§ 22-54 — Tile lines and laterals
Code of Ordinances of the City of Bristol, Connecticut (Codified through Amendments of February 11, 2025, effective February 28, 2025. (Supp. No. 4)) · Bristol Code of Ordinances § 22-54
Corpus is an independent public-information project, not the official City of Bristol website. Stable reference: corpuslaw.us/code/c4769b90-7292-4a64-acc9-e38a45f80f92
Sec. 22-54. - Tile lines and laterals.
(a) The minimum lineal feet of tiled lines with open joints in stone-filled trenches of leaching fields shall be, for one family, one hundred (100) in class A soil, one hundred fifty (150) in class B soil and three hundred (300) in class C soil. These dimensions may be modified to suit local conditions provided equivalent absorptive area is made available. Under normal conditions however, trench width should not exceed twenty-four (24) inches. (b) Unglazed drain tile, four (4) inches in diameter, laid with open joints one-quarter to one-half inch in shallow trenches of the width indicated and about eighteen (18) inches deep may be used. Pipe of vitrified tile or other acceptable material with suitable perforations or adequate spacing may also be used. All trenches should follow contours with the bottoms of the individual trenches level. The upper portions of joint openings should be protected by strips of tar paper or other suitable material. Tile shall be laid near the top of a layer of one-inch screened gravel or broken stone placed to a depth of twelve (12) inches in the trenches. (c) The minimum depth of stone under tile invert shall be at least one-half the width of trench. Bottom trench area only shall be laid on a grade not exceeding two (2) to four (4) inches per one hundred (100) feet. A layer of tar paper shall be placed over open tile joints before backfilling the trenches. Spacing between adjacent sides of trenches for the tile lines shall be at least three (3) times the width of the trench. (d) When space between trenches is also excavated and backfilled with one-inch stone or screened gravel, only one-third of the total bottom shall be considered effective. Construction shall be such as to provide for proper distribution of settled sewage to trenches, is secured in tile fields by using diverting boxes with several outlets of the same elevation to the individual trenches. (e) Length of individual tile laterals shall not exceed forty (40) feet. (f) If the slope of the main header exceeds one (1) foot per hundred feet, provision shall be made for reducing the velocity of the septic tank effluent at the head of the seepage system by properly located and constructed distribution box or drop manhole construction. Depth of lateral inverts below ground surface should preferably be between twelve (12) inches and twenty-four (24) inches, but depths up to thirty-six (36) inches or greater may be used if warranted by conditions of topography or more favorable absorption capacity of soil at that depth.
(Code 1960, § 7-10)
Ask a question about Bristol law
Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.
