Sec. 21-70. - Excavation within city streets.

Pavement and/or sidewalks shall be cut or sawn to straight neat lines. Excavation without cutting or sawing is not allowed. Cutline shall be parallel, and six (6) inches minimum, outside either edge of the proposed trench. Tunneling under pavement or sidewalks is not allowed. Bituminous material, cement concrete, ledge, rocks and boulders over six (6) inches in any dimension, shall be removed from the job, together with any clay, silt, or organic material. The public works inspector will check the material excavated and will allow re-use as backfill, sandy and/or gravelly material. Material not approved of shall be disposed of from the job site. Backfill shall be approved sandy gravelly material with no stones over six (6) inches in any dimension. Backfill shall be compacted in 15-inch lifts or layers using mechanical compaction equipment approved by the department of public works. The trench shall be filled to within eleven (11) inches of the finished grade, consisting of nine (9) inches of approved processed gravel which shall be spread and compacted, then two (2) inches of bituminous concrete temporary pavement which shall be spread and compacted, and the finished material flush with the adjacent existing surface. The limits of permanent patch shall be established/confirmed at the completion of work/installation of temporary asphalt patch. Permanent patches shall extend six (6) inches beyond the temporary patch, and require the contractor to recut the roadway asphalt. The City of Bristol may require the installation of additional roadway asphalt patch to improve road conditions, and may extend the permanent patch limits to include older patches or road defects. If the city requires the replacement of additional roadway, the cost of the additional work will be paid for by the city, or the utility company will pay the city the application cost of the required patch (not including the additional work) and the city will install the entire/desired permanent patch that is required to repair the utilities work and the road defect. All utility boxes shall be installed flush with pavement. Bituminous concrete material shall be "hot mix," except during the winter season when plants are closed. "Cold patch" may be used with prior authorization and approval by the department of public works. During the period between temporary patch and permanent patch, the utility contractor shall be responsible for maintaining the patch, and shall promptly correct all defects upon order of the director of public works. Failure by the contractor to maintain the trench in a safe condition will result in the department of public works performing the work and charging the contractor for said repairs. The storage of materials or equipment within the city's right-of-way is not allowed, unless authorized by the public works engineering division, or the director of public works. The site shall be cleaned and swept at the end of each day. The blocking of private driveways is prohibited.

(Ord. of 6-11-24)