Sec. 21-71. - Permanent patching and restoration of city streets.

All temporary pavement patches shall be removed and replaced after one (1) year with a permanent pavement patch or pavement restoration. Annually, the department of public works will procure the services of a paving contractor to remove temporary pavement patches installed as part of the department of public works permit defined in this division. The procured paving contractor will install all permanent pavement patches installed within the last year. Permit holders are not authorized or permitted to install permanent roadway patches unless otherwise approved by the board of public works. At the time of issuance of an excavation permit, the contractor shall deposit a fee equal to the estimated cost of the permanent patch. Upon completion, the actual patch will be measured, and the contractor shall be billed for any permanent patch cost to the city that exceeds the amount deposited by the contractor. If the permanent patch cost to the city is less than the amount deposited with the city, the contractor will receive a credit. Calculation of estimated patch costs will be based on trench length and width (width shall be diameter of pipe plus thirty-six (36) inches, minimum forty-eight (48) inches, plus twelve (12) inches for every foot to depth of trench). Permits will not be issued to contractors owing the city any permanent patch fees. The city may institute legal action against contractors and those responsible for nonpayment of any permanent patch costs owed to the city if any permanent patch fee is not paid within ninety (90) days of the due date. The department of public works shall calculate the unit pavement cost based on the pavement contractor's cost with a twenty (20) percent escalator for charging contractors, that year, for trench permanent patching. The public works department shall keep a written record of all trenches including: the dates of excavation, temporary patches and permanent patches, deposit fees received, estimated final fees and actual final fees, the balances owed or the credits due, and the exact locations and types of utilities. The city shall maintain a separate non-interest bearing fund for permanent patching of all city streets. All payments by contractors or persons excavating in a public right-of-way shall be deposited in the fund, and payments for completed permanent patching shall be disbursed from the fund. All contractors shall be required to identify the temporary pavement trenches by spray painting the company's name at several locations, based on the size of the trench, as determined by the department of public works. Work performed by public utility companies, or contractors performing the work for the public utility, shall identify the trench using the public utility companies' names. Public utility contractors authorized by the department of public works are permitted to install their own permanent patch. However, all work must be performed in accordance with department of public works requirements and specifications. Based on roadway pavement, public utility companies may be required by the department of pubic works to restore roadway pavement by milling and paving roadway sections, either curb to curb or full travel lane widths. Said pavement restoration (milling and paving) shall be paid for at the sole expense of the public utility company or the utility company may fund the city performing the work. All permanent pavement installation and roadway pavement restoration shall confirm with city standards and specifications. Existing bituminous material shall be removed, existing pavement shall be cut to reasonably straight longitudinal lines, transverse jogs within ten (10) feet of each other shall not be accepted, and transverse cuts shall be perpendicular to the longitudinal cut. Several small excavations shall be widened into one. If existing pavement has cracked due to trench settlement, the edge of the trench shall be cut beyond such cracks to firm true pavement. The subgrade shall be graded and compacted to four (4) inches below finished grade. The contractor shall add any necessary processed gravel to bring trench to subgrade, care shall be taken to keep processed gravel tight under adjacent pavement. The edge of existing bituminous shall be painted with hot liquid asphalt prior to paving. Transverse joints in new patch shall be cut square and painted with hot liquid asphalt. Bituminous material shall be placed in two (2) equal compacted layers of one and one-half (1½) inches. Finished surface shall meet existing surface neat and true. The edges of completed patch shall be sealed with an application of hot liquid asphalt three (3) inches minimum wide. The department of public works may expand the permanent patch limits and increase the area of the permanent patch to correct roadway defects that existed prior to work performed in accordance with the permit. Said work shall be paid for by the city.

(Ord. of 6-11-24)