For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-473 — Baseline monitoring reports

Municipal Code of the City of Greeley, Colorado (Codified through Ordinance No. 16, 2026, enacted April 21, 2026 (Supp. No. 6, Update 1)) · Greeley Municipal Code § 20-473

Corpus is an independent public-information project, not the official City of Greeley website. Stable reference: corpuslaw.us/code/e12504bb-9f98-4e1f-8e70-f1ff85231841

Sec. 20-473. - Baseline monitoring reports.

(a) Generally. Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 C.F.R. 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the director a report containing the information listed in subsection (b) of this section. At least 90 days prior to commencing discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the director a report containing the information listed in subsection (b) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall estimate the anticipated flow and quantity of pollutants it will discharge. (b) Required information of report. Each user described in subsection (a) of this section shall submit a report containing the following information: (1) Identifying information. The name and address of the facility, including the name of the operator and owner. (2) Environmental permits. A list of all environmental control permits held by or for the facility. (3) Description of operations. A brief description of the user's operations and average production rates, including identification of all applicable North American Industry Classification System Codes. This description should include a schematic process diagram that indicates points of discharge to the POTW from the regulated processes. (4) Flow measurement. The measured average daily and maximum daily flow, in gpd, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 C.F.R. 403.6(e). (5) Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process. b. The results of sampling and analysis identifying the nature and concentration, and/or mass where required by the categorical standard or by the director, of regulated pollutants in the discharge from each regulated process. The information shall include a chain of custody record. c. Instantaneous, daily maximum and long-term average concentrations, or mass where required. d. The sample shall be representative of daily operations and shall be analyzed according to procedures set out in section 20-483. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the director or the applicable standards to determine compliance with the standard. e. The user must sample according to the procedures set out in section 20-484. f. The user shall take a minimum of one representative sample to compile that data necessary to comply with the requirements of this subsection. g. The user should take samples immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined waste stream formula in 40 C.F.R. 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternative concentration or mass limit has been calculated in accordance with 40 C.F.R. 403.6(e), the user shall submit this adjusted limit along with supporting data to the POTW. h. The director may allow the user to submit a baseline report that utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. i. The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis accurately represent normal work cycles and expected pollutant discharges to the POTW. (6) Certification. A statement, reviewed by the authorized representative of the user and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional O&M and/or additional pretreatment is required to meet the pretreatment standards and requirements. (7) Compliance schedule. If additional pretreatment and/or O&M is required to meet the categorical pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M shall be submitted. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this chapter must meet the requirements set out in section 20-474 and, when applicable, submitted in accordance with 40 C.F.R. 403.12(b)(7)(i-ii). (8) Signature and report certification. All baseline monitoring reports must be signed and certified in accordance with section 20-487(a).

(Code 1994, § 14.11.390; Ord. No. 35, 2008, § 1, 8-19-2008; Ord. No. 41, 2021, § 26(app. A, § 26), 10-19-2021)

Ask a question about Greeley law

Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.