For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-176 — Design standards

Fort Collins Municipal Code (Supp. No. 156, Update 2: codified through Ordinance No. 122, 2026, enacted September 15, 2026) · Fort Collins Municipal Code § 23-176

Corpus is an independent public-information project, not the official City of Fort Collins website. Stable reference: corpuslaw.us/code/547ad594-3dad-44bd-9d55-ab2ea239bc46

Sec. 23-176. - Design standards.

(a) Standards. The requirements set forth in this Section shall apply to the location and design of all SCFs governed by this Article. To that end and to the maximum extent feasible, SCFs shall be designed and located to minimize their visual impacts, consistent with this Article. (b) Site design flexibility. To the maximum extent feasible, individual SCFs shall be installed to best conceal, and where not feasible camouflage, the SCF. The Engineer may nevertheless grant a modification of the standards in this Section, provided he or she finds the modification would not be detrimental to the public good, and that: (1) The plan in the application as submitted will promote the general purpose of the standard for which the modification is requested equally well or better than would a plan which complies with the standard for which a modification is requested; or (2) The granting of a modification from the strict application of any standard would, without impairing the intent and purpose of this Article, substantially alleviate an existing, defined and described problem of city-wide concern or result in a substantial benefit to the City by reason of the fact that the proposed SCF would substantially address an important community need specifically and expressly defined and described in the City's Comprehensive Plan or an adopted policy, ordinance or resolution of the City Council, and the strict application of such a standard would render the SCF practically infeasible; or (3) By reason of exceptional physical conditions or other extraordinary and exceptional situations, unique to the site, including, but not limited to, physical conditions, including shallowness or topography, or physical conditions which hinder the applicant's ability to overcome existing physical signal obstructions, the strict application of the standard sought to be modified would result in unusual and exceptional practical difficulties, or exceptional or undue hardship upon the applicant, provided that such difficulties or hardship are not caused by the act or omission of the applicant; or (4) The plan in the application as submitted will not diverge from the standards of this Article that are authorized by this Section to be modified except in a nominal, inconsequential way when considered from the perspective of the affected public highway, and will continue to advance the purposes of this Article. (c) Conditions. (1) Camouflage/concealment. All SCFs shall to the extent feasible, use concealment design techniques, and where not feasible utilize camouflage design techniques. a. Vault standards. No vault shall be larger than seventeen (17) cubic feet in volume. The following associated equipment may be located outside the primary equipment enclosure and, if so located, is not included in the calculation of vault volume: electric meter, concealment, telecommunications demarcation box, ground-based enclosures, back-up power systems, grounding equipment, power transfer switch, and cut-off switch. All vaults shall at a minimum meet ANSI/SCTE 77, Tier 15 standards for non-deliberate traffic applications. b. Pole standards. A small cell facility may be deployed in the public highway using vertical components of a street light pole or similar structure. Such facilities shall be subject to the following: 1. All utility poles approved under this Article to host SCFs shall be electrically and structurally sound, meeting all applicable structural requirements and permanent installation criteria of Chapter 5 of this Code and otherwise satisfy AASHTO and National Electric Code standards adopted under § 5-80 of this Code and applicable to City utility structures installed in public highways. 2. The pole or structure shall be no more than ten (10) feet higher (as measured from the ground to the top of the pole) than any existing utility or traffic signal within six hundred (600) feet of the pole or structure. 3. In no case shall any SCF be higher than forty (40) feet, unless the applicable support structure is already existing at a greater height prior to attachment of the SCF. 4. If the applicant is not the owner of the pole, it shall provide appropriately authorized written permission from the pole owner at the time the application is submitted, pursuant to § 23-175(d). c. Antenna. Except for a modification to an eligible support structure that qualifies as an EFR, no antenna shall extend more than five (5) feet above the principal host structure, relative to original height of such structure. Nor shall any antenna significantly exceed the diameter of any host structure to which the antenna is attached or exceed a total of eighteen (18) inches in diameter, including housing and shroud elements. d. Where the Engineer determines particular sensitivity (e.g., proximity to historic or aesthetically significant structures, views, and/or community features) warrants special consideration and in areas of high visibility, SCFs shall to the extent feasible be designed to minimize their profile. e. All visible SCF