Sec. 20-476. - Periodic self-monitoring compliance reports.
(a) An SIU shall submit periodic reports that indicate the nature and concentration of pollutants in its discharge that are limited by a pretreatment standard, along with the measured daily flows. The information shall include a chain of custody record. The director shall establish the schedule for such reporting in the SIU's wastewater discharge permit. Such schedule shall require submittal of the reports at a frequency of no less than every six months. In cases where the pretreatment standard requires compliance with a BMP or pollution prevention alternative, the user must submit documentation as required by the director or the applicable Standard to determine the compliance status of the user. All periodic compliance reports must be signed and certified according to section 20-487(a). (b) All reports under this section are due 30 days following the end of the reporting period stated in the SIU's permit. (c) All wastewater samples required under this section must be representative of the SIU's discharge. The SIU shall properly operate and maintain all wastewater monitoring and flow measurement facilities. Failure of an SIU to keep its monitoring facility in good working order shall not be grounds for the SIU to claim that sample results are unrepresentative of its discharge. (d) If an SIU subject to the reporting requirement in this section monitors any pollutant more frequently than required by the director using the procedures prescribed in section 20-484, the SIU shall include the results of this monitoring in the periodic compliance report. (e) The director may authorize a user subject to a categorical pretreatment standard to forego sampling of a pollutant regulated by a categorical pretreatment standard if the user has demonstrated through sampling and other technical factors that the pollutant is neither present nor expected to be present in the discharge, or is present only at background levels from intake water and without any increase in the pollutant due to activities of the industrial user. (See 40 C.F.R. 403.12(e)(2).) This authorization is subject to the following conditions: (1) The waiver may be authorized where a pollutant is determined to be present solely due to sanitary wastewater discharged from the facility provided that the sanitary wastewater is not regulated by an applicable categorical standard and otherwise includes no process wastewater. (2) The monitoring waiver is valid only for the duration of the effective period of the individual wastewater discharge permit, but in no case longer than five years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual wastewater discharge permit. See section 20-459(9). (3) In making a demonstration that a pollutant is not present, the user must provide data from at least one sampling of the facility's process wastewater prior to any treatment present at the facility that is representative of all wastewater from all processes. (4) The request for a monitoring waiver must be signed in accordance with section 20-487 and include the certification statement in section 20-487(c). (5) Non-detectable sample results may be used only as a demonstration that a pollutant is not present if the EPA approved method from 40 C.F.R. part 136 with the lowest minimum detection level for that pollutant was used in the analysis. (6) Any grant of the monitoring waiver by the director must be included as a condition in the user's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the director for three years after expiration of the waiver. (7) Upon approval of the monitoring waiver and revision of the user's permit by the director, the user must certify on each report with the statement in section 20-487(c), that there has been no increase in the pollutant in its wastestream due to activities of the user. (8) In the event that a waived pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately comply with the monitoring requirements of section 20-476(a), or other more frequent monitoring requirements imposed by the director, and notify the director. (9) This provision does not supersede certification processes and requirements established in categorical pretreatment standards, except as otherwise specified in the categorical pretreatment standard.
(Code 1994, § 14.11.420; Ord. No. 35, 2008, § 1, 8-19-2008; Ord. No. 41, 2021, § 28(app. A, § 28), 10-19-2021)
Ask a question about Greeley law
Corpus searches the Greeley sections it holds and shows the ones that match, with their citations. Free, no sign-in.