For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.54.080 — Developers with Franchise Agreements

Municipal Code of the Town of Castle Rock, Colorado (Codified through Ordinance No. 2026-014, enacted May 5, 2026 (Supp. No. 63)) · Castle Rock Municipal Code § 15.54.080

Corpus is an independent public-information project, not the official City of Castle Rock website. Stable reference: corpuslaw.us/code/a10b8e28-a58d-4fa5-9eb7-21a2e4ac6050

15.54.080 - Developers with Franchise Agreements.

For Developers having a Franchise Agreement with the Town, performance and warranty Surety, Plan Review, and Inspection may not be required as a condition of Construction Permit issuance. However, the following requirements shall apply: A. The application for a Construction Permit must be submitted at least five working days prior to the Work starting. B. Traffic Control Plans (TCP) shall be submitted with the application pursuant to the procedures set forth in the Development Procedures Manual. C. All Work within the Right-of-Way will require inspection by the Inspector. D. All Work shall be described on a plan and shall be drawn at a legible engineering scale. The minimum requirements to be annotated on this Plan submittal shall be as follows: 1. All affected platted Rights-of-Way with dimensions; 2. Existing facilities with dimensions (in close proximity to proposed improvements); 3. Easements with dimensions; 4. Location and description of Work with dimensions.

(Ord. 2012-16 §1, 2012)

Ask a question about Castle Rock law

Corpus searches the Castle Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.