Sec. 23-177. - Application, review procedures and requirements for small cell facilities in the public highways.

(a) Small cell facilities. Small cell facilities shall be a permitted use by right in all zoning districts, and permits shall be issued pursuant to this Article. (b) Submittal required. No new SCF shall be constructed and no collocation or modification to any SCF may occur except after a written request from an applicant, reviewed and approved by the Engineer and issuance of an encroachment permit in accordance with this Article. (c) Consolidated applications and collocation. (1) A single permit may be issued for siting and collocating multiple small cell facilities spaced to provide wireless coverage in a contiguous area, provided all associated equipment is underground, or attached to or inside an existing structure that provides required clearances for the SCFs' operation without the necessity of constructing any apparatus to extend an antenna more than five (5) feet above the existing structure. (2) Additional site-specific reviews are required when the applicant proposes a new vertical support structure or above-ground accessory equipment, pursuant to subsection (d)(2) and (3). (3) If any support structure must be constructed to achieve needed elevation or if an attachment adds more than ten (10) feet or ten percent (10%) to the height of an existing structure, the proposal is subject to additional review, as described in § 23-176(c)(1)b. The height limitation applies to cumulative increases and includes in the measurement any height additions previously approved under this Section. (d) Submittal requirements and review procedures for SCFs permit applications shall be reviewed pursuant to the following procedures: (1) Elements. A complete application for a permit under this Article must include the following: a. Application form, as provided by the Engineer; b. Executed master license agreement; c. A report, signed by a professional engineer in the State of Colorado, or a verified statement from a qualified radio frequency engineer, demonstrating or assuring that the site will be in full compliance with federal radio-frequency emissions standards for wireless facilities; d. Signal interference certification signed under penalty of perjury by the a professional engineer in the State of Colorado, representing that all SCFs covered by the application shall be designed, sited and operated in accordance with applicable federal signal interference requirements, and as otherwise described in § 23-175(c); e. Submittal fees; f. Scaled site plan, photo simulation, scaled elevation view and supporting drawings, calculations, showing the location and dimension of all improvements, including information concerning topography, setbacks, drives, parking, street trees, adjacent uses, drainage; g. Narrative for each new installation proposed in a residential zone district or within one hundred fifty (150) feet of an existing residential lot; and h. Proof of bonding and insurance satisfying the requirements of § 23-19 for any SCF installation that entails excavation of a public highway, in an amount determined in the Engineer's judgment under § 23-175(g); and i. Other information reasonably deemed by the Engineer to be necessary to assess compliance with this Article. Documents requiring signatures and seals by appropriate qualified professionals shall be provided by applicant prior to issuance of a permit under this Article. (2) Structural assessment. Prior to issuance of a SCF permit for any SCF proposing a new pole or attachment to a non-city-owned structure, the applicant shall submit a stamped and signed structural assessment for each new proposed SCF host support structure conducted by a professional engineer, licensed in the State of Colorado. a. When the structural assessment indicates a need for a stronger structure to address issues such as wind load factor, applicant shall provide a replacement structure at applicant's cost satisfactory to the Engineer in consultation with Fort Collins Utilities, as applicable. b. All costs for conducting an assessment under this subsection (2) shall be borne by the applicant, and shall be paid by the applicant prior to issuance of a permit under this Article. (3) New structures. All applications for new vertical structures associated with a SCF in a public highway shall demonstrate that other alternative siting options, including collocations, are not feasible. Notwithstanding anything in this Article to the contrary, all structures located in a public highway shall satisfy the location and design criteria set forth in §§ 23-174 and 23-176. (4) Decision. Any decision to approve, approve with conditions, or deny an application for a SCF permit, shall be in writing and supported by substantial evidence in a written record. The Engineer shall cause a copy of the decision to be provided to the applicant. The foregoing shall apply only to applications for SCF permits under this Article and shall not apply to any building, excavation, or any other permit issued pursuant to or required by other Articles of this Code. (e) Submittal requirements and review procedures for eligible facilities requests. (1) Application. The City shall prepare, and from time to time revise and make publicly available, an application form requiring the information necessary for the Engineer to consider whether the project covered by the application would: a. Result in a substantial change to the physical dimensions of the site; or b. Violate a generally applicable law, regulations, or other rule codifying objective standards reasonably related to public health and safety. The application may not require the applicant to demonstrate a need or business case for the proposed modification or collocation. (2) Type of review. Upon receipt of an application for an eligible facilities request pursuant to this Section, the Engineer shall review such application to determine whether the application so qualifies. (3) Timeframe for review. Subject to the tolling provisions of subsection (4) below, within sixty (60) days of the date on which an applicant submits a complete application under this Section, the Engineer shall act on the application unless they determine the application is not covered by this subsection. (4) Tolling of the timeframe for review. The 60-day review period begins to run when the application is filed, and may be tolled only by agreement of the Engineer and applicant, or in cases where the Engineer determines the application is incomplete: a. To toll the timeframe for incompleteness, the City must provide written notice to the applicant within thirty (30) days of receipt of the application, specifically delineating all missing documents or information required in the application; b. The timeframe for review begins running again when the applicant makes a supplemental written submission in response to the City's notice of incompleteness; and c. Following a supplemental submission, the City will notify the applicant within ten (10) days if the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in subsection (4)a. In the case of a second or subsequent notice of incompleteness, the City may not toll the shot clock by specifying missing information or documents that were not delineated in the original notice of incompleteness. (5) Failure to act. In the event the Engineer fails to act on a request seeking approval for an eligible facilities request within the timeframe for review (accounting for any tolling), the request shall be deemed granted. In such event, the grant becomes effective when the applicant notifies the City in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted. (6) Interaction with Telecommunications Act 47 U.S.C. § 332(c)(7). If the City determines that the applicant's request is not an Eligible Facilities Request as delineated in this subsection, the applicant shall be advised as to the relevant provisions of the City Code(s), including land use and/or development codes, that govern the process to consider the request, and whether the Code(s) requires any additional information that may be required to be submitted in order for the request to be considered complete. If the applicant subsequently indicates an intent for the proposal to be considered under the relevant section of the City Code(s) and submits all required information, the presumptively reasonable timeframe under 47 U.S.C. § 332(c)(7), as set forth in applicable federal and state law will begin to run from submittal of the proposal required information under the applicable provision of this Code. (f) Review procedures for collocating small cell facilities on an existing tower or base station. Within ten (10) business days of receipt of an application for a small cell facility that does not qualify as an EFR, the City shall provide written comments to the applicant determining completeness of the application and setting forth any modifications required to complete the application to bring the proposal into full compliance with the requirements of this subsection. (1) To toll the timeframe for incompleteness, the City must provide written notice to the applicant within ten (10) business days of receipt of the application, specifically delineating all missing documents or information required in the application. (2) The timeframe for review resets to zero (0) when the applicant makes a supplemental written submission in response to the City's notice of incompleteness. (3) Following a supplemental submission, the City will notify the applicant within ten (10) business days whether the supplemental submission provided the information identified in the original notice delineating missing information. If the application remains incomplete, the timeframe is tolled pursuant to the procedures identified in subparagraphs (1) and (2) of this paragraph. In the case of a second or subsequent notice of incompleteness, the City may not toll the shot clock by specifying missing information or documents that were not delineated in the original notice of incompleteness. (4) Final action on complete applications for small cell facilities in the public highways will be no more than sixty (60) days, provided all standards in this Section are met.

(Ord. No. 143, 2017, § 3, 12-5-17; Ord. No. 012, 2023, § 2, 2-7-23; Ord. No. 001, 2025, § 4, 1-21-25)