§ 23-175 — Operational standards
Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 23-175
Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/58bfe675-be6e-472d-848b-cf827ba79f2d
Sec. 23-175. - Operational standards.
(a) Federal requirements. All SCFs shall meet the current standards and regulations of the FAA, the FCC and any other agency of the federal government with the authority to regulate SCFs. If such standards and regulations are changed, the SCF owners shall bring such facility into compliance with such revised standards and regulations within the time mandated by the controlling federal agency. (b) Radio frequency standards. All SCFs shall comply with federal standards for radio frequency emissions. (c) Signal interference. All SCFs shall be designed and sited so as not to cause interference with the normal operation of licensed radio, television, telephone and other communication services on adjacent properties; nor shall any such facilities interfere with any public safety communications. (d) Legal access. The applicant shall warrant and represent for all SCF permit applications that the applicant has entered into a master license agreement for any public highway affected by the application providing legal access to/from the SCF and the utilities necessary to operate and maintain the facility, and, where applicable, permission to attach the SCF from the owner of the pole. (e) Operation and maintenance. (1) To ensure structural integrity of SCFs, the SCF owner shall ensure the SCF and all associated support infrastructure is maintained in compliance with local building and safety codes, and applicable state and federal government agency wireless communication facility standards. If upon inspection, the City reasonably concludes a SCF fails to comply with such codes and constitutes a danger to persons or property, upon written notice provided to the SCF owner, the owner shall have thirty (30) days from the date on the notice to bring the SCF into compliance. Upon good cause shown by the WCF owner, the Engineer may extend such compliance period not to exceed ninety (90) days from the date of said notice. If the SCF owner fails to bring the SCF into compliance within said period, the City may remove such facility at the applicant's and/or owner's expense. (2) The site and the SCF including all landscaping and related transmission equipment shall be maintained at all times in a neat and clean manner and in accordance with all approved plans (3) If any FCC, state or other governmental license or approval to provide personal wireless services is revoked as to any SCF permitted or authorized under this Article, the applicant must inform the City of the revocation within thirty (30) days of receiving notice of such revocation. (4) No trees may be removed or pruned in maintaining or operating a SCF, except upon satisfying the necessity standards in § 23-176(c)(5)d. and all requirements in Chapter 27 of this Code. (5) To ensure proper identification of underground elements of SCFs, upon request by the City, the applicant shall provide as-built drawings and a statement of compliance with all permit location conditions for SCFs permitted under this Article. The failure of an applicant to submit completed as-built drawings shall be interpreted as a waiver of all claims for damages or injuries arising from inaccurate locates by the City or third parties as to the location of applicant's underground SCF elements. (6) The SCF will remain free from graffiti and other forms of vandalism. Any damage shall be repaired as soon as practicable, and in all instances upon the earlier of ten (10) calendar days from the date of notification by the City and/or discovery by the applicant or SCF operator. (7) In the event of conflict between the requirements of this subsection (e), a master license agreement, and/or an SSL, the master license agreement shall have priority. (f) Abandonment and removal. If a SCF has not been in use for a period of three (3) months, the applicant shall notify the City of the non-use and indicate whether re-use is expected within the ensuing three (3) months. Any SCF that is not operated for a continuous period of six (6) months shall be considered abandoned without regard to whether the applicant has provided notice, and any SCF permit issued in connection therewith shall be deemed to have expired. (1) The City, in its sole discretion, may require an abandoned SCF to be removed. The applicant shall remove the same within thirty (30) days of the date on a written notice from the City. Upon removal, the land shall be restored and re-landscaped, at the applicant's expense, to the level of finish of the adjacent landscaped area. (2) If such SCF is not removed within said period, the City may remove it at the applicant's expense and any approved permits for the SCF shall thereupon expire. Reimbursement for all such removal costs shall be paid by applicant to the City prior to applicant's receipt of any additional permit under this Article. (3) In addition, a SCF shall be removed within one hundred twenty (120) days after notification by the City that the public highway is needed for expansion, construction, or reconstruction, or other use by the City for any city project. Such removal shall be at the sole expense of the applicant and if the applicant fails to remove the SCF within the said one hundred twenty (120) days, or such longer period as may be established in a master license agreement, the City may remove the SCF and charge the costs to the applicant. Reimbursement for all such removal costs shall be paid by the applicant to the City prior to issuance of any additional permit under this Article. (g) Rules and regulations. The Engineer may promulgate rules and regulations consistent with the provisions of this Article for the administration of SCF installations and extensions, including minor additions, revisions and corrections thereto as may, in the judgment of the Engineer, be necessary to better conform to good engineering and/or construction standards and practice. The Engineer shall approve only those proposed technical revisions that: (1) Are consistent with all existing policies relevant to the revisions, (2) Do not result in any significant additional cost to persons affected by the revision, and (3) Do not materially alter the standard or level of service to be accomplished through the specified infrastructure. Upon adoption of any technical revisions pursuant to this subsection (g), the Engineer shall provide to the City Clerk documentation of such technical revisions specifying the date upon which they shall become effective, and shall maintain said documentation on file in the permanent records of the City Clerk and shall make the same available for public inspection.
(Ord. No. 143, 2017, § 3, 12-5-17; Ord. No. 012, 2023, § 2, 2-7-23; Ord. No. 001, 2025, § 3, 1-21-25)
Ask a question about Fort Collins law
Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.
