenium Strontium DISSOLVED GASES AND VOLATILE ORGANIC COMPOUNDS | Methane Ethane Propane BTEX as Benzene, Toluene, Ethylbenzene, Xylenes Total Petroleum Hydrocarbons (TPH) OTHER | Water Level Stable isotopes of water (Oxygen, Hydrogen, Carbon) Phosphorus (4) Waste management. Conditions of approval that will ensure proper waste management including one or more of the following: a. All fluids shall be contained and there shall be no discharge of fluids; b. Land treatment of oil impacted or contaminated drill cuttings is prohibited. (U) Weed control. Required at the facility until final reclamation and abandonment. (V) Regulations. An operator shall comply with all applicable state and federal laws and regulations, as such regulations exist now and with more stringent regulations adopted in the future. (W) Site access and security. Site shall be properly secured, including, but not limited to, security fencing or barriers to prevent unauthorized access to site. Site shall be properly secured prior to the start of drilling. Proposed fencing, barriers, and screening shall be included in visual mitigation plan. (X) Flammable material. The area twenty-five feet around anything flammable shall be kept free of dry grass or weeds, and conform to COGCC safety standards and applicable fire code. The operator's pre-application and application shall be reviewed by NMFRD. (Y) Mud tracking. Mud tracking on city streets shall be de minimus. Operator shall take all practical measures to prevent mud and operator shall clean up any mud tracked onto city streets from all construction and operations within a reasonable time not to exceed two hours. (Z) Trailers. A construction trailer is permitted during active drilling and completions only. No residential trailers will be allowed. Only equipment needed for the project should be on site. (AA) Visual screening. Operator shall construct a thirty-two-foot wall to screen the facility from view and provide noise and light mitigation with such walls to be colors that blend with the surrounding natural background. (BB) Wastewater injection wells are prohibited in Broomfield. (CC) Landscaping and berming plan approved by city that includes maintenance and irrigation requirements for planted vegetation throughout the duration of operations, including production. Operator shall be required to provide maintenance funding through bonding to ensure funds are available for upkeep. (DD) Odor. No emission of odorous gases or other odorous matter shall be permitted in such quantities as to be readily detectable when diluted in the ratio of one volume of odorous air to four volumes of clean air. Operator is required to take odor mitigation measures to address odors and chemical smells, including the following, as required by the city based on the nature, size and location of the facility: (1) Adding an odorant which is not a masking agent or adding chillers to the muds; (2) Enclosing shale shaker to contain fumes from exposed mud, where safe and feasible; (3) Increasing additive concentrations during peak hours; (4) Using filtration systems or additives to minimize odors from drilling and fracturing fluids except that operator shall not mask odors by using masking fragrances; (5) Using synthetic based oil drilling muds or other types of muds that minimize and mitigate odors; (6) Removing drilling mud from drill pipe each time it is removed from the well; (7) Prohibition on exposed drilling mud; (8) Limitation on use of diesel generators; (9) Drill cuttings shall be covered to prevent odor while being transported by truck. (EE) Risk Analysis. Operator shall submit a risk analysis and site-specific detailed quantitative and qualitative risk assessment and management plan for pipelines and oil and gas facilities. Plan must identify risks, include qualitative and quantitative risk assessment, list methods of risk avoidance and control that implement techniques to prevent accidents and losses and reduce the impact or cost of an accident or loss after it occurs. (FF) Safety management plan and management system applicable to all covered processes at the facility. Safety management system shall provide for employees and systems to oversee implementation and periodic revision of plan. Plan shall include the following elements and describe the manner in which each of the following elements will be applied to the covered processes: (1) Process safety information. Compilation of written process safety information needed to conduct process hazard analysis. Process safety information shall include information pertaining to hazards of substances and chemicals used by the process, information pertaining to the technology of the process, information pertaining to the equipment used in the process, and information pertaining to the hazards of the substances or chemicals in the process. Documentation that equipment used in the process complies with recognized and generally accepted good engineering practices; (2) Operating procedures. Written operating procedures that provide clear instructions for safely conducting activities involved in each covered process consistent with the process safety information, and at least annual review of operating procedures to ensure they reflect current operating practices; (3) Employee participation. Plan for