For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17-54-080 — Final plans required for approval

Municipal Code of the City and County of Broomfield, Colorado (Codified through Ordinance No. 2304, adopted May 26, 2026 (Supp. No. 54)) · Broomfield Municipal Code § 17-54-080

Corpus is an independent public-information project, not the official City of Broomfield website. Stable reference: corpuslaw.us/code/21f9467f-eb6d-45b1-835f-1e720f3f04bf

17-54-080 - Final plans required for approval.

All use permitted by special review applications approved by the city council pursuant to 17-54-050 B.M.C., shall require compliance with the final plans listed below. Such final plans shall be approved by the city and county manager and city council prior to the commencement of drilling. In addition to any other notices required by this chapter, Operator shall provide written notice to the city no less than thirty days prior to the commencement of construction, drilling, completion or any recompletion, re-drilling or plugging and abandonment of a well, for all approved facilities. (A) A response letter that outlines how the permit requirements have been met; (B) A list of all permits or approvals obtained or to be obtained from local, state, or federal agencies; (C) Copies of all permits requested, including any exceptions; (D) A detailed site plan for all facilities that includes submittal to the city of all documents required to be submitted with a COGCC Form 2A, if different, a depiction of all visible improvements within 500 feet of the proposed location, to include buildings/residences, public roads and trails, major above-ground utilities, railroads, pipelines, mines, oil/gas/injection/water/plugged wells, etc. as required by applicable COGCC rules, and the site plan requirements of the Broomfield Municipal Code, as amended; (E) A summary of planned facilities, including identified access points and operational timeline for posting to a local community information web page; (F) A site plan for site preparation, mobilization, and demobilization; (G) A plan for interim reclamation and revegetation of the well pad and final reclamation of the well pad; Vicinity maps for each facility, including maps that show the following information: (1) The location of all existing water bodies and watercourses, including direction of water flow; (2) The location for existing oil and gas wells or injection wells as reflected in COGCC records; and (3) The location of the drill site; (H) Final project schedules for all phases, including site construction, pipeline construction, drilling, completions (broken down into activity-based components), commissioning, operations, reclamation, and plugging and abandonment; (I) Information demonstrating the operator is capable of fulfilling and is likely to fulfill the obligations imposed by this chapter and the Oil and Gas Conservation Act; (J) Information demonstrating the operator will comply with chapter 17-40 B.M.C. and applicable FEMA requirements; (K) Information demonstrating the operator will comply with chapter 13-50 B.M.C.; (L) A final alternative site analysis; (M) A final noise modeling protocol; (N) A final noise impact mitigation plan; (O) A final odor mitigation plan; (P) A final plan for light and dust mitigation; (Q) A final traffic management plan and a reasonable bond to cover any damage to public infrastructure during active drilling and completion; (R) A final detailed traffic plan that determines any operational changes and geometric modifications necessary for extraction activities; (S) A final air quality mitigation plan; (T) A final air modeling plan; (U) A final air monitoring plan that describes how the operator will conduct baseline and subsequent monitoring within 500 feet of a proposed facility; (V) A final electrification plan; (W) A final emergency preparedness and response plan; (X) A final weed control plan; (Y) A final traffic management plan; (Z) A final landscaping and visual mitigation plan; (AA) A final fencing and screening mitigation plan; (BB) A final water quality plan; (CC) A final grading, drainage, and erosion control plan; (DD) A final stormwater management plan; (EE) A final risk management plan; (FF) A final abandoned wells plan; (GG) A final wetlands protection plan; (HH) A final hazardous materials management plan; (II) A final waste management plan; (JJ) A final assessment of historical and cultural resources in and around the proposed oil and gas development, including proposed mitigation measures; (KK) A final water supply plan; (LL) A twenty-day letter confirmed by the city stating that any environmental and wildlife conditions identified in the environmental assessment have been addressed; (MM) A final cumulative impacts analysis; (NN) A final flowline management plan; (OO) A listing of all required fees and costs and proof of payment; and (PP) Additional information. If the city and county manager determines that the city needs additional information to determine whether the proposed oil and gas facility meets the criteria in chapter 17-54-070 B.M.C., the city and county manager may require the applicant to submit such information.

(Ord. No. 2144, § 1, 5-11-21)

Ask a question about Broomfield law

Corpus searches the Broomfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.