Sec. 21-69. - Excavation of newly paved roadways.
Contractors shall be advised that the city enforces a moratorium on the issuance of excavation permits on newly paved roads. No permit will be issued for a period of five (5) years after a roadway is paved to install main line utilities, and three (3) years to install laterals. If required, restoration shall include the milling and paving of the roadway curb-to-curb, or a full lane width at the contractor's expense, as agreed upon by the utility company and the department of public works. Said work shall be performed by the department of public works. Restoration of pavement for lateral installation, during the moratorium period, shall consist of milling a larger patch (two (2) feet around perimeter of temporary patch) and repaving in accordance with department of public works specifications. Work shall include the installation of a full pavement depth (four-inch minimum) in the area of the temporary patch.
(Ord. of 6-11-24)
Ask a question about Bristol law
Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.