ensuring employee participation in the conduct and development of process hazards analysis and access to process hazards analysis; (4) Training. Written procedures detailing initial and refresher employee training requirements and documentation of employee training; (5) Mechanical integrity. Written procedures designed to maintain the on-going integrity of process equipment, ensure employees involved in maintenance are properly trained to ensure the ongoing integrity of process equipment, ensure that process equipment is tested and inspected in accordance with manufacturer specifications, correct deficiencies in equipment in a safe and timely manner, and ensure that new equipment is installed or constructed properly; (6) Management of change. Written procedures to manage changes to covered processes, technologies, equipment and procedures; (7) Pre-startup reviews. Written procedures regarding pre-startup safety reviews; (8) Compliance audits. Written procedures requiring an audit every three years to verify compliance with the procedures and practices developed under the safety management plan, and procedures requiring correction of any deficiencies identified in audit; operator will make results of audit available to inspector upon request; (9) Incident investigation. Written procedures requiring investigations of all near-misses and incidents, including root cause analysis of all incidents resulting in fatalities or serious environmental harm, establishing a system to promptly address and resolve the incident, and requiring that all employees and contractors whose job tasks are relevant to the investigation of the near miss or incident review the investigation report. (10) Hot work. The facility shall ensure that all hot work complies with city and state fire prevention and protection requirements. (11) Contractors. Written procedures describing how operator screens, oversees, shares process safety and emergency response and preparedness information with contractors; (12) Process hazard analysis. Process hazard analysis for each covered process; (13) Incident history. List of all incidents, including traffic incidents, that have occurred at the operator's facilities within the last ten years, along with any investigation reports, root cause analysis and operational or process changes that resulted from the investigation of the accident; (14) Safety culture assessment. Written procedures requiring operator periodically review safety culture, and at a minimum conduct such review after each major accident; and (15) Inherently safer systems analysis. Require analysis at least every five years, whenever a change is proposed at the facility that could result in an incident, after an incident if recommended by the investigation report or root cause analysis, and during the design of new processes, equipment or facilities. Safety management plan is subject to review by the city and county manager and city council periodically, but at least every three years and after any incident. City may retain outside consultants to review SMP and may request modifications to safety management plan based on its review and public input. (GG) Safety and accidents. (1) Incidents. Within a week following any safety incident, operator shall submit a report to the city including the following, to the extent available: a. Fuel source, location, proximity to residences and other occupied buildings, cause, duration, intensity, volume, specifics and degree of damage to properties, if any beyond the facility, injuries to persons, emergency response, and remedial and preventative measures to be taken within a specified amount of time; b. City may require operator to conduct root cause analysis of any incidents. (2) Automatic safety protective systems and surface safety valves. Operator is required to install automated safety system prior to commencement of production. Automated safety system shall include the installation, monitoring and remote control of a subsurface safety valve and shall be able to remotely shut in wells on demand. Subsurface safety valve shall be equipped to operate remotely via the automated safety protective system. Operator shall test automated safety system quarterly to ensure functionality and provide results of testing to city quarterly. (HH) Financial assurance (1) Operator shall maintain or cause to be maintained, with insurers authorized by the state of Colorado and carrying a financial strength rating from A.M. Best of no less than A- VII (or a similar rating from an equivalent recognized ratings agency), at a minimum, the following types of insurance with limits no less than the amounts indicated: a. Commercial general liability insurance on an occurrence form including coverage for bodily injury and property damage for operations and products and completed operations with limits of not less than $1,000,000.00 each and every occurrence, $2,000,000.00 General Aggregate and $2,000,000.00 Products/Completed Operations Aggregate. The city requires the Products/Completed Operations coverage to be provided three years after completion of construction. An endorsement must be included with the certificate. b. Automobile liability insurance with limits of not less than $1,000,000.00 each Accident covering owned, hired and non-owned vehicles. c. Workers' compensation