§ 10-37 — General provisions related to elevation of structures
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 10-37
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/1000ab09-7b93-4a03-9923-f01101571e38
Sec. 10-37. - General provisions related to elevation of structures.
(a) Determination of base flood elevation. (1) Base flood elevations established. The base flood elevation for any location shall be determined using the higher of: a) the base flood elevation documented for that location on the FIRM and Flood Insurance Study; and b) the base flood elevation documented for that location on the maps and supporting technical analysis on which the City's floodplain delineation for the location has been adopted by the City pursuant to Subsection 10-19(b). (2) Flood depth in lieu of mapped base flood elevation. For a location within an AO zone or any location within a City basin floodplain for which a base flood elevation has not been determined by FEMA or the City, if the depth of flooding has been documented by either FEMA or the City to exceed one (1) foot, the base flood elevation shall be determined based on the specified flood depth above the highest adjacent grade documented on: a) the FIRM and Flood Insurance Study; or b) the maps and supporting technical analysis on which the City's floodplain delineation for the location has been adopted by the City pursuant to Subsection 10-19(b). (3) In lieu of flood depth or mapped base flood elevation. For a location in an AO zone for which no flood depth information has been documented on the FIRM, the base flood elevation shall be deemed to be twenty-four (24) inches above the highest adjacent grade. (b) Requirement to elevate. In any flood hazard area, the duct work, heating, ventilation and air conditioning systems, hot water heater, electrical and the lowest floor level of any structure in the event of any new construction, addition, substantial improvement or repair of substantial damage, or redevelopment must be elevated to or above the applicable regulatory flood protection elevation, except to the extent either floodproofing is allowed in lieu of said elevation in the manner described in § 10-38 or venting is allowed in lieu of said elevation in the manner described in § 10-39. This requirement shall be referred to as the elevation or freeboard requirement. (c) Determination of regulatory flood protection elevation. The regulatory flood protection elevation shall be determined as follows: (1) Poudre River floodplain: a. Twenty-four (24) inches above the base flood elevation; (2) FEMA basin and City basin floodplains: a. For new construction and redevelopments, eighteen (18) inches above the base flood elevation; b. For additions and substantial improvements, twelve (12) inches above the base flood elevation; and c. For accessory structures, twelve (12) inches above the base flood elevation; (d) Determination of lowest floor elevation. The lowest floor elevation of the structure shall be determined based on the type of foundation. If more than one (1) foundation type is used, the lowest floor elevation shall be determined separately for each portion of the structure with a different foundation type. (1) Slab-on-grade. The lowest floor elevation of a slab-on-grade structure shall be measured at the top of the slab. (2) Basement. The lowest floor elevation of a structure with a basement shall be measured at the top of the basement slab. (3) Crawl space. The lowest floor elevation of a structure with a crawl space that is built in accordance with the specifications of § 10-40 shall be measured at the top of the floor of the lowest finished area. The lowest floor elevation of a structure with a crawl space that is not built in accordance with the specification of § 10-40 shall be measured at the lowest interior grade of the crawl space. (4) Enclosure. The lowest floor elevation of a structure with an enclosure that is built in accordance with the venting specifications of § 10-39 shall be measured at the top of the floor of the lowest finished area. The lowest floor elevation of a structure with an enclosure that is not built in accordance with the venting specifications of § 10-39 shall be measured at the lowest interior grade of the enclosure. (e) Elevation certificate required. A FEMA elevation certificate, signed and certified by a registered professional land surveyor, accurately documenting the as-built elevation of the improvements, must be submitted to the Utilities Executive Director and accepted before release of a certificate of occupancy for the structure.
(Ord. No. 37, 2005, 3-15-05; Ord. No. 160, 2013, § 7, 11-19-13; Ord. No. 161, 2013, § 4, 11-19-13)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.
