Sec. 20-460. - Wastewater discharge permitting; general permits.
(a) At the discretion of the director, the director may use general permits to control discharge to the POTW if the following conditions are met. All facilities to be covered by a general permit must: (1) Involve the same or substantially similar types of operations; (2) Discharge the same types of wastes; (3) Require the same effluent limitations; (4) Require the same or similar monitoring; and (5) In the opinion of the director are facilities more appropriately controlled under a general permit than under individual wastewater discharge permits. (b) To be covered by a general permit, a user must file a written request for coverage that identifies its contact information, production processes, the types of wastes generated, the location for monitoring all wastes covered by the general permit, any requests in accordance with section 20-473(b) for a monitoring waiver for a pollutant neither present nor expected to be present in the discharge, and any other information the director deems appropriate. A monitoring waiver for a pollutant neither present nor expected to be present in the discharge is not effective in the general permit until after the director has provided written notice to the user that such a waiver request has been granted in accordance with section 20-473(b). (c) The director will retain a copy of the general permit, documentation to support the POTW's determination that a specific user meets the criteria in subsections (a)(1) through (5) of this section and applicable state regulations, and a copy of the user's written request for coverage for three years after the expiration of the general permit. (d) The director may not control an SCIU through a general permit where the facility is subject to production-based categorical pretreatment standards or categorical pretreatment standards expressed as mass of pollutant discharged per day or for users whose limits are based on the combined waste stream formula in section 20-422(c) or net/gross calculations in section 20-422(e).
(Code 1994, § 14.11.265; Ord. No. 30, 2013, § 1, 10-15-2013; Ord. No. 41, 2021, § 17(app. A, § 17), 10-19-2021)