and Employer's Liability insurance must be maintained for all employees, providing statutory coverage and Employer's Liability insurance with minimum limits of $100,000.00 each accident, $100,000.00 disease-each employee and $500,000.00 disease policy limit. d. Control of well/operators extra expense insurance with limits of not less than $25,000,000.00 covering the cost of controlling a well that is out of control or experiences a blowout. Coverage to include re-drilling or restoration expenses, legal liability for pollution-related bodily injury or property damage resulting from an out of control well event, loss of equipment and evacuation expense. e. Umbrella/excess liability insurance in excess of general liability, employer's liability, and automobile liability with limits no less than $25,000,000.00 per occurrence; provided, however, that for so long as the Construction Phase, Drilling Phase or Completions Phase is ongoing at any of the Well Sites, Operator will maintain such insurance with limits no less than $100,000,000.00 per occurrence. f. Environmental liability/pollution legal liability insurance for gradual pollution events, providing coverage for bodily injury, property damage or environmental damage with limits no less than with limits of not less than $25,000,000.00 per pollution incident. Coverage to include claims arising during transportation and at non-owned waste disposal sites. Should this insurance be on a claims-made basis the retroactive date must precede the date field activities were initiated. g. Contractors. Operator shall require adequate insurance of its contractors and subcontractors. Operator agrees that it shall be responsible for any damage or loss suffered by the county as a result of negligence by Operator or any subcontractor with these requirements. h. Operator shall waive and cause its insurers to waive for the benefit of the city any right of recovery or subrogation which the insurer may have or acquire against the city or any of its affiliates, or its or their employees, officers or directors for payments made or to be made under such policies. i. Operator is required to add the city and its elected and appointed officials and employees as additional insureds under general liability (including operations and completed operations), auto liability, Environmental/Pollution Liability and umbrella liability policies. j. Operator shall ensure that each of the policies are endorsed to provide that they are primary without right of contribution from the city or any insurance or self-insurance otherwise maintained by the city, and not in excess of any insurance issued to the city. k. Operator shall ensure that each of the policies above (excluding workers' compensation and control of well/operators extra expense) are endorsed to state that the inclusion of more than one insured under such insurance policy shall not operate to impair the rights of one insured against another insured and that the coverage afforded by each insurance policy shall apply as though a separate policy had been issued to each insured. l. All policies shall be endorsed such that they cannot be canceled or non-renewed without at least thirty days' advanced written notice to the Operator and the city, evidenced by return receipt via United States mail, except when such policy is being canceled for nonpayment of premium, in which case ten days advance written notice is required. Language relating to cancellation requirements stating that the insurer's notice obligations are limited to "endeavor to" are not acceptable. m. Operator shall, prior to permit issuance, and at least annually, deliver certificates of insurance reasonably acceptable to the city confirming all required minimum insurance is in full force and effect. n. Deductibles or retentions shall be the responsibility of Operator. Deductibles or retentions must be listed on the certificate of insurance required herein and are subject to the reasonable approval of the city. o. Operator shall require any of its subcontractors to carry the types of coverage and in the minimum amounts in accordance with the requirements this section 17-54-090.II, 1.a-c. Operator agrees that it shall be responsible for any damage or loss suffered by the city as a result of non-compliance by Operator or any subcontractor with these requirements. p. If Operator's coverage lapses, is cancelled or otherwise not in force, the city reserves the right to obtain insurance required herein and charge all costs and associated expenses to Operator, which shall become due and payable immediately. q. A surety bond or other financial assurance deemed acceptable by the city is required from the Operator to ensure performance of all obligations of the operator in compliance with all rules, regulations, and laws imposed by the city, including the obligation to properly plug, abandon and reclaim all wells, well sites and pipelines. Upon the commencement of the drilling of any new oil and gas well, the Operator shall procure and deposit with the city a surety bond issued by an insurer authorized by the state of Colorado and carrying a financial strength rating from A. M. Best of no less than A- VII. The amount of financial assurance required is $12.00 per linear foot of the aggregate wellbore of all wells