§ 10-45 — Floodway evaluations
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 10-45
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/fbdee124-a66f-44b0-9475-c8db28abcb70
Sec. 10-45. - Floodway evaluations.
Where otherwise permitted, any development, obstruction or activity that will result in an encroachment in or modification to the floodway shall be permitted only if the following requirements are met, using floodplain modeling and technical analysis consistent with floodplain modeling guidelines and standards established or approved by the Utilities Executive Director, including, but not limited to, the considerations and requirements set forth in § 10-27: (1) Required demonstrations for floodway encroachments and/or modifications. At least one (1) of the following requirements must be met for any floodway encroachment or modification: a. No rise. The development, obstruction or activity must be shown by appropriate floodplain modeling to result in no increase in base flood elevations, also referred to as no rise, as defined in § 10-16, and: 1. A certification signed by a registered professional engineer accurately documenting that no increase in base flood elevations will result from the proposed development, obstruction or activity, in a form approved by the Utilities Executive Director, must be submitted prior to issuance of a floodplain permit, and 2. A certification signed by a registered professional engineer accurately documenting the as-built base flood elevations after completion of the development, obstruction or activity as resulting in no increase in base flood elevations must be submitted prior to the issuance of a certificate of occupancy, or, in the event no certificate of occupancy is required, upon completion of the improvements; or b. No rise except on applicant land or easement. The development, obstruction or activity must be shown by appropriate floodplain modeling to result in no increase in base flood elevations or change in floodway or flood fringe boundaries, except on the applicant's contiguous property or on property for which the applicant has obtained and recorded easements sufficient to allow for the associated changes, and: 1. A certification signed by a registered professional engineer accurately documenting that no increase in the floodway or base flood elevations on other than the applicant's contiguous property or on property for which the applicant has obtained and recorded easements sufficient to allow for the associated changes will result from the proposed development, obstruction or activity, in a form approved by the Utilities Executive Director, must be submitted prior to issuance of a floodplain permit; and 2. A certification signed by a registered professional engineer accurately documenting the as-built floodway and base flood elevations after completion of the development, obstruction or activity as resulting in no increase in the floodway or base flood elevations on other than the applicant's contiguous property or other than provided by recorded easements must be submitted prior to the issuance of a certificate of occupancy, or, in the event no certificate of occupancy is required, upon completion of the improvements. (2) Map revisions. a. Conditional map revisions. A Conditional Letter of Map Revision must be approved by FEMA, or, for a City basin floodplain, a preliminary map revision must be approved by the Utilities Executive Director, prior to issuance of a floodplain permit or initiation of construction or permitted activities for any proposed development or activity in the floodway that: 1. results in any of the following: a) an increase in base flood elevation of more than 0.00 feet, b) a decrease in base flood elevation of more than 0.30 feet, c) a change in watercourse location, d) the addition of new area within the floodway, or e) a physical change to the hydrology of the floodway or hydraulic conveyance with the floodway; or 2. requires any of the following in order to meet the requirements for a floodplain use permit: a) technical analysis to correct existing map errors, b) technical analysis that incorporates improved technical data, or c) technical analysis that applies improved or alternative hydrologic or hydraulic methodologies. b. Final map revisions. Upon completion of development or other activities for any development or activity in the floodway that results in a change to base flood elevations, floodway or flood fringe boundaries, regardless of whether a Conditional Letter of Map Revision has been required pursuant to Subparagraph (2)a. above, a Letter of Map Revision or Physical Map Revision must be approved by FEMA, or, for a City basin floodplain, a final map revision must be approved by the Utilities Executive Director, prior to issuance of a certificate of occupancy, or, in the event no certificate of occupancy is required, upon completion of the improvements.
(Ord. No. 37, 2005, 3-15-05; Ord. No. 015, 2007 § 6, 2-20-07; Ord. No. 080, 2011, § 1, 9-6-11; Ord. 162, 2013, § 1, 11-19-13)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.
