For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

I — IN GENERAL

Code of Ordinances of the City of New Haven, Connecticut (Supp. No. 31: codified through Ordinance No. 2025-0018, enacted September 11, 2025), New Haven, CT · 56 sections. Independent public-information project, not the official City of New Haven website.

  1. § 25-1 — Creation, purpose and definitions
  2. § 25-2 — Construction—Location; duty to leave easement strip when excavating strips
  3. § 25-3 — Same—Preparation of plans, maps, by city engineer
  4. § 25-4 — Precautions required in making excavations for sewer connections
  5. § 25-5 — Clogging catch basins, gully-shoots
  6. § 25-6 — Connections to be by licensed person, conform to directions of city engineer
  7. § 25-7 — Pipe diameter for connections
  8. § 25-8 — Grade, line of connections; trap ventilation required
  9. § 25-9 — Multiple connections through one drain
  10. § 25-9.1 — Storm leader separation
  11. § 25-10 — Damage to or interference with sewer system, storm sewer or sewage works
  12. § 25-11 — Rates established
  13. § 25-12 — Rates for property located outside city
  14. § 25-13 — No reduced rates or free service permitted
  15. § 25-14 — Determination of charges; generally
  16. § 25-15 — Allowance for metered water not discharged into city's sanitary sewer system
  17. § 25-16 — Engineering study to determine charge for industrial, commercial and institutional users where portion of water not discharged into sewer
  18. § 25-17 — Billing where company does not supply water for all multiple living unit connections
  19. § 25-18 — Deductions for vacancies in apartments; removal of apartments from services
  20. § 25-19 — Billing
  21. § 25-20 — Collection procedures
  22. § 25-21 — Adjustment of bill
  23. § 25-22 — Discontinuance of service for failure to pay
  24. § 25-23 — Continued use of sewer after refusal to pay
  25. § 25-24 — Implementation of chapter
  26. § 25-25 — Violations; furnishing WPCA false information; severability
  27. § 25-26 — Permits
  28. § 25-27 — Permit issuance and renewal
  29. § 25-28 — Permit conditions
  30. § 25-29 — Permit suspension or revocation
  31. § 25-30 — Quantity determination
  32. § 25-31 — Quality determination
  33. § 25-32 — Standard of quality of discharge
  34. § 25-33 — Accidental discharges
  35. § 25-34 — Changes of ownership
  36. § 25-35 — Pretreatment
  37. § 25-36 — Testing waste water
  38. § 25-37 — Trade secrets
  39. § 25-38 — Protection from damage
  40. § 25-39 — Computation of WPCA's average unit costs
  41. § 25-40 — Computation of industrial user charges
  42. § 25-41 — Charges effective after meters read; installation of meters
  43. § 25-42 — Enforcement
  44. § 25-43 — Penalty for violation of chapter
  45. § 25-44 — Establishment of a sewer fund
  46. § 25-45 — Accounting and recordkeeping
  47. § 25-46 — Annual audit
  48. § 25-47 — Establishment of a Water Pollution Control Authority
  49. § 25-48 — Members, terms, officers, quorum, compensation, employees, financial interest, removal from office
  50. § 25-50 — Cost of service study
  51. § 25-51 — Powers
  52. § 25-52 — Organization of sewer staff
  53. § 25-53 — Authority to incur debt
  54. § 25-54 — Flow of funds
  55. § 25-55 — Budgeting
  56. § 25-56 — Advisory committee