§ 15.54.050 — Inspections, testing and corrections to work

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 15.54.050

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/72467fa2-030e-433a-9301-eeec85aa975c

15.54.050 - Inspections, testing and corrections to work.

Public and/or necessary private improvements are required to have inspections by the Town in order to assure that uniformity, proper construction techniques and acceptable materials are implemented during the construction process. A. Construction Work shall be in accordance with the Town approved Construction Documents and may only occur with the appropriate inspections and testing. The Developer shall contact the Inspector for all required field inspections of Public and private Improvements, and submit any third party testing as may be required. Material testing shall be done in accordance with the Construction Methodology and Materials Manual. B. The Inspector shall have access to all work and materials for a Project at all times. The Developer shall provide proper facilities for such access and for inspection. The Inspector shall have the right to reject materials, workmanship or methods of construction not in compliance with these Regulations. Rejected workmanship or construction methods shall be satisfactorily corrected by the Developer, and rejected materials shall be removed from the premises. If the Developer does not correct or remove such rejected items within a reasonable time, the Town may either remove materials from the Project and charge this expense to the Developer or may issue a Stop Work Order, as specified in 15.54.070. C. If Work has been completed without proper Inspections and approval by Town Inspector, the Developer shall supply all labor, equipment and materials to complete the required inspections, including removal of completed Work to allow for necessary inspection. If such Work is found to be defective in any material or workmanship respect, the Developer shall remedy the Work to be in compliance with the approved Construction Documents and Town Regulations. D. If the Town requires additional tests or data beyond that identified in these Regulations or on the approved Construction Documents, the costs of such tests shall be borne by the Town. Should such tests or additional data show a failure to meet these Regulations or the approved Construction Documents, the Developer shall be responsible for the cost of such testing and data along with all costs associated with repair or replacement of said failure. E. If the Inspector identifies any neglects or disregard of the approved Construction Documents or these Regulations, such neglect or disregard shall be immediately remedied and any defective Work shall be discontinued at once. F. If the Work being done by the Developer violates any Regulation set forth in this CRMC or the Technical Manuals, terms specified in the improvement agreement or the approved Construction Documents, the Inspector shall notify the Developer of the violation in writing. Upon receipt of such written notice, the Developer shall immediately cease the violation and perform necessary corrective work. If Developer does not proceed with corrective work in the timeframe specified by the inspector a Stop Work Order may be issued. G. The observation of the Work by the Inspector is intended to aid the Developer in applying labor, materials, and workmanship in compliance with the approved Construction Documents and these Regulations. Such inspection and observations, however, shall not relieve the Developer from any obligations related to the requirements of the approved Construction Documents or these Regulations. Responsibility for damage from or replacement of work not in compliance with the terms of the Improvement Agreement, approved Construction Documents or these Regulations, shall rest entirely with the Developer for the full period of construction or Warranty Period, regardless of whether or not the Developer had been previously advised of any said non-compliance. H. If changes to the approved Construction Plans are required during construction, a Field Change Order shall be submitted for Town Approval as prescribed in the Development Procedures Manual. An approved Field Change Order is needed prior to construction of the proposed modification.

(Ord. 2012-16 §1, 2012)