to be drilled subject to a minimum of $100,000.00 and a maximum of $1,000,000.00. The applicable bond amount shall be reviewed annually (or earlier by mutual agreement) and shall be released when all oil and gas wells subject to the approved use by special review have been plugged and abandoned, as determined by the city. r. Term. All required insurance, bonds or other financial assurance required by this section shall be provided to the city prior to commencement of any work, including well pad construction, and shall remain in effect until all wells subject to the approved use by special review have been plugged and abandoned, as determined by the city, unless the financial assurance has been replaced or released or reduced pursuant to regulations established by the city. No financial assurance shall be released or reduced unless: (A) alternate financial assurance is provided; or B) the city manager determines that the amount of financial assurance released or reduced is not necessary to ensure the purpose for which it was provided. (II) Land disturbance and compatibility. Conditions of approval that will reduce impacts to the site, residential development, natural resources, environmental resources, agricultural resources, floodways and floodplains, wetlands, and recreational activities, and will enhance compatibility with the surrounding area or scenic and rural character may be required, including, but not limited to, one or more of the following: (1) Reduction. A reduction of the number of wells on a single pad; (2) Pad dimensions. Adjustment of pad dimensions to the minimum size necessary to accommodate operational needs while minimizing surface disturbance; (3) Structures and surface equipment. Adjustment of structures and surface equipment to the minimal numbers and size necessary to satisfy operational needs; (4) Shared infrastructure. Use of shared existing infrastructure by oil and gas operations, minimizing the installation of new facilities and avoiding additional disturbance to lands in a manner that reduces the introduction of significant new facility impacts to the environment, landowners and natural resources; (5) Vegetation. Maximization of the amount of natural screening available for the facility. Natural screening includes, but is not limited to, the use of existing vegetation as a background, the construction of the facility near screening stands of vegetation, or placement in valleys allowing topographic screening. Construction of the facility in a manner that minimizes the removal of and damage to existing trees and vegetation. If the facility requires clearing trees or vegetation, feathering and thinning of the edges of the cleared vegetation and mowing or brush-hogging of the vegetation while leaving root structure intact, instead of scraping the surface; (6) Equipment. Use of low profile tanks and less intrusive equipment; (7) Spills and leaks. A plan to monitor for fluid leaks or spills; (8) Operator shall identify and mitigate through location of facilities and berms potential environmental impacts to drainage ways in a form acceptable by the city; (9) Transportation. Conditions of approval that will ensure public safety for all modes of travel along travel routes to and from the site and maintain quality of life for other users of the city transportation system, adjacent residents, and affected property owners, including a requirement that the applicant use a particular route for some or all of the pad construction, drilling, and completion phases of the oil and gas facility; maintenance practices on the proposed route during pad construction, drilling, and completion designed and implement to adequately minimize adverse impacts; and compliance with city transportation standards. (JJ) Pipeline and Flowline abandonment (1) Operator must receive final approval from the city before proceeding with pipeline or flowline abandonment activities. The city will require removal of flowlines and pipelines unless the city determines removal causes greater adverse impacts to public health, safety, welfare, or the environment than abandonment in place. (2) With respect to flowlines and pipelines abandoned in place, a tracer will be placed in any nonmetal line. (3) All lands disturbed by removal of flowlines and pipelines will be reclaimed and revegetated. (KK) Well abandonment or decommissioning. An operator may not plug, re-plug, abandon or otherwise decommission an oil and gas well until the city has reviewed and provided written approval to the Operator. (1) The operator shall comply with any COGCC rules regarding well abandonment, decommission, or reclamation. (2) Upon plugging and reclaiming a well, the applicant shall provide the city with surveyed coordinates of the decommissioned or reclaimed well. (3) City inspector shall be onsite during plugging and abandoning. (4) Unless otherwise requested by the surface owner, the Applicant must leave onsite a permanent physical marker of an abandoned well location. (LL) New Technologies. Operator shall review its operations every five years and retrofit with new beneficial technology if feasible in consultation with Broomfield.

(Ord. No. 2144, § 1, 5-11-21; Ord. No. 2172, § 1, 2-8-22)

Ask a question about Broomfield law

Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.