components, such as antennas, vaults, and equipment enclosures, shall be constructed of non-reflective materials, be painted to match the surrounding environment, and blend in with adjacent structures and vegetation. f. Any SCF sited on a traffic signal standard shall be designed so the antenna is placed in a manner so the size, appearance, and function of the traffic signal is not altered. (2) Hazardous materials. No hazardous materials shall be permitted in association with SCFs, except those necessary for the operations of the SCF and only in accordance with all applicable laws governing such materials. (3) Siting. a. All elements of SCF permitted under this Article shall be located principally within the boundaries of a public highway. b. The number of poles within the public highway shall be limited to the extent feasible and shall adhere to structural requirements set forth in an MLA. c. Applicants may be required to design and construct SCFs to accommodate equipment for at least two (2) service providers on the same structure, unless the Engineer approves an alternative design, to the extent feasible based upon construction, engineering and design standards. No applicant or SCF operator shall unreasonably exclude a telecommunications competitor from using the same facility or location. Upon request by the Engineer, the applicant shall provide evidence explaining why collocation is not feasible at a particular facility or site. No applicant shall unfairly exclude a competitor from using a site when collocation is feasible based upon applicable construction, engineering, and design standards. d. SCFs shall be sited in a location that does not alter or reduce parking or otherwise inhibit another principal uses of the public highway. e. Without regard to whether any portion of a SCF is approved to be installed above ground, all elements of a SCF shall be grouped as closely as feasible, contained within a total footprint area no greater than thirty-five (35) square feet, and otherwise located in a manner necessary to address public safety and aesthetic concerns in the reasonable discretion of the Engineer. f. A SCF shall not be located or maintained in a manner that causes unreasonable interference with a public highway. (4) Lighting. A SCF shall not be artificially lighted, unless required by the FAA or other applicable governmental authority, or the SCF is mounted on a structure primarily used for lighting purposes. If lighting is required, the City may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding views. Lighting shall be shielded or directed to the maximum extent feasible to minimize glare and light falling onto nearby properties. (5) Landscape requirements. a. SCFs shall be sited in a manner that does not reduce landscaped areas of the public highway. b. Applicants shall restore all landscaping impacted during SCF installation to City street vegetation standards. Supplemental landscaping will be a condition of approval for any SCF requiring visible ground-mounted equipment not internal to the support structure or in a below-grade vault. c. Existing tree growth and natural landforms on the site shall be preserved and negative impacts to tree canopies and root systems avoided to the extent feasible. d. No tree may be removed in siting a SCF, unless authorized by the City Forester. To obtain authorization the applicant shall show wireless services are not technically feasible without tree removal; the applicant's plan minimizes the total number of trees to be removed, avoids removal of any tree larger than four (4) inches at four and one-half (4 ½) feet high, and replaces any tree to be removed at a ratio of 2:1; and all new trees meet the replacement size standards in Section 5.10.1(D) of the Land Use Code. (6) Noise. Noise generated on the site must not exceed levels permitted in Chapter 20. (7) Anticipated redevelopment. If the built environment is anticipated to change significantly during the usable life of a SCF, such as within an urban renewal district, the SCF shall be compatible with the anticipated future-built environment. (8) Additional design requirements. Other requirements applicable to SCFs are specified below: a. Non-city utility structure attachments. If a SCF is installed on a City structure other than utility, light, or traffic infrastructure, the SCF shall be of a neutral, non-reflective color identical to, or closely compatible with, the color of the supporting structure, or use other camouflage/concealment design techniques to make the SCF as visually unobtrusive as possible, e.g., painting antennas and equipment, and meet the following: 1. All pole-mounted components of the SCF shall be located on or within an existing utility pole serving another utility; 2. To the extent feasible, the SCF shall be consistent with the size and shape of pole-mounted equipment installed by other service providers on utility poles near the SCF; and 3. The SCF shall be sized to minimize the negative aesthetic impacts to the public highway, and designed and constructed to resemble structures typically found in the area. b. Related Transmission Equipment. Transmission equipment, other than antennae must comply with § 23-174.

(Ord. No. 143, 2017, § 3, 12-5-17; Ord. No. 012, 2023, § 2, 2-7-23; Ord. No. 056, 2024, § 34, 5-7-24)

Ask a question about Fort Collins law

Corpus searches the Fort Collins sections it holds and shows the ones that match, with their citations. Free, no sign-in.